[{"id":343,"contract_id":"AR6-KFS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"KILN FIELDS RENEWABLE ENERGY LIMITED","counterparty_registration_no":"13359331","counterparty_address":"1350-1360 Montpellier Court, Brockworth, Gloucester, GL3 4AH, United Kingdom","project_name":"Kiln Fields Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:01.842092Z","start_date":"2026-04-01","expected_start_date":"2026-04-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-01-02","long_stop_date":"2027-04-02","initial_installed_capacity":"17.87","current_installed_capacity":"15.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.32750000","longitude":"-0.96350000","coordinates":"N: 51.332, -0.96\nE: 51.326, -0.959\nS: 51.324, -0.966\nW: 51.328, -0.969","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"2.87","capacity_whole_station":null,"polymorphic_ctype":6},{"id":115,"contract_id":"AR5-MVI-510","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"VERDANT MORLAIS LTD","counterparty_registration_no":"SC788048","counterparty_address":"24 Great King Street, Edinburgh, EH3 6QN, United Kingdom","project_name":"Morlais Verdant Isles BL3","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-05-12T01:00:01.974149Z","start_date":null,"expected_start_date":"2028-04-02","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"4.90","current_installed_capacity":"4.90","initial_strike_price":"198.00","current_strike_price":"294.31","latitude":"53.28200000","longitude":"-4.69900000","coordinates":"N: 53.294, -4.708\nE: 53.27, -4.686\nS: 53.27, -4.694\nW: 53.294, -4.708","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":163,"contract_id":"AR4-HFS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SPRING DEV 01 LIMITED","counterparty_registration_no":"11490072","counterparty_address":"Leytonstone House, 3 Hanbury Drive, London, E11 1GA, United Kingdom","project_name":"Houndbeare Farm Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-08-11T01:00:01.617670Z","start_date":"2026-06-30","expected_start_date":"2026-06-30","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"14.04","current_installed_capacity":"10.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"50.73425000","longitude":"-3.34050000","coordinates":"N: 50.737, -3.345\nE: 50.734, -3.335\nS: 50.731, -3.337\nW: 50.735, -3.345","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"3.51","capacity_whole_station":null,"polymorphic_ctype":6},{"id":32,"contract_id":"AR5-LHW-600","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"EDP RENEWABLES UK LIMITED","counterparty_registration_no":"SC297087","counterparty_address":"Atria One, 1st Floor, 50 Lothian Road, Edinburgh, EH3 9BY, United Kingdom","project_name":"Lurg Hill Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-09-03T01:00:01.442813Z","start_date":null,"expected_start_date":"2029-01-01","termination_date":null,"target_commissioning_date":"2027-01-01","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2029-01-01","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"52.29","current_strike_price":"77.19","latitude":"57.61125000","longitude":"-2.82225000","coordinates":"N: 57.627, -2.812\nE: 57.611, -2.81\nS: 57.602, -2.833\nW: 57.605, -2.834","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":231,"contract_id":"AAA-ENV-169","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Enviroparks Operations Ltd","counterparty_registration_no":"07034699","counterparty_address":"Tiverton Chambers, Lion Street, Abergavenny, NP7 5PN, United Kingdom","project_name":"Enviroparks Hirwaun Generation Site","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2025-09-11T01:00:01.154992Z","start_date":null,"expected_start_date":null,"termination_date":"2019-05-29","target_commissioning_date":"2018-03-31","target_commissioning_window_start_date":"2018-03-31","long_stop_date":"2020-03-30","initial_installed_capacity":"11.00","current_installed_capacity":"11.00","initial_strike_price":"119.89","current_strike_price":"134.86","latitude":"51.74975000","longitude":"-3.49400000","coordinates":"N: 51.751, -3.541\nE: 51.751, -3.357\nS: 51.748, -3.537\nW: 51.749, -3.541","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":188,"contract_id":"AR4-SDS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"FP LUX SCURF DYKE SOLAR LIMITED","counterparty_registration_no":"11761629","counterparty_address":"22 Chancery Lane, London, WC2A 1LS, United Kingdom","project_name":"Scurf Dyke Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-03T01:00:12.017498Z","start_date":"2026-04-01","expected_start_date":"2026-04-01","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.95400000","longitude":"-0.40575000","coordinates":"N: 53.961, -0.415\nE: 53.952, -0.395\nS: 53.946, -0.397\nW: 53.957, -0.416","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":483,"contract_id":"AR7-DWI-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"DEWSHILL WIND FARM LIMITED","counterparty_registration_no":"16390690","counterparty_address":"35 Westgate, Huddersfield, HD1 1PA, United Kingdom","project_name":"DEWSHILL WIND FARM","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:04.540384Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"11.40","current_installed_capacity":"11.40","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"55.86200000","longitude":"-3.83700000","coordinates":"N: 55.864, -3.839\nE: 55.861, -3.83\nS: 55.86, -3.83\nW: 55.863, -3.849","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":420,"contract_id":"AR7-NVW-011","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORFOLK VANGUARD WEST LIMITED","counterparty_registration_no":"08141115","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Norfolk Vanguard West CFD Unit A Phase 1","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:05.652436Z","start_date":null,"expected_start_date":"2028-07-08","termination_date":null,"target_commissioning_date":"2028-07-01","target_commissioning_window_start_date":"2028-07-01","long_stop_date":"2031-06-30","initial_installed_capacity":"690.00","current_installed_capacity":"615.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"52.87525000","longitude":"2.45900000","coordinates":"N: 52.933, 2.463\nE: 52.881, 2.571\nS: 52.801, 2.444\nW: 52.886, 2.358","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"75.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":151,"contract_id":"AR4-CLF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"CLIFTON SOLAR LTD.","counterparty_registration_no":"11677028","counterparty_address":"Voltalia UK Ltd, The Wheelhouse, Bond's Mill Estate, Stonehouse, Gloucestershire, GL10 3RF, United Kingdom","project_name":"CLIFTON","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-08-15T01:00:01.842731Z","start_date":"2026-08-14","expected_start_date":"2026-10-02","termination_date":null,"target_commissioning_date":"2025-10-02","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2026-10-02","initial_installed_capacity":"35.00","current_installed_capacity":"35.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"50.90900000","longitude":"-2.59875000","coordinates":"N: 50.913, -2.599\nE: 50.911, -2.59\nS: 50.904, -2.603\nW: 50.908, -2.603","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":264,"contract_id":"AR4-SFH-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SOUTH FAMBRIDGE HALL SOLAR PARK LIMITED","counterparty_registration_no":"08514444","counterparty_address":"Uk House 5th Floor, 164-182 Oxford Street, London, W1D 1NN, United Kingdom","project_name":"South Fambridge Hall Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-09-16T01:00:01.700099Z","start_date":"2026-09-15","expected_start_date":"2026-09-15","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-10-01","initial_installed_capacity":"45.00","current_installed_capacity":"45.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.62600000","longitude":"0.69175000","coordinates":"N: 51.632, 0.69\nE: 51.628, 0.704\nS: 51.622, 0.687\nW: 51.622, 0.686","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":17,"contract_id":"AR4-DBF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"DOWN BARN FARM SF LIMITED","counterparty_registration_no":"08935004","counterparty_address":"4th Floor, 1 Tudor street, London, EC4Y 0AH, United Kingdom","project_name":"Down Barn Farm Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.427477Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"45.99","current_strike_price":"61.51","latitude":"51.19300000","longitude":"-1.68875000","coordinates":"N: 51.2, -1.688\nE: 51.192, -1.674\nS: 51.186, -1.698\nW: 51.194, -1.695","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":48,"contract_id":"AR4-SLF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SPARROW LODGE SOLAR LIMITED","counterparty_registration_no":"11780299","counterparty_address":"4th Floor, 1 Tudor street, London, EC4Y 0AH, United Kingdom","project_name":"Sparrow Lodge Farm Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.442672Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"45.99","current_strike_price":"61.51","latitude":"52.03750000","longitude":"-0.90250000","coordinates":"N: 52.042, -0.901\nE: 52.037, -0.896\nS: 52.034, -0.903\nW: 52.037, -0.91","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":54,"contract_id":"AR4-TFP-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"TUCKEY FARM SOLAR LIMITED","counterparty_registration_no":"11132054","counterparty_address":"4th Floor, 1 Tudor street, London, EC4Y 0AH, United Kingdom","project_name":"Tuckey Farm PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.458371Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"45.99","current_strike_price":"61.51","latitude":"51.93550000","longitude":"-0.90300000","coordinates":"N: 51.941, -0.911\nE: 51.932, -0.893\nS: 51.929, -0.894\nW: 51.94, -0.914","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":162,"contract_id":"AR5-GRG-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"AURA POWER SOLAR UK 5 LTD","counterparty_registration_no":"11943091","counterparty_address":"30 Queen Square, Penthouse Office, Bristol, BS1 4ND, United Kingdom","project_name":"Grim12 Grimsby","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-10-24T01:00:02.685984Z","start_date":null,"expected_start_date":"2026-11-30","termination_date":null,"target_commissioning_date":"2026-03-31","target_commissioning_window_start_date":"2026-01-01","long_stop_date":"2027-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"53.56100000","longitude":"-0.17250000","coordinates":"N: 53.566, -0.163\nE: 53.561, -0.157\nS: 53.556, -0.18\nW: 53.561, -0.19","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":30,"contract_id":"AR5-KEK-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"FURUD SOLAR LTD","counterparty_registration_no":"13033375","counterparty_address":"30 Queen Square, Penthouse Office, Bristol, BS1 4ND, United Kingdom","project_name":"Kemb04 Kemble","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-07-04T01:00:02.454101Z","start_date":"2026-07-03","expected_start_date":"2026-07-03","termination_date":null,"target_commissioning_date":"2026-03-31","target_commissioning_window_start_date":"2026-01-01","long_stop_date":"2027-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.65900000","longitude":"-2.03300000","coordinates":"N: 51.667, -2.033\nE: 51.657, -2.038\nS: 51.654, -2.037\nW: 51.658, -2.024","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":464,"contract_id":"AR7-BEE-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"ELANOR SOLAR LIMITED","counterparty_registration_no":"11761818","counterparty_address":"58 Marylebone High Street, London, W1U 5HT, United Kingdom","project_name":"Belvoir","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:01.983050Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-04-01","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.92700000","longitude":"-0.78350000","coordinates":"N: 52.935, -0.783\nE: 52.924, -0.774\nS: 52.915, -0.785\nW: 52.934, -0.792","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":521,"contract_id":"AR7-FLS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"FIVE LANES SOLAR LIMITED","counterparty_registration_no":"12639859","counterparty_address":"Unit 1 Imperial Court, Exchange Street East, Liverpool, L2 3AB, United Kingdom","project_name":"Five Lanes Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:02.128208Z","start_date":null,"expected_start_date":"2028-10-31","termination_date":null,"target_commissioning_date":"2028-10-31","target_commissioning_window_start_date":"2028-10-01","long_stop_date":"2030-09-30","initial_installed_capacity":"31.58","current_installed_capacity":"31.58","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.61025000","longitude":"-2.09450000","coordinates":"N: 51.616, -2.099\nE: 51.609, -2.086\nS: 51.605, -2.089\nW: 51.611, -2.104","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":359,"contract_id":"AR6-MSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BISHOPSTONE SOLAR LIMITED","counterparty_registration_no":"13732467","counterparty_address":"80 Strand, London, WC2R0DT, United Kingdom","project_name":"Moat Farm Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-29T01:00:02.610484Z","start_date":null,"expected_start_date":"2026-12-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2027-07-01","initial_installed_capacity":"20.34","current_installed_capacity":"20.34","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.78200000","longitude":"-0.81450000","coordinates":"N: 51.786, -0.817\nE: 51.781, -0.809\nS: 51.78, -0.813\nW: 51.781, -0.819","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":205,"contract_id":"AR5-BWI-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Benbrack Wind Farm Limited","counterparty_registration_no":"12971043","counterparty_address":"C/O Cms Cameron Mckenna Nabarro Olswang Llp Cannon Place, 78 Cannon Street, London, EC4N 6AF, United Kingdom","project_name":"Benbrack Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-06-24T01:00:03.308013Z","start_date":"2026-06-19","expected_start_date":"2026-08-31","termination_date":null,"target_commissioning_date":"2025-05-01","target_commissioning_window_start_date":"2025-05-01","long_stop_date":"2027-05-01","initial_installed_capacity":"31.10","current_installed_capacity":"31.10","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"55.28075000","longitude":"-4.30600000","coordinates":"N: 55.29, -4.314\nE: 55.273, -4.296\nS: 55.272, -4.297\nW: 55.288, -4.317","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":68,"contract_id":"AR5-BBL-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"AURA POWER SOLAR UK 4 LTD","counterparty_registration_no":"11943025","counterparty_address":"30 Queen Square, Penthouse Office, Bristol, BS1 4ND, United Kingdom","project_name":"Burt20 Burtree Lane","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-09-18T01:00:02.135655Z","start_date":null,"expected_start_date":"2027-01-31","termination_date":null,"target_commissioning_date":"2026-03-31","target_commissioning_window_start_date":"2026-01-01","long_stop_date":"2027-04-01","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"54.56500000","longitude":"-1.57475000","coordinates":"N: 54.572, -1.574\nE: 54.562, -1.57\nS: 54.561, -1.571\nW: 54.565, -1.584","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":155,"contract_id":"AR4-DWE-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"DOUGLAS WEST EXTENSION LTD","counterparty_registration_no":"SC587662","counterparty_address":"320 St Vincent Street, Glasgow, G2 5AD, United Kingdom","project_name":"Douglas West Extension","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.544234Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-03-31","initial_installed_capacity":"71.50","current_installed_capacity":"71.50","initial_strike_price":"42.47","current_strike_price":"52.25","latitude":"55.56800000","longitude":"-3.90250000","coordinates":"N: 55.576, -3.898\nE: 55.571, -3.875\nS: 55.557, -3.919\nW: 55.568, -3.918","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":234,"contract_id":"AR4-HCW-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"HIGH CONSTELLATION WINDFARM LIMITED","counterparty_registration_no":"11800500","counterparty_address":"22 Chancery Lane, London, WC2A 1LS, United Kingdom","project_name":"High Constellation Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.506953Z","start_date":null,"expected_start_date":"2025-12-01","termination_date":"2024-02-09","target_commissioning_date":"2025-12-01","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-03-31","initial_installed_capacity":"50.00","current_installed_capacity":"50.00","initial_strike_price":"42.47","current_strike_price":"52.25","latitude":"55.76200000","longitude":"-5.52525000","coordinates":"N: 55.964, -5.5\nE: 55.695, -5.548\nS: 55.682, -5.508\nW: 55.707, -5.545","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":136,"contract_id":"AR4-WLS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"WOOD LANE SOLAR LIMITED","counterparty_registration_no":"11780132","counterparty_address":"4th Floor, 1 Tudor street, London, EC4Y 0AH, United Kingdom","project_name":"Wood lane Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.554285Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"45.99","current_strike_price":"61.51","latitude":"53.35175000","longitude":"-0.84375000","coordinates":"N: 53.356, -0.836\nE: 53.356, -0.836\nS: 53.344, -0.842\nW: 53.351, -0.861","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":183,"contract_id":"AR4-NOR-013","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"NORFOLK BOREAS LIMITED","counterparty_registration_no":"03722058","counterparty_address":"5th Floor 70, St Mary Axe, London, EC3A 8BE, United Kingdom","project_name":"Norfolk Boreas (Phase 3)","base_year":2012,"agreement_type":"Phased","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.572882Z","start_date":null,"expected_start_date":"2030-03-29","termination_date":"2024-02-09","target_commissioning_date":"2029-03-30","target_commissioning_window_start_date":"2029-03-30","long_stop_date":"2032-03-30","initial_installed_capacity":"475.00","current_installed_capacity":"475.00","initial_strike_price":"37.35","current_strike_price":"45.37","latitude":"53.14750000","longitude":"2.88300000","coordinates":"N: 53.215, 2.995\nE: 53.215, 2.995\nS: 53.08, 2.771\nW: 53.08, 2.771","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":51,"contract_id":"AR4-SWF-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"STRANOCH WINDFARM LIMITED","counterparty_registration_no":"02825049","counterparty_address":"Alexander House 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland, DH4 5RA, United Kingdom","project_name":"Stranoch Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.635911Z","start_date":null,"expected_start_date":"2026-03-30","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-03-31","initial_installed_capacity":"99.96","current_installed_capacity":"99.96","initial_strike_price":"42.47","current_strike_price":"52.25","latitude":"55.01275000","longitude":"-4.87075000","coordinates":"N: 55.044, -4.841\nE: 55.031, -4.83\nS: 54.976, -4.895\nW: 55, -4.917","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":258,"contract_id":"AR4-RSP-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"RANKSBOROUGH SOLAR LIMITED","counterparty_registration_no":"11132027","counterparty_address":"4th Floor, 1 Tudor street, London, EC4Y 0AH, United Kingdom","project_name":"Ranksborough Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.644647Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"45.99","current_strike_price":"61.51","latitude":"52.68975000","longitude":"-0.77550000","coordinates":"N: 52.696, -0.78\nE: 52.688, -0.768\nS: 52.687, -0.768\nW: 52.688, -0.786","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":63,"contract_id":"AR4-BFL-910","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"BEAW FIELD SHETLAND LIMITED","counterparty_registration_no":"07551084","counterparty_address":"19th Floor, 22 Bishopsgate, London, EC2N 4BQ, United Kingdom","project_name":"Beaw Field","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:01.654530Z","start_date":null,"expected_start_date":"2026-11-30","termination_date":"2024-02-09","target_commissioning_date":"2026-11-30","target_commissioning_window_start_date":"2026-11-30","long_stop_date":"2028-11-30","initial_installed_capacity":"72.00","current_installed_capacity":"72.00","initial_strike_price":"46.39","current_strike_price":"57.52","latitude":"60.52100000","longitude":"-1.08725000","coordinates":"N: 60.537, -1.109\nE: 60.511, -1.027\nS: 60.501, -1.082\nW: 60.535, -1.131","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":50,"contract_id":"AR4-SSF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"STOKEFORD SOLAR LIMITED","counterparty_registration_no":"12040030","counterparty_address":"3rd Floor, St George's House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"Stokeford Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-14T01:00:01.785021Z","start_date":"2025-05-07","expected_start_date":"2025-04-24","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2026-04-01","initial_installed_capacity":"20.80","current_installed_capacity":"20.09","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"50.68725000","longitude":"-2.18425000","coordinates":"N: 50.691, -2.192\nE: 50.686, -2.174\nS: 50.683, -2.179\nW: 50.689, -2.192","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":107,"contract_id":"AR4-MFS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"BICKER FEN SOLAR LIMITED","counterparty_registration_no":"12620460","counterparty_address":"3rd Floor, St George's House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"Bicker Fen Solar Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-14T01:00:01.796031Z","start_date":"2025-05-07","expected_start_date":"2025-04-24","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2026-04-01","initial_installed_capacity":"18.80","current_installed_capacity":"18.164","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.14525000","longitude":"0.19175000","coordinates":"N: 53.149, 0.191\nE: 53.145, 0.196\nS: 53.139, 0.193\nW: 53.148, 0.187","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":355,"contract_id":"AR6-MAE-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EEB39 LIMITED","counterparty_registration_no":"12023103","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Maesmawr Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-28T01:00:02.594744Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-03-31","long_stop_date":"2027-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.56625000","longitude":"-3.29700000","coordinates":"N: 51.576, -3.296\nE: 51.565, -3.293\nS: 51.56, -3.294\nW: 51.564, -3.305","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":101,"contract_id":"AR2-IFI-410","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Legal & General Property Partners (Industrial Fund) Limited","counterparty_registration_no":"03431928","counterparty_address":"One Coleman Street, London, EC2R 5AA, United Kingdom","project_name":"IPIF Fort Industrial REC","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2025-09-11T01:00:01.714190Z","start_date":null,"expected_start_date":"2022-03-01","termination_date":"2021-09-09","target_commissioning_date":"2022-03-01","target_commissioning_window_start_date":"2021-12-01","long_stop_date":"2023-11-30","initial_installed_capacity":"10.20","current_installed_capacity":"10.20","initial_strike_price":"74.75","current_strike_price":"86.22","latitude":"52.51150000","longitude":"-1.80100000","coordinates":"N: 52.512, -1.8\nE: 52.511, -1.8\nS: 52.511, -1.802\nW: 52.512, -1.802","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":192,"contract_id":"AR2-STY-002","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"DC2 Engineering Limited","counterparty_registration_no":"08210771","counterparty_address":"Ty Brycheiniog, Heolgerrig, Merthyr Tydfil, CF48 1RE, United Kingdom","project_name":"Station Yard CFD 1","base_year":2012,"agreement_type":"Generic","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2025-09-11T01:00:01.722967Z","start_date":null,"expected_start_date":null,"termination_date":"2018-10-02","target_commissioning_date":"2021-04-01","target_commissioning_window_start_date":"2020-04-08","long_stop_date":"2022-04-07","initial_installed_capacity":"0.05","current_installed_capacity":"0.05","initial_strike_price":"74.75","current_strike_price":"82.58","latitude":"51.94075000","longitude":"-3.89100000","coordinates":"N: 51.942, -3.891\nE: 51.941, -3.89\nS: 51.94, -3.891\nW: 51.94, -3.892","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":true,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":127,"contract_id":"AR3-SHB-101","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Small Heath Bio Power Limited","counterparty_registration_no":"10307941","counterparty_address":"Blythe House, Blythe Park, Cresswell Lane, Cresswell, Stoke-On-Trent, ST11 9RD, United Kingdom","project_name":"Small Heath Bio Power Limited","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2025-09-11T01:00:01.752424Z","start_date":null,"expected_start_date":"2024-12-31","termination_date":"2021-04-13","target_commissioning_date":"2024-12-31","target_commissioning_window_start_date":"2024-12-31","long_stop_date":"2027-06-30","initial_installed_capacity":"6.10","current_installed_capacity":"6.10","initial_strike_price":"41.611","current_strike_price":"48.00","latitude":"52.46025000","longitude":"-1.84150000","coordinates":"N: 52.461, -1.842\nE: 52.461, -1.84\nS: 52.459, -1.842\nW: 52.46, -1.842","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":88,"contract_id":"AR2-GRN-401","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Grangemouth Renewable Energy Limited","counterparty_registration_no":"SC488309","counterparty_address":"15 Athol Crescent, Edinburgh, EH3 8HA, United Kingdom","project_name":"Grangemouth Renewable Energy Plant","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2025-09-11T01:00:01.833593Z","start_date":null,"expected_start_date":null,"termination_date":"2018-10-08","target_commissioning_date":"2021-07-01","target_commissioning_window_start_date":"2021-07-01","long_stop_date":"2023-06-30","initial_installed_capacity":"85.00","current_installed_capacity":"85.00","initial_strike_price":"74.75","current_strike_price":"82.58","latitude":"56.02375000","longitude":"-3.71325000","coordinates":"N: 56.027, -3.712\nE: 56.025, -3.7\nS: 56.021, -3.716\nW: 56.022, -3.725","technology_type":"Dedicated Biomass","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":true,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":224,"contract_id":"AR2-DRK-414","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Future Earth Energy (Drakelow) Limited","counterparty_registration_no":"09780052","counterparty_address":"2nd Floor, London, SW1P 1SB, United Kingdom","project_name":"Drakelow Renewable Energy Centre","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2025-09-11T01:00:01.844066Z","start_date":null,"expected_start_date":null,"termination_date":"2018-11-09","target_commissioning_date":"2021-04-01","target_commissioning_window_start_date":"2021-04-01","long_stop_date":"2023-03-31","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"74.75","current_strike_price":"82.58","latitude":"52.77500000","longitude":"-1.65675000","coordinates":"N: 52.776, -1.657\nE: 52.775, -1.655\nS: 52.774, -1.656\nW: 52.775, -1.659","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":12,"contract_id":"AR3-DP1-101","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Doggerbank Offshore Wind Farm Project 1 Projco Limited","counterparty_registration_no":"07791991","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Dogger Bank A P1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-10-22T01:00:01.717819Z","start_date":null,"expected_start_date":"2027-07-31","termination_date":null,"target_commissioning_date":"2023-09-01","target_commissioning_window_start_date":"2023-06-01","long_stop_date":"2027-07-31","initial_installed_capacity":"302.40","current_installed_capacity":"302.40","initial_strike_price":"39.65","current_strike_price":"55.01","latitude":"54.76775000","longitude":"1.73050000","coordinates":"N: 54.835, 1.668\nE: 54.783, 1.86\nS: 54.711, 1.761\nW: 54.742, 1.633","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":537,"contract_id":"AR7-MSP-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BEACHAMPTON SOLAR PROJECT LIMITED","counterparty_registration_no":"12349365","counterparty_address":"The Green, Easter Park Benyon Road, Silchester, Reading, RG7 2PQ, United Kingdom","project_name":"Manor Farm Solar Plant","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:02.342642Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.01900000","longitude":"-0.87900000","coordinates":"N: 52.023, -0.882\nE: 52.018, -0.871\nS: 52.016, -0.879\nW: 52.019, -0.884","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":222,"contract_id":"AR3-DP2-202","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Doggerbank Offshore Wind Farm Project 2 Projco Limited","counterparty_registration_no":"07914510","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Dogger Bank B P2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-07-01T01:00:06.967353Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2025-01-01","target_commissioning_window_start_date":"2024-08-01","long_stop_date":"2028-01-31","initial_installed_capacity":"441.00","current_installed_capacity":"441.00","initial_strike_price":"41.611","current_strike_price":"57.92","latitude":"55.02375000","longitude":"1.71575000","coordinates":"N: 55.102, 1.855\nE: 54.988, 1.858\nS: 54.985, 1.654\nW: 55.02, 1.496","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":294,"contract_id":"AR6-CBT-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"COUBAR SOLAR LIMITED","counterparty_registration_no":"12566686","counterparty_address":"35-41 Folgate Street, London, E1 6BX, United Kingdom","project_name":"CBT24","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-09-02T01:00:02.651885Z","start_date":null,"expected_start_date":"2026-11-01","termination_date":null,"target_commissioning_date":"2026-04-15","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2027-07-01","initial_installed_capacity":"12.80","current_installed_capacity":"12.80","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.50755000","longitude":"-3.55795000","coordinates":"N: 50.511, -3.5549\nE: 50.508, -3.5523\nS: 50.5048, -3.5623\nW: 50.5064, -3.5623","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":24,"contract_id":"AR4-FFN-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"BL SOLAR 10 (FERRY FARM) LIMITED","counterparty_registration_no":"13708358","counterparty_address":"Ham Farm Main Road, Bosham, Chichester, PO18 8EH, United Kingdom","project_name":"FERRY FARM 3 NORTH","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-10-08T01:00:02.783008Z","start_date":null,"expected_start_date":"2027-04-05","termination_date":null,"target_commissioning_date":"2026-04-30","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2028-04-30","initial_installed_capacity":"9.75","current_installed_capacity":"9.75","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"50.75425000","longitude":"-0.79050000","coordinates":"N: 50.759, -0.79\nE: 50.757, -0.788\nS: 50.744, -0.789\nW: 50.757, -0.795","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":332,"contract_id":"AR6-HPF-010","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"ORSTED HORNSEA PROJECT FOUR LIMITED","counterparty_registration_no":"08584182","counterparty_address":"5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Project Four Offshore Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2025-09-11T01:00:01.988324Z","start_date":null,"expected_start_date":"2030-01-01","termination_date":"2025-07-28","target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2032-03-31","initial_installed_capacity":"2400.00","current_installed_capacity":"2400.00","initial_strike_price":"58.87","current_strike_price":"84.97","latitude":"54.09050000","longitude":"1.26225000","coordinates":"N: 54.18, 1.26\nE: 54.07, 1.501\nS: 53.988, 1.289\nW: 54.124, 0.999","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":544,"contract_id":"AR7-TOE-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"TORMYWHEEL EXTENSION LIMITED","counterparty_registration_no":"SC558203","counterparty_address":"3rd Floor, Maxim 10, Parklands Avenue, Motherwell, ML1 4WQ, United Kingdom","project_name":"Tormywheel Extension","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:02.383177Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-30","initial_installed_capacity":"9.40","current_installed_capacity":"9.40","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"55.80125000","longitude":"-3.68050000","coordinates":"N: 55.804, -3.679\nE: 55.804, -3.677\nS: 55.795, -3.679\nW: 55.802, -3.687","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":626,"contract_id":"LCD-DPS-000","allocation_round":"Low Carbon Dispatchable","scheme":"LCD","counterparty_name":"Drax Power Ltd.","counterparty_registration_no":"4883589","counterparty_address":"Drax Power Station, Selby, North Yorkshire, Selby, YO8 8PH, United Kingdom","project_name":"Drax Power Station","base_year":2012,"agreement_type":"Low Carbon Dispatchable","contract_version":"Version 1","comment":"","updated_at":"2026-07-30T01:00:02.356453Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":null,"target_commissioning_window_start_date":null,"target_commissioning_window_end_date":null,"long_stop_date":null,"initial_installed_capacity":null,"current_installed_capacity":null,"initial_strike_price":"109.90","current_strike_price":null,"latitude":"53.73509800","longitude":"-0.99687305","coordinates":"N: 53.735566, -0.9979648\nE: 53.735222, -0.9955626\nS: 53.734657, -0.9957579\nW: 53.734947, -0.9982069","technology_type":"Biomass Conversion","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Licence Connected","facility_smlf":"0.00","facility_wmlf":"22.00","station_smlf":"11.00","station_wmlf":"33.00","summer_threshold_load_factor":"16.00","winter_threshold_load_factor":"38.00","expected_contract_capacity_mw":"2580.00","polymorphic_ctype":18,"total_permitted_reduction_mw":null},{"id":276,"contract_id":"AR6-AFS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EEB43 LIMITED","counterparty_registration_no":"12168651","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Aston Flamville Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-23T01:00:02.670191Z","start_date":null,"expected_start_date":"2027-06-30","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-03-31","long_stop_date":"2028-06-17","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.52625000","longitude":"-1.32725000","coordinates":"N: 52.534, -1.332\nE: 52.523, -1.32\nS: 52.52, -1.323\nW: 52.528, -1.334","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":91,"contract_id":"AR4-HRL-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"HARLESFORD SOLAR FARM LIMITED","counterparty_registration_no":"12374425","counterparty_address":"Oxygen House Grenadier Road, Exeter Business Park, Exeter, EX1 3LH, United Kingdom","project_name":"Harlesford","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"The Expected Start Date is under review by LCCC","updated_at":"2026-09-04T01:00:03.889509Z","start_date":null,"expected_start_date":"2026-06-30","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"26.65","current_installed_capacity":"26.65","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.70325000","longitude":"-1.01350000","coordinates":"N: 51.712, -1.018\nE: 51.7, -1.006\nS: 51.698, -1.008\nW: 51.703, -1.022","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":129,"contract_id":"AR3-SOW-102","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Sofia Offshore Wind Farm","counterparty_registration_no":"07791964","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Sofia Offshore Wind Farm Phase 2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-09-24T01:00:03.238924Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2025-08-06","target_commissioning_window_start_date":"2025-04-08","long_stop_date":"2029-04-12","initial_installed_capacity":"420.00","current_installed_capacity":"420.00","initial_strike_price":"39.65","current_strike_price":"55.01","latitude":"55.06450000","longitude":"2.21575000","coordinates":"N: 55.13, 2.218\nE: 55.058, 2.346\nS: 54.99, 2.229\nW: 55.08, 2.07","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":114,"contract_id":"AR4-MMG-500","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"MAGALLANES TIDAL ENERGY LTD","counterparty_registration_no":"SC661403","counterparty_address":"Unit 2, Warness Park Hatston Pier Road, Crowness Business Park, Kirkwall, KW15 1ZL, United Kingdom","project_name":"Morlais Magallanes GR3","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:05.147700Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2026-10-01","target_commissioning_window_start_date":"2025-11-01","long_stop_date":"2029-11-01","initial_installed_capacity":"5.62","current_installed_capacity":"5.62","initial_strike_price":"178.54","current_strike_price":"263.56","latitude":"53.29150000","longitude":"-4.72050000","coordinates":"N: 53.296, -4.71\nE: 53.287, -4.704\nS: 53.287, -4.734\nW: 53.296, -4.734","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":331,"contract_id":"AR6-HOC-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CHILTERN RENEWABLES HOCKLIFFE LIMITED","counterparty_registration_no":"13029659","counterparty_address":"3rd Floor, 86-90 Paul Street, London, EC2A 4NE, United Kingdom","project_name":"Hockliffe","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-28T01:00:02.774030Z","start_date":null,"expected_start_date":"2026-12-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2027-07-01","initial_installed_capacity":"21.00","current_installed_capacity":"20.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.93275000","longitude":"-0.61750000","coordinates":"N: 51.938, -0.622\nE: 51.929, -0.61\nS: 51.928, -0.612\nW: 51.936, -0.626","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"1.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":71,"contract_id":"AR5-CSP-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SEVERN TRENT GREEN POWER CHURCH FARM LIMITED","counterparty_registration_no":"13207815","counterparty_address":"The Stables, Radford, Chipping Norton, OX7 4EB, United Kingdom","project_name":"Church Farm Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2025-09-11T01:00:02.496080Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2025-03-26","target_commissioning_date":"2025-04-01","target_commissioning_window_start_date":"2025-04-01","long_stop_date":"2026-07-01","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"47.00","current_strike_price":"67.34","latitude":"52.70675000","longitude":"-2.62700000","coordinates":"N: 52.709, -2.627\nE: 52.707, -2.615\nS: 52.703, -2.631\nW: 52.708, -2.635","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":403,"contract_id":"LCH-CRO-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"Scottish Power Energy Retail Limited; and Storegga Hydrogen (Cromarty) Limited","counterparty_registration_no":"SC190287; and SC747385","counterparty_address":"320 St. Vincent Street, Glasgow, Scotland, G2 5AD; and Johnstone House 52-54 Rose Street, Aberdeen, United Kingdom, AB10 1HA","project_name":"Cromarty Green Hydrogen Project","base_year":2022,"agreement_type":"Green","contract_version":"Hydrogen Allocation Round 1; December 2024","comment":"This is a UJV contract signed between LCCC and both SCOTTISHPOWER ENERGY RETAIL LIMITED (SC190287); and STOREGGA HYDROGEN (CROMARTY) LIMITED (SC747385)","updated_at":"2026-07-28T01:00:02.361741Z","start_date":null,"expected_start_date":"2028-04-26","termination_date":null,"target_commissioning_date":"2028-12-26","target_commissioning_window_start_date":"2027-12-26","target_commissioning_window_end_date":"2028-12-26","long_stop_date":"2029-12-26","initial_installed_capacity":"10.60","current_installed_capacity":"10.60","initial_strike_price":"214.27","current_strike_price":"263.12","latitude":null,"longitude":null,"coordinates":"N: 57.80319, -4.2850835\nE: 57.801694, -4.2808151\nS: 57.800529, -4.2851677\nW: 57.801326, -4.2877763","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"1259199.00","current_sales_cap":"1259199.00","production_plant_coordinates":"N: 57.80244, -4.2833194\nE: 57.801383, -4.2821418\nS: 57.800529, -4.2851677\nW: 57.801599, -4.2865986","production_plant_longitude":"-4.28430688","production_plant_latitude":"57.80148775","cost_estimate_of_storage_of_hydrogen":null,"cost_estimate_of_transport_of_hydrogen":"24.37","polymorphic_ctype":7},{"id":247,"contract_id":"AR2-MRY-107","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Moray Offshore Windfarm (East) Limited","counterparty_registration_no":"07101438","counterparty_address":"Shepherd And Wedderburn Llp Octagon Point, 5 Cheapside, 5 Cheapside, London, EC2V 6AA, United Kingdom","project_name":"Moray Offshore Windfarm (East) Phase 1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2026-04-01T01:00:05.509352Z","start_date":"2024-03-04","expected_start_date":"2024-03-04","termination_date":null,"target_commissioning_date":"2022-04-01","target_commissioning_window_start_date":"2022-04-01","long_stop_date":"2025-03-31","initial_installed_capacity":"313.50","current_installed_capacity":"309.469","initial_strike_price":"57.50","current_strike_price":"82.34","latitude":"58.12475000","longitude":"-2.78350000","coordinates":"N: 58.232, -2.738\nE: 58.135, -2.57\nS: 58.066, -2.913\nW: 58.066, -2.913","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":186,"contract_id":"AR5-OME-504","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"ORBITAL PROJECTS 9 LIMITED","counterparty_registration_no":"SC765168","counterparty_address":"Innovation Centre - Orkney Hatston Pier Road, Crowness Business Park, Kirkwall, KW15 1ZL, United Kingdom","project_name":"Orbital Marine Eday 4","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-09-08T01:00:08.430359Z","start_date":null,"expected_start_date":"2028-11-15","termination_date":null,"target_commissioning_date":"2028-03-16","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-03-01","initial_installed_capacity":"4.80","current_installed_capacity":"4.80","initial_strike_price":"198.00","current_strike_price":"292.29","latitude":"59.14775000","longitude":"-2.81025000","coordinates":"N: 59.166, -2.81\nE: 59.139, -2.783\nS: 59.126, -2.801\nW: 59.16, -2.847","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":120,"contract_id":"AR5-ORM-504","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"ORBITAL PROJECTS 8 LIMITED","counterparty_registration_no":"SC758461","counterparty_address":"Innovation Centre - Orkney Hatston Pier Road, Crowness Business Park, Kirkwall, KW15 1ZL, United Kingdom","project_name":"Orbital Marine Eday 3","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-09-08T01:00:08.456128Z","start_date":null,"expected_start_date":"2028-07-19","termination_date":null,"target_commissioning_date":"2028-03-16","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-03-01","initial_installed_capacity":"2.40","current_installed_capacity":"2.40","initial_strike_price":"198.00","current_strike_price":"292.29","latitude":"59.14775000","longitude":"-2.81025000","coordinates":"N: 59.166, -2.81\nE: 59.139, -2.783\nS: 59.126, -2.801\nW: 59.16, -2.847","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":406,"contract_id":"LCH-BLC-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"BRADFORD LOW CARBON HYDROGEN LIMITED","counterparty_registration_no":"14315106","counterparty_address":"North Bailey House, 12 New Inn Hall Street, Oxford, OX1 2RP, United Kingdom","project_name":"BRADFORD LOW CARBON HYDROGEN PROJECT","base_year":2022,"agreement_type":"Green","contract_version":"Version: Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-09-19T01:00:02.263723Z","start_date":null,"expected_start_date":"2028-12-31","termination_date":null,"target_commissioning_date":"2026-12-31","target_commissioning_window_start_date":"2026-12-31","target_commissioning_window_end_date":"2027-12-31","long_stop_date":"2028-12-31","initial_installed_capacity":"24.49","current_installed_capacity":"24.49","initial_strike_price":"176.03","current_strike_price":"216.16","latitude":null,"longitude":null,"coordinates":"N: 53.790014, -1.7214451\nE: 53.789069, -1.7209504\nS: 53.788649, -1.7219702\nW: 53.789608, -1.7244835","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"2483662.00","current_sales_cap":"2483662.00","production_plant_coordinates":"N: 53.789872, -1.722296\nE: 53.789422, -1.7221776\nS: 53.7892, -1.7232567\nW: 53.789776, -1.7234047","production_plant_longitude":"-1.72278375","production_plant_latitude":"53.78956750","cost_estimate_of_storage_of_hydrogen":"4.01","cost_estimate_of_transport_of_hydrogen":"11.58","polymorphic_ctype":7},{"id":563,"contract_id":"AR7-WAS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GSI WASHDYKE LIMITED","counterparty_registration_no":"14398779","counterparty_address":"5th Floor, Exchange Station, Tithebarn Street, Liverpool, L2 2QP, United Kingdom","project_name":"Washdyke Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:02.493747Z","start_date":null,"expected_start_date":"2028-06-01","termination_date":null,"target_commissioning_date":"2028-06-01","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-02-28","initial_installed_capacity":"24.75","current_installed_capacity":"24.75","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.89650000","longitude":"-0.37925000","coordinates":"N: 52.899, -0.379\nE: 52.898, -0.375\nS: 52.893, -0.379\nW: 52.896, -0.384","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":566,"contract_id":"AR7-LIM-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GRUPOTEC SOLAR UK 1 LTD","counterparty_registration_no":"13503971","counterparty_address":"5 Kew Road, Richmond, TW9 2PR, United Kingdom","project_name":"Limebury","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:02.519953Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2028-12-31","initial_installed_capacity":"5.20","current_installed_capacity":"5.20","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.97500000","longitude":"-4.33025000","coordinates":"N: 50.977, -4.331\nE: 50.974, -4.327\nS: 50.973, -4.329\nW: 50.976, -4.334","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":570,"contract_id":"AR7-EHI-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"ENERGYFARM HYNDBURN II LTD","counterparty_registration_no":"15558707","counterparty_address":"4330 Park Approach, Thorpe Park, Leeds, LS15 8GB, United Kingdom","project_name":"ENERGYFARM HYNDBURN II LTD","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:02.535960Z","start_date":null,"expected_start_date":"2027-10-31","termination_date":null,"target_commissioning_date":"2027-10-31","target_commissioning_window_start_date":"2027-10-31","long_stop_date":"2029-10-30","initial_installed_capacity":"8.20","current_installed_capacity":"8.20","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"53.71975000","longitude":"-2.38875000","coordinates":"N: 53.725, -2.384\nE: 53.715, -2.366\nS: 53.72, -2.399\nW: 53.719, -2.406","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_G","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":284,"contract_id":"AR6-BIL-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"GREENTECH INVEST UK (3) LIMITED","counterparty_registration_no":"12972363","counterparty_address":"Challenge House, Sherwood Drive, Bletchley, Milton Keynes, MK3 6DP, United Kingdom","project_name":"Billsbrae","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"LCCC Contract Management has estimated the expected start date for this project.","updated_at":"2026-06-16T01:00:01.890181Z","start_date":null,"expected_start_date":"2027-12-20","termination_date":null,"target_commissioning_date":"2026-06-30","target_commissioning_window_start_date":"2026-06-01","long_stop_date":"2029-01-01","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"56.06950000","longitude":"-3.33125000","coordinates":"N: 56.072, -3.33\nE: 56.071, -3.327\nS: 56.065, -3.33\nW: 56.07, -3.338","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":411,"contract_id":"LCH-TEG-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"TEES GREEN HYDROGEN LIMITED","counterparty_registration_no":"14323472","counterparty_address":"2nd Floor, 123 Victoria Street, London, SW1E 6DE, United Kingdom","project_name":"TEES GREEN HYDROGEN PROJECT","base_year":2022,"agreement_type":"Green","contract_version":"Version: Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-07-16T01:00:03.116355Z","start_date":null,"expected_start_date":"2029-08-31","termination_date":null,"target_commissioning_date":"2026-12-31","target_commissioning_window_start_date":"2026-12-31","target_commissioning_window_end_date":"2027-12-31","long_stop_date":"2029-12-31","initial_installed_capacity":"5.51","current_installed_capacity":"5.51","initial_strike_price":"241.93","current_strike_price":"297.09","latitude":null,"longitude":null,"coordinates":"N: 54.58123, -1.1130213\nE: 54.578983, -1.1109845\nS: 54.57736, -1.1173156\nW: 54.579283, -1.1231018","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"625584.00","current_sales_cap":"625584.00","production_plant_coordinates":"N: 54.58123, -1.1130213\nE: 54.579911, -1.1116896\nS: 54.578289, -1.1180208\nW: 54.579283, -1.1231018","production_plant_longitude":"-1.11645838","production_plant_latitude":"54.57967825","cost_estimate_of_storage_of_hydrogen":"0.44","cost_estimate_of_transport_of_hydrogen":"4.94","polymorphic_ctype":7},{"id":409,"contract_id":"LCH-BGH-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"BARROW GREEN HYDROGEN LIMITED","counterparty_registration_no":"13625005","counterparty_address":"26, Ellerbeck Court, Stokesley, Middlesbrough, TS9 5PT, United Kingdom","project_name":"BARROW GREEN HYDROGEN PROJECT","base_year":2022,"agreement_type":"Green","contract_version":"Version: Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-09-19T01:00:03.562093Z","start_date":null,"expected_start_date":"2027-11-30","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","target_commissioning_window_end_date":"2028-03-31","long_stop_date":"2029-03-31","initial_installed_capacity":"21.02","current_installed_capacity":"21.02","initial_strike_price":"205.48","current_strike_price":"252.33","latitude":null,"longitude":null,"coordinates":"N: 54.138894, -3.2361986\nE: 54.138752, -3.2351841\nS: 54.137461, -3.235712\nW: 54.137612, -3.2367421","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"1510900.00","current_sales_cap":"1510900.00","production_plant_coordinates":"N: 54.138749, -3.2362708\nE: 54.138598, -3.2352407\nS: 54.137732, -3.2355976\nW: 54.137874, -3.2366274","production_plant_longitude":"-3.23593412","production_plant_latitude":"54.13823825","cost_estimate_of_storage_of_hydrogen":"6.42","cost_estimate_of_transport_of_hydrogen":"2.05","polymorphic_ctype":7},{"id":410,"contract_id":"LCH-TGH-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"TRAFFORD GREEN HYDROGEN LIMITED","counterparty_registration_no":"13351618","counterparty_address":"26, Ellerbeck Court, Stokesley, Middlesbrough, TS9 5PT, United Kingdom","project_name":"TRAFFORD GREEN HYDROGEN PROJECT","base_year":2022,"agreement_type":"Green","contract_version":"Version: Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-09-19T01:00:03.573693Z","start_date":null,"expected_start_date":"2027-12-31","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","target_commissioning_window_end_date":"2028-03-31","long_stop_date":"2029-03-31","initial_installed_capacity":"10.52","current_installed_capacity":"10.52","initial_strike_price":"232.82","current_strike_price":"285.90","latitude":null,"longitude":null,"coordinates":"N: 53.435086, -2.4116681\nE: 53.43472, -2.4108217\nS: 53.433511, -2.4123001\nW: 53.433885, -2.4131467","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"900886.00","current_sales_cap":"900886.00","production_plant_coordinates":"N: 53.434464, -2.4121739\nE: 53.434223, -2.4116448\nS: 53.433826, -2.4121376\nW: 53.434058, -2.4126667","production_plant_longitude":"-2.41215575","production_plant_latitude":"53.43414275","cost_estimate_of_storage_of_hydrogen":"7.26","cost_estimate_of_transport_of_hydrogen":"32.00","polymorphic_ctype":7},{"id":20,"contract_id":"AR5-EUH-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"HARE CRAIG WINDFARM LLP","counterparty_registration_no":"OC429444","counterparty_address":"Compton House 2300 The Crescent, Birmingham Business Park, Birmingham, B37 7YE, United Kingdom","project_name":"Energyfarm UK Hare Craig LLP","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-28T01:00:05.441725Z","start_date":null,"expected_start_date":"2027-10-31","termination_date":null,"target_commissioning_date":"2028-10-31","target_commissioning_window_start_date":"2028-10-31","long_stop_date":"2030-10-31","initial_installed_capacity":"46.20","current_installed_capacity":"46.20","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"55.54625000","longitude":"-4.01100000","coordinates":"N: 55.568, -4.006\nE: 55.553, -3.992\nS: 55.532, -4.023\nW: 55.532, -4.023","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":395,"contract_id":"AR6-WSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"WHINFIELD HIGH GRANGE SOLAR FARM LIMITED","counterparty_registration_no":"12678973","counterparty_address":"80 Strand, London, WC2R0DT, United Kingdom","project_name":"Whinfield Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-29T01:00:03.204581Z","start_date":null,"expected_start_date":"2026-12-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-02-01","long_stop_date":"2027-05-01","initial_installed_capacity":"22.80","current_installed_capacity":"22.80","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"54.59650000","longitude":"-1.53075000","coordinates":"N: 54.6, -1.529\nE: 54.597, -1.522\nS: 54.592, -1.535\nW: 54.597, -1.537","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":559,"contract_id":"AR7-HMS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LIGHTSOURCE SPV 189 LIMITED","counterparty_registration_no":"8938754","counterparty_address":"7th Floor 33 Holborn, London, EC1N 2HU, United Kingdom","project_name":"Hett Moor Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:02.598293Z","start_date":null,"expected_start_date":"2028-11-01","termination_date":null,"target_commissioning_date":"2028-11-01","target_commissioning_window_start_date":"2028-11-01","long_stop_date":"2030-10-31","initial_installed_capacity":"44.40","current_installed_capacity":"44.40","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"54.71150000","longitude":"-1.55275000","coordinates":"N: 54.719, -1.55\nE: 54.712, -1.536\nS: 54.706, -1.562\nW: 54.709, -1.563","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":627,"contract_id":"LCD-LPS-000","allocation_round":"Low Carbon Dispatchable","scheme":"LCD","counterparty_name":"TTEP Lynemouth Power Ltd.","counterparty_registration_no":"7866585","counterparty_address":"Lynemouth Power Station, Ashington, Northumberland, NE63 9NW, United Kingdom","project_name":"Lynemouth Power Station","base_year":2012,"agreement_type":"Low Carbon Dispatchable","contract_version":"Version 2","comment":"","updated_at":"2026-09-23T01:00:09.127333Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":null,"target_commissioning_window_start_date":null,"target_commissioning_window_end_date":null,"long_stop_date":null,"initial_installed_capacity":null,"current_installed_capacity":null,"initial_strike_price":"110.46","current_strike_price":null,"latitude":"55.20469875","longitude":"-1.52162450","coordinates":"N: 55.205075, -1.520854\nE: 55.204818, -1.520663\nS: 55.204325, -1.52238\nW: 55.204577, -1.522601","technology_type":"Biomass Conversion","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","facility_smlf":"0.00","facility_wmlf":"30.00","station_smlf":"0.00","station_wmlf":"38.00","summer_threshold_load_factor":"8.00","winter_threshold_load_factor":"46.00","expected_contract_capacity_mw":"384.00","polymorphic_ctype":18,"total_permitted_reduction_mw":null},{"id":215,"contract_id":"AAA-LIG-176","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"GSII Chafarm CFD Limited","counterparty_registration_no":"08769576","counterparty_address":"27 Old Gloucester Street, London, WC1N 3AX, United Kingdom","project_name":"Charity Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:02.377857Z","start_date":"2016-06-30","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2016-06-30","target_commissioning_window_start_date":"2016-04-01","long_stop_date":"2017-06-30","initial_installed_capacity":"14.67","current_installed_capacity":"11.94","initial_strike_price":"79.23","current_strike_price":"116.96","latitude":"52.82175000","longitude":"-2.81025000","coordinates":"N: 52.825, -2.81\nE: 52.821, -2.806\nS: 52.819, -2.811\nW: 52.822, -2.814","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"2.73","capacity_whole_station":null,"polymorphic_ctype":6},{"id":2,"contract_id":"AR5-ASH-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 24 LIMITED","counterparty_registration_no":"12433921","counterparty_address":"First Floor Winston House, 349 Regents Park Road, London, N3 1DH, United Kingdom","project_name":"Ashorne","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.406381Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.23875000","longitude":"-1.51825000","coordinates":"N: 52.253, -1.519\nE: 52.239, -1.499\nS: 52.228, -1.52\nW: 52.235, -1.535","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":108,"contract_id":"AR5-MCG-710","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"MELKSHAM CALNE GREEN LIMITED","counterparty_registration_no":"12517251","counterparty_address":"17th Floor Hylo, 103-105 Bunhill Row, London, EC1Y8LZ, United Kingdom","project_name":"Melksham Calne Green","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.448914Z","start_date":null,"expected_start_date":"2027-10-01","termination_date":null,"target_commissioning_date":"2026-08-15","target_commissioning_window_start_date":"2026-07-01","long_stop_date":"2027-10-01","initial_installed_capacity":"19.60","current_installed_capacity":"18.30","initial_strike_price":"47.00","current_strike_price":"69.86","latitude":"51.38450000","longitude":"-2.18975000","coordinates":"N: 51.388, -2.192\nE: 51.384, -2.181\nS: 51.381, -2.19\nW: 51.385, -2.196","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"1.30","capacity_whole_station":null,"polymorphic_ctype":6},{"id":66,"contract_id":"AR5-BLW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BLARGHOUR WIND FARM LIMITED","counterparty_registration_no":"09171723","counterparty_address":"22-24 King Street, Maidenhead, SL6 1EF, United Kingdom","project_name":"Blarghour Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.484414Z","start_date":null,"expected_start_date":"2028-09-30","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-15","long_stop_date":"2030-10-15","initial_installed_capacity":"67.20","current_installed_capacity":"67.20","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"56.27875000","longitude":"-5.16675000","coordinates":"N: 56.299, -5.159\nE: 56.286, -5.145\nS: 56.256, -5.156\nW: 56.274, -5.207","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":412,"contract_id":"RSA-NEP-2T1","allocation_round":"Track-1","scheme":"RSA","counterparty_name":"Net Zero North Sea Storage Limited","counterparty_registration_no":"12473084","counterparty_address":"Chertsey Road, Sunbury On Thames, TW16 7BP, United Kingdom","project_name":"Northern Endurance Partnership","base_year":2024,"agreement_type":"Transport and Storage","contract_version":"Version 1, 4 November 2024","comment":"","updated_at":"2025-08-23T01:00:04.348305Z","start_date":null,"expected_start_date":"2029-02-19","termination_date":null,"target_commissioning_date":null,"target_commissioning_window_start_date":null,"target_commissioning_window_end_date":null,"long_stop_date":null,"initial_installed_capacity":null,"current_installed_capacity":null,"initial_strike_price":"0.00","current_strike_price":null,"latitude":null,"longitude":null,"coordinates":"","payment_date":null,"proposed_start_date_comments":"","termination_date_comments":"","polymorphic_ctype":15},{"id":413,"contract_id":"RSA-HNW-1T1","allocation_round":"Track-1","scheme":"RSA","counterparty_name":"Liverpool Bay CCS Limited","counterparty_registration_no":"13194018","counterparty_address":"ENI House, 10 Ebury Bridge Road, London, SW1W 8PZ, United Kingdom","project_name":"HyNet North West","base_year":2024,"agreement_type":"Transport and Storage","contract_version":"Version 1, 27 February 2025","comment":"","updated_at":"2025-08-27T01:00:02.534499Z","start_date":null,"expected_start_date":"2029-01-23","termination_date":null,"target_commissioning_date":null,"target_commissioning_window_start_date":null,"target_commissioning_window_end_date":null,"long_stop_date":null,"initial_installed_capacity":null,"current_installed_capacity":null,"initial_strike_price":"0.00","current_strike_price":null,"latitude":null,"longitude":null,"coordinates":"","payment_date":null,"proposed_start_date_comments":"","termination_date_comments":"","polymorphic_ctype":15},{"id":595,"contract_id":"AR7-CES-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EEB71 LIMITED","counterparty_registration_no":"13463825","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Chillington Estate","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:02.782162Z","start_date":null,"expected_start_date":"2029-01-01","termination_date":null,"target_commissioning_date":"2029-01-01","target_commissioning_window_start_date":"2029-01-01","long_stop_date":"2030-12-31","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.64800000","longitude":"-2.19200000","coordinates":"N: 52.653, -2.192\nE: 52.647, -2.183\nS: 52.644, -2.194\nW: 52.648, -2.199","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":318,"contract_id":"AR6-FAM-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"LOW CARBON SOLAR PARK 25 LIMITED","counterparty_registration_no":"13827865","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Fambridge","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.321511Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"39.52","current_installed_capacity":"39.52","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.62050000","longitude":"0.70300000","coordinates":"N: 51.629, 0.705\nE: 51.616, 0.712\nS: 51.616, 0.707\nW: 51.621, 0.688","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":286,"contract_id":"AR6-BRS-710","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BRAMLEY SOLAR LIMITED","counterparty_registration_no":"12723612","counterparty_address":"17th Floor Hylo, 103-105 Bunhill Row, London, EC1Y 8LZ, United Kingdom","project_name":"Bramley Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.419564Z","start_date":null,"expected_start_date":"2027-08-15","termination_date":null,"target_commissioning_date":"2027-08-15","target_commissioning_window_start_date":"2027-07-01","long_stop_date":"2028-10-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"74.43","latitude":"51.35200000","longitude":"-1.07300000","coordinates":"N: 51.344, -1.077\nE: 51.377, -1.062\nS: 51.344, -1.069\nW: 51.343, -1.084","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":321,"contract_id":"AR6-GSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"KYBO SOLAR FARM LIMITED","counterparty_registration_no":"SC705591","counterparty_address":"C/O Aukera Uk Limited, 7- 9 North St. David Street, Edinburgh, EH2 1AW, United Kingdom","project_name":"Gaywood Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.434983Z","start_date":null,"expected_start_date":"2027-02-14","termination_date":null,"target_commissioning_date":"2027-02-14","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2028-04-01","initial_installed_capacity":"10.50","current_installed_capacity":"10.50","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.21325000","longitude":"0.03750000","coordinates":"N: 51.217, 0.036\nE: 51.211, 0.04\nS: 51.211, 0.04\nW: 51.214, 0.034","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":353,"contract_id":"AR6-LWF-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK ONSHORE WIND LIMITED","counterparty_registration_no":"03758407","counterparty_address":"Greenwood House Westwood Way, Westwood Business Park, Coventry, CV4 8PB, United Kingdom","project_name":"Lorg Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.508532Z","start_date":null,"expected_start_date":"2029-01-17","termination_date":null,"target_commissioning_date":"2027-11-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2030-03-09","initial_installed_capacity":"44.00","current_installed_capacity":"44.00","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"55.27925000","longitude":"-4.07700000","coordinates":"N: 55.289, -4.07\nE: 55.279, -4.064\nS: 55.271, -4.086\nW: 55.278, -4.088","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":282,"contract_id":"AR6-BER-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"LONGLANDS SOLAR FARM LIMITED","counterparty_registration_no":"13353029","counterparty_address":"19th Floor 10 Upper Bank Street, London, E14 5BF, United Kingdom","project_name":"Berkeley","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.522730Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"34.58","current_installed_capacity":"34.58","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.66925000","longitude":"-2.52075000","coordinates":"N: 51.674, -2.528\nE: 51.668, -2.51\nS: 51.665, -2.512\nW: 51.67, -2.533","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":301,"contract_id":"AR6-COS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"COLDHARBOUR FARM SOLAR PARK LIMITED","counterparty_registration_no":"09458354","counterparty_address":"35 And 35a The Maltings Lower Charlton Trading Estate, Shepton Mallet, BA4 5QE, United Kingdom","project_name":"Coldharbour Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.538382Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"46.00","current_installed_capacity":"46.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.89825750","longitude":"-3.99167500","coordinates":"N: 50.90358, -3.98958\nE: 50.89458, -3.98989\nS: 50.89562, -3.98625\nW: 50.89925, -4.00098","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":291,"contract_id":"AR6-CAW-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CAMILTY WINDFARM PARTNERSHIP LLP","counterparty_registration_no":"OC361412","counterparty_address":"1st Floor, Sackville House, 143-149 Fenchurch Street, London, EC3M 6BL, United Kingdom","project_name":"Camilty Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.561544Z","start_date":null,"expected_start_date":"2027-01-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2029-01-01","initial_installed_capacity":"21.60","current_installed_capacity":"21.60","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"55.81825000","longitude":"-3.50900000","coordinates":"N: 55.827, -3.509\nE: 55.818, -3.494\nS: 55.809, -3.511\nW: 55.819, -3.522","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":328,"contract_id":"AR6-HWZ-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"HEATHLAND WINDFARM PARTNERSHIP LLP","counterparty_registration_no":"OC353593","counterparty_address":"Alexander House 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland, DH4 5RA, United Kingdom","project_name":"Heathland Wind Farm - Zone 2","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.574592Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"40.10","current_installed_capacity":"40.10","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"55.79625000","longitude":"-3.64925000","coordinates":"N: 55.813, -3.638\nE: 55.802, -3.617\nS: 55.781, -3.663\nW: 55.789, -3.679","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":289,"contract_id":"AR6-BTS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"Burton Top Solar Limited","counterparty_registration_no":"13271385","counterparty_address":"14b, Tower 42, 14b, Tower 42, 25 Old Broad Street, London, EC2N 1HN, United Kingdom","project_name":"Burton Top Farm, Station Lane","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-30T01:00:03.281800Z","start_date":null,"expected_start_date":"2027-12-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2028-12-31","initial_installed_capacity":"8.00","current_installed_capacity":"8.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"54.07300000","longitude":"-1.52650000","coordinates":"N: 54.076, -1.532\nE: 54.076, -1.521\nS: 54.07, -1.521\nW: 54.07, -1.532","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":123,"contract_id":"AR5-PRS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"PRESTON FARM SOLAR PARK LIMITED","counterparty_registration_no":"12543533","counterparty_address":"35 And 35a The Maltings, Lower Charlton Trading Estate, Shepton Mallet, BA4 5QE, United Kingdom","project_name":"Preston Farm Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-07-25T01:00:02.791890Z","start_date":"2026-07-24","expected_start_date":"2026-08-01","termination_date":null,"target_commissioning_date":"2025-04-01","target_commissioning_window_start_date":"2025-04-01","long_stop_date":"2027-03-19","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.17850000","longitude":"-1.15900000","coordinates":"N: 51.182, -1.159\nE: 51.178, -1.153\nS: 51.176, -1.16\nW: 51.178, -1.164","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":62,"contract_id":"AR5-BAS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BARNSDALE SOLAR PARK LIMITED","counterparty_registration_no":"12770635","counterparty_address":"Inkerman House St. Johns Road, Meadowfield, Durham, DH7 8XL, United Kingdom","project_name":"Barnsdale Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"Expected Start Date has been updated in line with the Generator's email.","updated_at":"2026-09-30T01:00:03.506348Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2026-01-01","target_commissioning_window_start_date":"2026-01-01","long_stop_date":"2027-04-01","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"53.75425000","longitude":"-1.36175000","coordinates":"N: 53.762, -1.367\nE: 53.751, -1.354\nS: 53.749, -1.356\nW: 53.755, -1.37","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":386,"contract_id":"AR6-STS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"FP LUX REIO PV STEERAWAY LIMITED","counterparty_registration_no":"13146470","counterparty_address":"Unit 15-16 Diddenham Court, Lambwood Hill, Grazeley, Reading, Berkshire, England, RG7 1JQ, United Kingdom","project_name":"Steeraway Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-21T01:00:02.253282Z","start_date":null,"expected_start_date":"2026-12-22","termination_date":"2026-04-23","target_commissioning_date":"2026-10-01","target_commissioning_window_start_date":"2026-10-01","long_stop_date":"2028-01-01","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.68800000","longitude":"-2.51050000","coordinates":"N: 52.691, -2.516\nE: 52.688, -2.499\nS: 52.683, -2.51\nW: 52.69, -2.517","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":31,"contract_id":"AR5-LAN-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 2 LTD","counterparty_registration_no":"11761556","counterparty_address":"First Floor Winston House, 349 Regents Park Road, London, N3 1DH, United Kingdom","project_name":"Langford","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.510788Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"35.71","current_installed_capacity":"35.71","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"50.82075000","longitude":"-3.36925000","coordinates":"N: 50.828, -3.374\nE: 50.816, -3.359\nS: 50.816, -3.362\nW: 50.823, -3.382","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":37,"contract_id":"AR5-MLS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 7 LTD","counterparty_registration_no":"11761895","counterparty_address":"First Floor Winston House, 349 Regents Park Road, London, N3 1DH, United Kingdom","project_name":"Moreton Lane Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.536530Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.00","current_installed_capacity":"49.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.78700000","longitude":"-2.32500000","coordinates":"N: 51.799, -2.314\nE: 51.796, -2.302\nS: 51.774, -2.338\nW: 51.779, -2.346","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":53,"contract_id":"AAA-PNE-187","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Tralorg Wind Farm Limited","counterparty_registration_no":"09916617","counterparty_address":"7th Floor Exchange House, 12 Exchange Square, London, EC2A 2NY, United Kingdom","project_name":"Tralorg Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:02.588980Z","start_date":"2020-11-13","expected_start_date":"2020-10-13","termination_date":null,"target_commissioning_date":"2018-06-30","target_commissioning_window_start_date":"2018-06-30","long_stop_date":"2021-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"18.684","initial_strike_price":"82.50","current_strike_price":"120.28","latitude":"55.23900000","longitude":"-4.80125000","coordinates":"N: 55.254, -4.801\nE: 55.236, -4.786\nS: 55.232, -4.804\nW: 55.234, -4.814","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"1.20","capacity_whole_station":null,"polymorphic_ctype":6},{"id":152,"contract_id":"AAA-COI-196","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Coire Na Cloiche Windfarm LLP","counterparty_registration_no":"SO304435","counterparty_address":"c/o Gillespire MacAndrew, 5 Atholl Crecent, Edinburgh, EH3 8EJ, United Kingdom","project_name":"Coire Na Cloiche Windfarm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:02.608201Z","start_date":"2019-06-25","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-10-31","target_commissioning_window_start_date":"2018-07-01","long_stop_date":"2020-06-30","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"82.50","current_strike_price":"121.79","latitude":"57.79100000","longitude":"-4.37750000","coordinates":"N: 57.796, -4.374\nE: 57.792, -4.365\nS: 57.784, -4.381\nW: 57.792, -4.39","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":23,"contract_id":"AR5-FEW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"ENERGYFARM UK FELL LLP","counterparty_registration_no":"OC429449","counterparty_address":"4330 Park Approach, Leeds, LS15 8GB, United Kingdom","project_name":"Fell Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-25T01:00:02.609173Z","start_date":null,"expected_start_date":"2029-10-31","termination_date":null,"target_commissioning_date":"2030-10-31","target_commissioning_window_start_date":"2029-10-31","long_stop_date":"2031-10-31","initial_installed_capacity":"50.00","current_installed_capacity":"50.00","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"55.13100000","longitude":"-3.99100000","coordinates":"N: 55.157, -4.001\nE: 55.134, -3.961\nS: 55.116, -4.001\nW: 55.117, -4.001","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":518,"contract_id":"AR7-COV-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"COVEN SOLAR LIMITED","counterparty_registration_no":"15791307","counterparty_address":"Unit 8-9 Easter Park Benyon Road, Silchester, Reading, RG7 2PQ, United Kingdom","project_name":"Coven Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:02.816691Z","start_date":null,"expected_start_date":"2027-05-01","termination_date":null,"target_commissioning_date":"2027-05-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"39.59","current_installed_capacity":"39.59","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.64800000","longitude":"-2.13950000","coordinates":"N: 52.656, -2.141\nE: 52.649, -2.132\nS: 52.642, -2.139\nW: 52.645, -2.146","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":374,"contract_id":"AR6-PSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"PRESTON FARM SOLAR LIMITED","counterparty_registration_no":"13475041","counterparty_address":"6th Floor, Capital Tower, 91 Waterloo Road, London, SE1 8RT, United Kingdom","project_name":"Preston Farm Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.643127Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.03450000","longitude":"-3.23225000","coordinates":"N: 51.039, -3.233\nE: 51.037, -3.228\nS: 51.028, -3.229\nW: 51.034, -3.239","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":356,"contract_id":"AR6-MEM-500","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"MAGALLANES TIDAL ENERGY LTD","counterparty_registration_no":"SC661403","counterparty_address":"Unit 2, Warness Park Hatston Pier Road, Crowness Business Park, Kirkwall, KW15 1ZL, United Kingdom","project_name":"Magallanes EMEC Berth 1 Extension","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.654840Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2028-08-31","long_stop_date":"2030-08-31","initial_installed_capacity":"3.00","current_installed_capacity":"3.00","initial_strike_price":"172.00","current_strike_price":"253.90","latitude":"59.14100000","longitude":"-2.81800000","coordinates":"N: 59.144, -2.818\nE: 59.141, -2.807\nS: 59.138, -2.821\nW: 59.141, -2.826","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":384,"contract_id":"AR6-SOS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"South Park Farm Energy Centre Limited","counterparty_registration_no":"12988212","counterparty_address":"Millhouse 32-38 East street, Rochford, Essex, SS4 1DB, United Kingdom","project_name":"South Park Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.666705Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-02-01","long_stop_date":"2029-05-01","initial_installed_capacity":"14.93","current_installed_capacity":"14.93","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.24225000","longitude":"-1.60025000","coordinates":"N: 51.245, -1.605\nE: 51.243, -1.591\nS: 51.239, -1.598\nW: 51.242, -1.607","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":382,"contract_id":"AR6-SHS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"NEXTPOWER SHERATON LIMITED","counterparty_registration_no":"08945292","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"Sheraton Hall Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.779441Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"54.69850000","longitude":"-1.33525000","coordinates":"N: 54.708, -1.327\nE: 54.693, -1.352\nS: 54.691, -1.345\nW: 54.702, -1.317","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":371,"contract_id":"AR6-PYM-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"PANT Y MAEN WIND LIMITED","counterparty_registration_no":"08819712","counterparty_address":"1 Des Roches Square, Great Britain, Witney, OX28 4BE, United Kingdom","project_name":"Pant y Maen Wind Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-12T01:00:03.386127Z","start_date":null,"expected_start_date":"2027-10-03","termination_date":"2026-05-11","target_commissioning_date":"2027-10-03","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-04-01","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"53.11625000","longitude":"-3.54525000","coordinates":"N: 53.124, -3.546\nE: 53.119, -3.527\nS: 53.107, -3.55\nW: 53.115, -3.558","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":575,"contract_id":"AR7-OVS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"OUSE VALLEY SOLAR FARM CIC","counterparty_registration_no":"13663999","counterparty_address":"2 Station Street, Lewes, BN7 2DA, United Kingdom","project_name":"OUSE VALLEY SOLAR FARM CIC","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-25T01:00:03.338475Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2027-06-30","target_commissioning_window_start_date":"2027-06-30","long_stop_date":"2029-06-29","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.89975000","longitude":"0.05725000","coordinates":"N: 50.906, 0.061\nE: 50.904, 0.062\nS: 50.889, 0.055\nW: 50.9, 0.051","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":86,"contract_id":"AR5-EGR-710","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"ENSO GREEN HOLDINGS A LIMITED","counterparty_registration_no":"12759332","counterparty_address":"17th Floor HYLO, 103-105 Bunhill Row, London, EC1Y 8LZ, United Kingdom","project_name":"Enso Green Holdings A Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.675603Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"47.00","current_strike_price":"69.86","latitude":"53.38125000","longitude":"-0.83100000","coordinates":"N: 53.392, -0.834\nE: 53.377, -0.82\nS: 53.375, -0.827\nW: 53.381, -0.843","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":124,"contract_id":"AR5-PSF-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SPRING DEV 08 LIMITED","counterparty_registration_no":"12515754","counterparty_address":"Leytonstone House, 3 Hanbury Drive, London, E11 1GA, United Kingdom","project_name":"Purton solar farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.697233Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"15.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.60000000","longitude":"-1.88100000","coordinates":"N: 51.603, -1.885\nE: 51.598, -1.876\nS: 51.597, -1.876\nW: 51.602, -1.887","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"5.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":111,"contract_id":"AAA-BAN-192","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Banks Renewables (Middle Muir Wind Farm) Limited","counterparty_registration_no":"07376956","counterparty_address":"Inkerman House, St Johns Road, Meadowfield, Durham, DH7 8XL, United Kingdom","project_name":"Middle Muir Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:02.720095Z","start_date":"2019-01-09","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2019-03-31","target_commissioning_window_start_date":"2018-09-01","long_stop_date":"2021-02-28","initial_installed_capacity":"60.00","current_installed_capacity":"50.73","initial_strike_price":"82.50","current_strike_price":"120.28","latitude":"55.50500000","longitude":"-3.80025000","coordinates":"N: 55.529, -3.798\nE: 55.507, -3.779\nS: 55.487, -3.796\nW: 55.497, -3.828","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"9.00","capacity_whole_station":"0.0000","polymorphic_ctype":6},{"id":180,"contract_id":"AAA-NEA-195","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Neart na Gaoithe Offshore Wind Limited","counterparty_registration_no":"SC356223","counterparty_address":"EDF Renewables, Atria One, Level 7, 144 Morrison Street, Edinburgh, EH3 8EX, United Kingdom","project_name":"Neart na Gaoithe","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:02.776847Z","start_date":"2025-04-16","expected_start_date":"2025-02-28","termination_date":null,"target_commissioning_date":"2019-03-31","target_commissioning_window_start_date":"2019-03-31","long_stop_date":"2027-06-17","initial_installed_capacity":"448.00","current_installed_capacity":"448.00","initial_strike_price":"114.39","current_strike_price":"167.68","latitude":"56.09550000","longitude":"-2.37825000","coordinates":"N: 56.339, -2.275\nE: 56.212, -2.154\nS: 55.915, -2.541\nW: 55.916, -2.543","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Round 3","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":19,"contract_id":"AR5-EMB-500","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Magallanes FOW1 Ltd","counterparty_registration_no":"SC758246","counterparty_address":"Unit 2, Warness Park Hatston Pier Road, Crowness Business Park, Kirkwall, KW15 1ZL, United Kingdom","project_name":"EMEC Magallanes Berth 1","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.805581Z","start_date":null,"expected_start_date":"2027-09-01","termination_date":null,"target_commissioning_date":"2028-03-30","target_commissioning_window_start_date":"2027-06-01","long_stop_date":"2029-06-01","initial_installed_capacity":"1.50","current_installed_capacity":"1.50","initial_strike_price":"198.00","current_strike_price":"292.29","latitude":"59.14133750","longitude":"-2.81803500","coordinates":"N: 59.14455, -2.81747\nE: 59.14105, -2.81157\nS: 59.13803, -2.81857\nW: 59.14172, -2.82453","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":142,"contract_id":"AR5-ALS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"ALLER LANGPORT SOLAR PARK LIMITED","counterparty_registration_no":"08651184","counterparty_address":"35 And 35a The Maltings Lower Charlton Trading Estate, Shepton Mallet, BA4 5QE, United Kingdom","project_name":"Aller Langport Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.871724Z","start_date":"2025-08-05","expected_start_date":"2025-07-01","termination_date":null,"target_commissioning_date":"2025-04-01","target_commissioning_window_start_date":"2025-04-01","long_stop_date":"2026-07-01","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.05900000","longitude":"-2.87775000","coordinates":"N: 51.061, -2.88\nE: 51.059, -2.874\nS: 51.057, -2.877\nW: 51.059, -2.88","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":251,"contract_id":"AR5-NSN-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"NEXTPOWER SPV 9 LIMITED","counterparty_registration_no":"12043717","counterparty_address":"5th Floor North Side, 7-10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"NextPower SPV 9 Ltd","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.889820Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"27.00","current_installed_capacity":"24.20","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.77425000","longitude":"-1.18225000","coordinates":"N: 52.78, -1.187\nE: 52.771, -1.175\nS: 52.77, -1.178\nW: 52.776, -1.189","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"2.80","capacity_whole_station":null,"polymorphic_ctype":6},{"id":41,"contract_id":"AR4-OKN-900","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"Orkney Islands Council","counterparty_registration_no":"","counterparty_address":"Orkney Islands Council, School Place, Kirkwall, KW15 1NY, United Kingdom","project_name":"Orkney Community Wind Farm Project - Quanterness","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:02.922812Z","start_date":null,"expected_start_date":"2028-09-15","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-09-30","long_stop_date":"2030-06-30","initial_installed_capacity":"28.80","current_installed_capacity":"28.80","initial_strike_price":"46.39","current_strike_price":"68.48","latitude":"59.00625000","longitude":"-3.02725000","coordinates":"N: 59.01, -3.036\nE: 59.008, -3.001\nS: 58.998, -3.033\nW: 59.009, -3.039","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":60,"contract_id":"AR4-ADS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"FOX COVERT SOLAR FARM LIMITED","counterparty_registration_no":"12689930","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Adstock","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:02.951590Z","start_date":"2025-07-01","expected_start_date":"2025-06-30","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.96350000","longitude":"-0.89925000","coordinates":"N: 51.966, -0.903\nE: 51.964, -0.892\nS: 51.959, -0.898\nW: 51.965, -0.904","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":256,"contract_id":"AR5-PER-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"PERRINPIT ROAD SOLAR LIMITED","counterparty_registration_no":"12368130","counterparty_address":"Uk House 5th Floor, 164-182 Oxford Street, London, W1D 1NN, United Kingdom","project_name":"PERRINPIT ROAD SOLAR LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:02.978295Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"38.63","current_installed_capacity":"38.63","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.54575000","longitude":"-2.50050000","coordinates":"N: 51.552, -2.502\nE: 51.545, -2.488\nS: 51.537, -2.5\nW: 51.549, -2.512","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":190,"contract_id":"AR5-SLW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SLICKLY WIND FARM LIMITED","counterparty_registration_no":"11248508","counterparty_address":"19th Floor 22 Bishopsgate, London, EC2N 4BQ, United Kingdom","project_name":"Slickly Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-07-16T01:00:03.587266Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":"2026-07-15","target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"58.57775000","longitude":"-3.17950000","coordinates":"N: 58.587, -3.19\nE: 58.571, -3.155\nS: 58.57, -3.166\nW: 58.583, -3.207","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":360,"contract_id":"AR6-MEC-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"MONTREATHMONT ENERGY CENTRE LIMITED","counterparty_registration_no":"12988209","counterparty_address":"Building 7, Floor 2, Unit 5 Chiswick Business Park, 566 Chiswick High Road, London, W4 5YG, United Kingdom","project_name":"MONTREATHMONT ENERGY CENTRE LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.795040Z","start_date":null,"expected_start_date":"2029-10-08","termination_date":null,"target_commissioning_date":"2029-10-08","target_commissioning_window_start_date":"2029-10-08","long_stop_date":"2031-01-08","initial_installed_capacity":"34.37","current_installed_capacity":"34.37","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"56.67200000","longitude":"-2.67150000","coordinates":"N: 56.68, -2.673\nE: 56.672, -2.661\nS: 56.669, -2.675\nW: 56.667, -2.677","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":349,"contract_id":"AR6-LEW-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BANKS RENEWABLES (LETHANS WIND FARM) LIMITED","counterparty_registration_no":"08217768","counterparty_address":"Inkerman House St. Johns Road, Meadowfield, Durham, DH7 8XL, United Kingdom","project_name":"Lethans Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.806828Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"120.00","current_installed_capacity":"120.00","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"55.41975000","longitude":"-4.09225000","coordinates":"N: 55.439, -4.048\nE: 55.43, -4.022\nS: 55.405, -4.149\nW: 55.405, -4.15","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":387,"contract_id":"AR6-SEH-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"STRATHRUDDIE ENERGY CENTRE LIMITED","counterparty_registration_no":"13026486","counterparty_address":"Building 7, Floor 2, Unit 5 Chiswick Business Park, 566 Chiswick High Road, London, W4 5YG, United Kingdom","project_name":"STRATHRUDDIE ENERGY CENTRE LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.817690Z","start_date":null,"expected_start_date":"2027-07-30","termination_date":null,"target_commissioning_date":"2027-04-30","target_commissioning_window_start_date":"2026-10-31","long_stop_date":"2028-07-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"56.16350000","longitude":"-3.26075000","coordinates":"N: 56.168, -3.256\nE: 56.165, -3.254\nS: 56.159, -3.263\nW: 56.162, -3.27","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":342,"contract_id":"AR6-KES-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"Kemberton Solar Limited","counterparty_registration_no":"13074901","counterparty_address":"10 Lower Thames Street, London, EC3R 6AF, United Kingdom","project_name":"Kemberton Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.828843Z","start_date":null,"expected_start_date":"2027-01-04","termination_date":null,"target_commissioning_date":"2027-01-04","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2028-04-01","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.63450000","longitude":"-2.41000000","coordinates":"N: 52.638, -2.411\nE: 52.633, -2.407\nS: 52.633, -2.408\nW: 52.634, -2.414","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":439,"contract_id":"AR7-KEI-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SIRIUS ECODEV (KEITHICK) LTD","counterparty_registration_no":"13170877","counterparty_address":"Overross House, Ross Park, Ross-On-Wye, HR9 7US, United Kingdom","project_name":"Keithick","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:03.860975Z","start_date":null,"expected_start_date":"2029-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-30","long_stop_date":"2031-03-29","initial_installed_capacity":"16.00","current_installed_capacity":"16.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"56.53950000","longitude":"-3.30050000","coordinates":"N: 56.543, -3.304\nE: 56.539, -3.288\nS: 56.536, -3.298\nW: 56.54, -3.312","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":546,"contract_id":"AR7-SAI-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SANQUHAR II COMMUNITY WIND CO LTD","counterparty_registration_no":"SC449688","counterparty_address":"Caledonian Exchange, 19a Canning Street, Edinburgh, EH3 8HE, United Kingdom","project_name":"SANQUHAR II COMMUNITY WIND FARM BMU1","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:03.973908Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2028-12-31","initial_installed_capacity":"83.40","current_installed_capacity":"83.40","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"55.34400000","longitude":"-4.06325000","coordinates":"N: 55.375, -3.991\nE: 55.371, -3.985\nS: 55.305, -4.112\nW: 55.325, -4.165","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":588,"contract_id":"AR7-CSA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"COBWOOD SOLAR FARM LIMITED","counterparty_registration_no":"14220766","counterparty_address":"19th Floor 10 Upper Bank Street, Canary Wharf, London, E14 5BF, United Kingdom","project_name":"Cobwood Solar Farm 1","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:03.988782Z","start_date":null,"expected_start_date":"2027-10-31","termination_date":null,"target_commissioning_date":"2027-10-31","target_commissioning_window_start_date":"2027-09-01","long_stop_date":"2029-08-31","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.99325000","longitude":"-0.29525000","coordinates":"N: 51.001, -0.291\nE: 50.999, -0.286\nS: 50.986, -0.293\nW: 50.987, -0.311","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":323,"contract_id":"AR6-GOW-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK ONSHORE WIND LIMITED","counterparty_registration_no":"03758407","counterparty_address":"Greenwood House Westwood Way, Westwood Business Park, Coventry, CV4 8PB, United Kingdom","project_name":"Golticlay Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:04.014328Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-08-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-04-01","initial_installed_capacity":"64.60","current_installed_capacity":"62.70","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"58.34775000","longitude":"-3.34025000","coordinates":"N: 58.354, -3.342\nE: 58.351, -3.308\nS: 58.336, -3.352\nW: 58.35, -3.359","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"1.90","capacity_whole_station":null,"polymorphic_ctype":6},{"id":547,"contract_id":"AR7-OMA-504","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"ORBITAL PROJECTS 10 LIMITED","counterparty_registration_no":"SC806502","counterparty_address":"Innovation Centre - Orkney Hatston Pier Road, Crowness Business Park, Kirkwall, KW15 1ZL, United Kingdom","project_name":"Orbital Marine Eday 5","base_year":2024,"agreement_type":"Private Network","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-09-08T01:00:03.410243Z","start_date":null,"expected_start_date":"2030-08-14","termination_date":null,"target_commissioning_date":"2030-03-31","target_commissioning_window_start_date":"2030-03-31","long_stop_date":"2032-03-30","initial_installed_capacity":"2.40","current_installed_capacity":"2.40","initial_strike_price":"265.00","current_strike_price":"280.06","latitude":"59.14775000","longitude":"-2.81025000","coordinates":"N: 59.166, -2.81\nE: 59.139, -2.783\nS: 59.126, -2.801\nW: 59.16, -2.847","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":74,"contract_id":"AR4-CCP-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"CORNER COPSE SOLAR LIMITED","counterparty_registration_no":"11761723","counterparty_address":"Uk House 5th Floor, 164-182 Oxford Street, London, W1D 1NN, United Kingdom","project_name":"Corner Copse","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-10-31T01:00:03.573538Z","start_date":null,"expected_start_date":"2026-12-15","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-03-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.60875000","longitude":"-1.74550000","coordinates":"N: 51.625, -1.745\nE: 51.612, -1.728\nS: 51.596, -1.754\nW: 51.602, -1.755","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":173,"contract_id":"AR5-MEB-510","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"MeyGen PLC","counterparty_registration_no":"SC347501","counterparty_address":"26 Dublin Street, Edinburgh, EH3 6NN, United Kingdom","project_name":"MeyGen AR53","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:03.059134Z","start_date":null,"expected_start_date":"2031-06-30","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2032-12-12","initial_installed_capacity":"2.94","current_installed_capacity":"2.94","initial_strike_price":"198.00","current_strike_price":"294.31","latitude":"58.65950000","longitude":"-3.13150000","coordinates":"N: 58.663, -3.141\nE: 58.661, -3.11\nS: 58.655, -3.132\nW: 58.659, -3.143","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":244,"contract_id":"AR5-LOS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"OPDENERGY UK 3 LIMITED","counterparty_registration_no":"13029774","counterparty_address":"Grenville Court, Britwell Road, Burnham, SL1 8DF, United Kingdom","project_name":"Locquiers Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:03.091268Z","start_date":null,"expected_start_date":"2027-04-30","termination_date":null,"target_commissioning_date":"2026-06-02","target_commissioning_window_start_date":"2026-03-31","long_stop_date":"2028-07-31","initial_installed_capacity":"15.36","current_installed_capacity":"12.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.85475000","longitude":"-2.50000000","coordinates":"N: 51.858, -2.499\nE: 51.855, -2.497\nS: 51.852, -2.5\nW: 51.854, -2.504","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"3.36","capacity_whole_station":null,"polymorphic_ctype":6},{"id":93,"contract_id":"AR5-HEW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"HEATHLAND WINDFARM PARTNERSHIP LLP","counterparty_registration_no":"OC353593","counterparty_address":"Alexander House 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland, DH4 5RA, United Kingdom","project_name":"Heathland Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:03.114266Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"55.79625000","longitude":"-3.64925000","coordinates":"N: 55.813, -3.638\nE: 55.802, -3.617\nS: 55.781, -3.663\nW: 55.789, -3.679","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":194,"contract_id":"AR5-SSW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SSE GENERATION LIMITED","counterparty_registration_no":"02310571","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Strathy South Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:03.130375Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"231.00","current_installed_capacity":"217.00","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"58.44250000","longitude":"-4.07400000","coordinates":"N: 58.461, -4.075\nE: 58.45, -4.033\nS: 58.41, -4.068\nW: 58.449, -4.12","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"14.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":84,"contract_id":"AR4-EAS-012","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"EAST ANGLIA THREE LIMITED","counterparty_registration_no":"08141208","counterparty_address":"3rd Floor, 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"EA3, Phase 2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:03.263736Z","start_date":null,"expected_start_date":"2029-03-29","termination_date":null,"target_commissioning_date":"2029-03-29","target_commissioning_window_start_date":"2029-03-29","long_stop_date":"2032-03-29","initial_installed_capacity":"491.15","current_installed_capacity":"375.59","initial_strike_price":"37.35","current_strike_price":"50.14","latitude":"52.71776500","longitude":"2.91043500","coordinates":"N: 52.76031, 2.8677\nE: 52.77169, 3.03773\nS: 52.63184, 2.89251\nW: 52.70722, 2.8438","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_A","total_permitted_reduction_mw":"115.56","capacity_whole_station":null,"polymorphic_ctype":6},{"id":139,"contract_id":"AR5-YNL-510","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"HYDROWING TIDAL PROJECTS LIMITED","counterparty_registration_no":"13839335","counterparty_address":"M S Parc, Parc Gwyddoniaeth Menai, Gaerwen, Ynys Mon, LL60 6AG, United Kingdom","project_name":"Ynnir Lleuad","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:03.318946Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2027-11-01","long_stop_date":"2029-11-01","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"198.00","current_strike_price":"294.31","latitude":"53.31475000","longitude":"-4.70550000","coordinates":"N: 53.324, -4.703\nE: 53.324, -4.695\nS: 53.305, -4.708\nW: 53.306, -4.716","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":169,"contract_id":"AR4-LFS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"LOW FARM SOLAR LIMITED","counterparty_registration_no":"12591305","counterparty_address":"5 New Street Square, London, EC4A 3TW, United Kingdom","project_name":"Low Farm Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:03.370643Z","start_date":"2025-06-16","expected_start_date":"2025-04-30","termination_date":null,"target_commissioning_date":"2024-06-01","target_commissioning_window_start_date":"2023-09-24","long_stop_date":"2025-07-24","initial_installed_capacity":"49.89","current_installed_capacity":"40.06","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.09925000","longitude":"0.17900000","coordinates":"N: 53.103, 0.182\nE: 53.102, 0.189\nS: 53.096, 0.178\nW: 53.096, 0.167","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"8.89","capacity_whole_station":null,"polymorphic_ctype":6},{"id":164,"contract_id":"AR4-ICP-012","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"INCH CAPE OFFSHORE LIMITED","counterparty_registration_no":"SC373173","counterparty_address":"Ground Floor, New Clarendon, 114-116 George Street, Edinburgh, EH2 4LH, United Kingdom","project_name":"Inch Cape Phase 2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-05-08T01:00:03.518487Z","start_date":null,"expected_start_date":"2031-03-29","termination_date":null,"target_commissioning_date":"2029-03-29","target_commissioning_window_start_date":"2028-03-30","long_stop_date":"2031-03-30","initial_installed_capacity":"405.00","current_installed_capacity":"300.00","initial_strike_price":"37.35","current_strike_price":"50.14","latitude":"56.48382500","longitude":"-2.13207500","coordinates":"N: 56.5702, -2.1602\nE: 56.4488, -2.0476\nS: 56.4387, -2.0782\nW: 56.4776, -2.2423","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_N","total_permitted_reduction_mw":"105.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":589,"contract_id":"AR7-KIS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"KITLAND SOLAR FARM LIMITED","counterparty_registration_no":"14964494","counterparty_address":"19th Floor 22 Bishopsgate, London, EC2N 4BQ, United Kingdom","project_name":"Kitland Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-09-11T01:00:02.913427Z","start_date":null,"expected_start_date":"2029-04-26","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"39.99","current_installed_capacity":"39.99","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.35400000","longitude":"-2.77850000","coordinates":"N: 51.359, -2.781\nE: 51.355, -2.767\nS: 51.347, -2.776\nW: 51.355, -2.79","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":552,"contract_id":"AR7-WEA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WESTFIELD ENERGY LIMITED","counterparty_registration_no":"SC574446","counterparty_address":"C/O Brockwell Energy Limited The Eagle Building-Third Floor, 19 Rose Street, Edinburgh, EH2 2PR, United Kingdom","project_name":"Westfield Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.041589Z","start_date":null,"expected_start_date":"2027-11-30","termination_date":null,"target_commissioning_date":"2027-11-30","target_commissioning_window_start_date":"2027-11-30","long_stop_date":"2029-11-29","initial_installed_capacity":"29.90","current_installed_capacity":"29.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"56.17775000","longitude":"-3.28750000","coordinates":"N: 56.18, -3.288\nE: 56.179, -3.281\nS: 56.175, -3.286\nW: 56.177, -3.295","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":561,"contract_id":"AR7-FIB-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GR RENEWABLES 1 LIMITED","counterparty_registration_no":"13761246","counterparty_address":"6th Floor 25 Farringdon Street, London, EC4A 4AB, United Kingdom","project_name":"Fibden Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.378068Z","start_date":null,"expected_start_date":"2028-03-01","termination_date":null,"target_commissioning_date":"2029-02-28","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-02-28","initial_installed_capacity":"32.00","current_installed_capacity":"32.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.29850000","longitude":"-2.15900000","coordinates":"N: 52.303, -2.161\nE: 52.297, -2.152\nS: 52.294, -2.155\nW: 52.3, -2.168","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":590,"contract_id":"AR7-LTL-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LOWER TEAN LEYS SOLAR FARM LIMITED","counterparty_registration_no":"12870889","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"LOWER TEAN LEYS SOLAR FARM LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.646494Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.93400000","longitude":"-1.99475000","coordinates":"N: 52.941, -1.998\nE: 52.934, -1.98\nS: 52.928, -1.996\nW: 52.933, -2.005","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":594,"contract_id":"AR7-ABS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"AR108 BOLT SOLAR FARM LIMITED","counterparty_registration_no":"13295263","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"AR108 BOLT SOLAR FARM LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.663850Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"6.00","current_installed_capacity":"6.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.31025000","longitude":"-0.38800000","coordinates":"N: 52.314, -0.389\nE: 52.308, -0.385\nS: 52.308, -0.385\nW: 52.311, -0.393","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":598,"contract_id":"AR7-BWP-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BETTYHILL 2 WIND LTD","counterparty_registration_no":"11575615","counterparty_address":"The Barn Ford Farm, Aldbourne, Marlborough, SN8 2DP, United Kingdom","project_name":"Bettyhill Wind Farm Phase 2","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.675631Z","start_date":null,"expected_start_date":"2028-03-01","termination_date":null,"target_commissioning_date":"2028-03-01","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-02-28","initial_installed_capacity":"48.00","current_installed_capacity":"48.00","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"58.50675000","longitude":"-4.16750000","coordinates":"N: 58.53, -4.18\nE: 58.495, -4.148\nS: 58.489, -4.163\nW: 58.513, -4.179","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":599,"contract_id":"AR7-CDW-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"CAIRN DUHIE ENERGY LIMITED","counterparty_registration_no":"13889244","counterparty_address":"Beaufort Court, Egg Farm Lane, Kings Langley, WD4 8LR, United Kingdom","project_name":"Cairn Duhie Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.688683Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"67.20","current_installed_capacity":"67.20","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"57.47250000","longitude":"-3.70425000","coordinates":"N: 57.486, -3.701\nE: 57.485, -3.685\nS: 57.443, -3.704\nW: 57.476, -3.727","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":600,"contract_id":"AR7-BWO-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BLUEBELL WOOD SOLAR FARM LIMITED","counterparty_registration_no":"13827752","counterparty_address":"19th Floor 10 Upper Bank Street, Canary Wharf, London, E14 5BF, United Kingdom","project_name":"Bluebell Wood Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.708576Z","start_date":null,"expected_start_date":"2029-02-26","termination_date":null,"target_commissioning_date":"2029-02-26","target_commissioning_window_start_date":"2028-06-01","long_stop_date":"2030-05-31","initial_installed_capacity":"49.00","current_installed_capacity":"49.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.28475000","longitude":"-2.26200000","coordinates":"N: 51.294, -2.267\nE: 51.279, -2.252\nS: 51.279, -2.255\nW: 51.287, -2.274","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":213,"contract_id":"AR4-BHL-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 18 LTD","counterparty_registration_no":"12140413","counterparty_address":"Sackville House, 143-149 Fenchurch Street, London, EC3M 6BL, United Kingdom","project_name":"Bunkers Hill","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:03.406994Z","start_date":"2026-03-25","expected_start_date":"2026-04-01","termination_date":null,"target_commissioning_date":"2025-01-01","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2026-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.30350000","longitude":"-0.95200000","coordinates":"N: 51.31, -0.952\nE: 51.309, -0.945\nS: 51.295, -0.952\nW: 51.3, -0.959","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":181,"contract_id":"AR4-NEL-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"Monica Solar Limited","counterparty_registration_no":"11871728","counterparty_address":"10 Lower Thames Street, London, EC3R 6AF, United Kingdom","project_name":"Whitecross Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:03.425529Z","start_date":"2025-03-31","expected_start_date":"2025-03-31","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"23.00","current_installed_capacity":"23.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.97525000","longitude":"-0.36750000","coordinates":"N: 52.978, -0.358\nE: 52.975, -0.357\nS: 52.974, -0.377\nW: 52.974, -0.378","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":176,"contract_id":"AR4-MLF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"MOSS LANE FARM SOLAR LIMITED","counterparty_registration_no":"09034375","counterparty_address":"5th Floor, North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"MOSS LANE FARM SOLAR LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:03.454904Z","start_date":null,"expected_start_date":"2026-11-30","termination_date":null,"target_commissioning_date":"2026-08-31","target_commissioning_window_start_date":"2026-08-31","long_stop_date":"2027-11-30","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.12950000","longitude":"-2.44550000","coordinates":"N: 53.133, -2.441\nE: 53.129, -2.437\nS: 53.125, -2.449\nW: 53.131, -2.455","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":241,"contract_id":"AR4-KWE-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SCOTTISHPOWER RENEWABLES (UK) LIMITED","counterparty_registration_no":"NI028425","counterparty_address":"The Soloist, 1 Lanyon Place, Belfast, BT1 3LP, United Kingdom","project_name":"Kilgallioch windfarm extension","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:03.563733Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-03-31","initial_installed_capacity":"51.30","current_installed_capacity":"51.30","initial_strike_price":"42.47","current_strike_price":"57.75","latitude":"54.98875000","longitude":"-4.74000000","coordinates":"N: 55.003, -4.744\nE: 54.981, -4.714\nS: 54.977, -4.723\nW: 54.994, -4.779","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":196,"contract_id":"AR4-VWF-910","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"Viking Energy Wind Farm LLP","counterparty_registration_no":"SO305400","counterparty_address":"Stewart Building Esplanade, Lerwick, Shetland, ZE1 0LL, United Kingdom","project_name":"Viking Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:03.630826Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","long_stop_date":"2029-03-31","initial_installed_capacity":"220.00","current_installed_capacity":"220.00","initial_strike_price":"46.39","current_strike_price":"63.58","latitude":"60.29225000","longitude":"-1.25875000","coordinates":"N: 60.351, -1.206\nE: 60.299, -1.15\nS: 60.236, -1.319\nW: 60.283, -1.36","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":553,"contract_id":"AR7-ROT-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"ROLLESTON 2 SOLAR FARM LIMITED","counterparty_registration_no":"13862259","counterparty_address":"Millstream, Maidenhead Road, Windsor, SL4 5GD, United Kingdom","project_name":"Rolleston Farm Park 2","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-10-31T01:00:04.126033Z","start_date":null,"expected_start_date":"2026-12-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2026-04-02","long_stop_date":"2028-04-01","initial_installed_capacity":"12.00","current_installed_capacity":"12.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.84250000","longitude":"-1.67750000","coordinates":"N: 52.846, -1.676\nE: 52.843, -1.674\nS: 52.839, -1.679\nW: 52.842, -1.681","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":146,"contract_id":"AR4-BCW-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"BROKEN CROSS WIND FARM LIMITED","counterparty_registration_no":"SC579904","counterparty_address":"Ground Floor West Suite Prospect House, 5 Thistle Street, Edinburgh, EH2 1DF, United Kingdom","project_name":"Broken Cross Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:03.717813Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-03-31","initial_installed_capacity":"48.00","current_installed_capacity":"42.35","initial_strike_price":"42.47","current_strike_price":"57.75","latitude":"55.62000000","longitude":"-3.83700000","coordinates":"N: 55.624, -3.849\nE: 55.624, -3.821\nS: 55.608, -3.828\nW: 55.624, -3.85","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"5.65","capacity_whole_station":null,"polymorphic_ctype":6},{"id":250,"contract_id":"AR4-NXP-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"NEXTPOWER CRIFTON LIMITED","counterparty_registration_no":"11868608","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"NEXTPOWER CRIFTON LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-06-26T01:00:03.491694Z","start_date":"2026-06-24","expected_start_date":"2026-06-24","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.12275000","longitude":"-1.04600000","coordinates":"N: 53.126, -1.041\nE: 53.126, -1.039\nS: 53.118, -1.049\nW: 53.121, -1.055","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":97,"contract_id":"AR4-HST-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"HIGHER STOCKBRIDGE LTD.","counterparty_registration_no":"11677217","counterparty_address":"Voltalia UK Ltd, The Wheelhouse, Bond's Mill Estate, Stonehouse, Gloucestershire, GL10 3RF, United Kingdom","project_name":"HIGHER STOCKBRIDGE","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-08-13T01:00:04.884310Z","start_date":null,"expected_start_date":"2027-08-31","termination_date":null,"target_commissioning_date":"2026-07-15","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2027-07-15","initial_installed_capacity":"35.00","current_installed_capacity":"35.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"50.89275000","longitude":"-2.52625000","coordinates":"N: 50.901, -2.524\nE: 50.895, -2.518\nS: 50.887, -2.526\nW: 50.888, -2.537","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":529,"contract_id":"AR7-GLU-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GLEN ULLINISH WF LIMITED","counterparty_registration_no":"SC380407","counterparty_address":"3rd Floor, Maxim 10, Parklands Avenue, Motherwell, ML1 4WQ, United Kingdom","project_name":"Glen Ullinish","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:03.236140Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"57.38800000","longitude":"-6.42450000","coordinates":"N: 57.407, -6.401\nE: 57.401, -6.39\nS: 57.368, -6.445\nW: 57.376, -6.462","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":534,"contract_id":"AR7-BEC-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BERDEN SOLAR LIMITED","counterparty_registration_no":"10915418","counterparty_address":"5th Floor 80 Victoria Street, London, SW1E 5JL, United Kingdom","project_name":"Berden Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:03.251484Z","start_date":null,"expected_start_date":"2027-05-31","termination_date":null,"target_commissioning_date":"2027-05-31","target_commissioning_window_start_date":"2027-05-01","long_stop_date":"2029-04-30","initial_installed_capacity":"40.25","current_installed_capacity":"40.25","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.94200000","longitude":"0.12475000","coordinates":"N: 51.946, 0.13\nE: 51.944, 0.131\nS: 51.937, 0.12\nW: 51.941, 0.118","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":601,"contract_id":"AR7-TSO-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"TALGREN SOLAR LIMITED","counterparty_registration_no":"13043359","counterparty_address":"24 Savile Row, 3rd Floor, London, W1S 2ES, United Kingdom","project_name":"Talgren Solar Ltd","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.801015Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"7.23","current_installed_capacity":"7.23","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.56050000","longitude":"-3.39600000","coordinates":"N: 51.564, -3.394\nE: 51.56, -3.389\nS: 51.558, -3.397\nW: 51.56, -3.404","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":608,"contract_id":"AR7-MWI-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"MOORSHIELD WIND FARM LIMITED","counterparty_registration_no":"SC641153","counterparty_address":"WIND 2 OFFICE 2 WALKER STREET, Edinburgh, EH3 7LB, United Kingdom","project_name":"Moorshield Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.819934Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"55.71550000","longitude":"-4.35850000","coordinates":"N: 55.717, -4.362\nE: 55.717, -4.354\nS: 55.711, -4.353\nW: 55.717, -4.365","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":604,"contract_id":"AR7-CAT-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LUMINOUS ENERGY (EF) LIMITED","counterparty_registration_no":"10327333","counterparty_address":"Hartham Park, Hartham Lane, Corsham, SN13 0RP, United Kingdom","project_name":"Cattybrook Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.832400Z","start_date":null,"expected_start_date":"2028-05-29","termination_date":null,"target_commissioning_date":"2028-07-01","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.55450000","longitude":"-2.60100000","coordinates":"N: 51.566, -2.602\nE: 51.55, -2.593\nS: 51.548, -2.596\nW: 51.554, -2.613","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":602,"contract_id":"AR7-WOO-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EEB45 LIMITED","counterparty_registration_no":"12168762","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Woodlands Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.853731Z","start_date":null,"expected_start_date":"2028-10-01","termination_date":null,"target_commissioning_date":"2028-10-01","target_commissioning_window_start_date":"2028-10-01","long_stop_date":"2030-09-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.16775000","longitude":"1.01800000","coordinates":"N: 52.171, 1.023\nE: 52.167, 1.028\nS: 52.165, 1.016\nW: 52.168, 1.005","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":607,"contract_id":"AR7-MFD-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"MYNYDD FFORCH DWM WIND ENERGY 2021 LIMITED","counterparty_registration_no":"13658788","counterparty_address":"Third Floor, 10 Lower Grosvenor Place, London, SW1W 0EN, United Kingdom","project_name":"MYNYDD FFORCH DWM","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.863570Z","start_date":null,"expected_start_date":"2027-09-01","termination_date":null,"target_commissioning_date":"2027-09-01","target_commissioning_window_start_date":"2027-08-31","long_stop_date":"2029-08-30","initial_installed_capacity":"26.80","current_installed_capacity":"26.80","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"51.66150000","longitude":"-3.70800000","coordinates":"N: 51.673, -3.692\nE: 51.667, -3.684\nS: 51.651, -3.723\nW: 51.655, -3.733","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":605,"contract_id":"AR7-STR-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"REGENER8 SPV 4 LIMITED","counterparty_registration_no":"13654863","counterparty_address":"4th Floor 361-373 City Road, London, EC1V 1LR, United Kingdom","project_name":"Stowey Road","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.888385Z","start_date":null,"expected_start_date":"2028-03-01","termination_date":null,"target_commissioning_date":"2028-03-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-12-31","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.32225000","longitude":"-2.57575000","coordinates":"N: 51.327, -2.572\nE: 51.321, -2.569\nS: 51.319, -2.578\nW: 51.322, -2.584","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":613,"contract_id":"AR7-HIC-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HIGH CONSTELLATION WINDFARM LIMITED","counterparty_registration_no":"11800500","counterparty_address":"22 Chancery Lane, London, WC2A 1LS, United Kingdom","project_name":"High Constellation Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.901120Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-04-01","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"50.00","current_installed_capacity":"50.00","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"55.71575000","longitude":"-5.50750000","coordinates":"N: 55.775, -5.521\nE: 55.7, -5.453\nS: 55.681, -5.511\nW: 55.707, -5.545","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":585,"contract_id":"AR7-CSE-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"COLBRANS SOLAR ESS LIMITED","counterparty_registration_no":"15400921","counterparty_address":"3rd Floor St Georges House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"Colbrans Solar ESS Limited","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.687652Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"39.90","current_installed_capacity":"39.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.88650000","longitude":"0.12200000","coordinates":"N: 50.895, 0.116\nE: 50.888, 0.134\nS: 50.87, 0.123\nW: 50.893, 0.115","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":579,"contract_id":"AR7-HEG-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"ADS NO. 4 LTD","counterparty_registration_no":"13341709","counterparty_address":"Unit 4 Shieling Court, Corby, NN18 9QD, United Kingdom","project_name":"Hebden Green","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.706631Z","start_date":null,"expected_start_date":"2028-06-04","termination_date":null,"target_commissioning_date":"2028-06-01","target_commissioning_window_start_date":"2028-04-03","long_stop_date":"2030-04-02","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.17375000","longitude":"-2.55500000","coordinates":"N: 53.178, -2.558\nE: 53.171, -2.548\nS: 53.17, -2.555\nW: 53.176, -2.559","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":482,"contract_id":"AR7-EHT-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK ONSHORE WIND LIMITED","counterparty_registration_no":"3758407","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Enoch Hill 2","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.757978Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-04-01","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"9.60","current_installed_capacity":"9.60","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"55.33375000","longitude":"-4.23325000","coordinates":"N: 55.341, -4.233\nE: 55.338, -4.216\nS: 55.325, -4.239\nW: 55.331, -4.245","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":433,"contract_id":"AR7-MIS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"MILTON FARM SOLAR LIMITED","counterparty_registration_no":"14523178","counterparty_address":"3rd Floor, St George's House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"Milton Farm Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.812121Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.71650000","longitude":"-1.80425000","coordinates":"N: 51.72, -1.804\nE: 51.718, -1.8\nS: 51.713, -1.802\nW: 51.715, -1.811","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":606,"contract_id":"AR7-IMW-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"CE LONGSTONES TURBINE LTD","counterparty_registration_no":"13051110","counterparty_address":"80 Strand, London, WC2R 0DT, United Kingdom","project_name":"Imerys Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-12T01:00:03.969962Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"19.96","current_installed_capacity":"19.96","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"50.36425000","longitude":"-4.82750000","coordinates":"N: 50.373, -4.823\nE: 50.371, -4.811\nS: 50.351, -4.836\nW: 50.362, -4.84","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":603,"contract_id":"AR7-FOX-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SPRING DEV 10 LIMITED","counterparty_registration_no":"13690663","counterparty_address":"41-43 Market Place, Chippenham, SN15 3HR, United Kingdom","project_name":"Foxwalks solar farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:03.226744Z","start_date":null,"expected_start_date":"2028-05-01","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"29.40","current_installed_capacity":"29.40","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.32175000","longitude":"-2.09725000","coordinates":"N: 52.327, -2.1\nE: 52.32, -2.079\nS: 52.318, -2.102\nW: 52.322, -2.108","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":307,"contract_id":"AR6-CRI-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CRYSTAL RIG IV LIMITED","counterparty_registration_no":"SC167068","counterparty_address":"C/O Harper Macleod Llp The Cadoro, 45 Gordon Street, Glasgow, G1 3PE, United Kingdom","project_name":"Crystal Rig IV Ltd","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-15T01:00:04.552967Z","start_date":"2026-10-13","expected_start_date":"2026-10-13","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2025-12-01","long_stop_date":"2027-12-01","initial_installed_capacity":"48.20","current_installed_capacity":"48.20","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"55.92850000","longitude":"-2.50200000","coordinates":"N: 55.969, -2.452\nE: 55.965, -2.449\nS: 55.884, -2.53\nW: 55.896, -2.577","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":5,"contract_id":"AAA-ROY-172","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"BHEG EnergyGap (Walsall) Ltd.","counterparty_registration_no":"09119505","counterparty_address":"c/o Pinsent Marsons, 1 Park Row, Leeds, LS1 5AB, United Kingdom","project_name":"BHEG Walsall","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2025-09-11T01:00:02.562656Z","start_date":null,"expected_start_date":null,"termination_date":"2019-05-15","target_commissioning_date":"2018-12-01","target_commissioning_window_start_date":"2018-09-01","long_stop_date":"2020-08-31","initial_installed_capacity":"26.00","current_installed_capacity":"23.40","initial_strike_price":"114.39","current_strike_price":"128.67","latitude":"52.61025000","longitude":"-2.01000000","coordinates":"N: 52.612, -2.009\nE: 52.61, -2.009\nS: 52.609, -2.01\nW: 52.61, -2.012","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"2.60","capacity_whole_station":null,"polymorphic_ctype":6},{"id":236,"contract_id":"INV-HOR-001","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Hornsea 1 Limited","counterparty_registration_no":"07640868","counterparty_address":"Orsted, 5 Howick Place, 5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Offshore Wind Farm Phase 1","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:03.797669Z","start_date":"2019-05-02","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2019-07-31","target_commissioning_window_start_date":"2019-03-31","long_stop_date":"2022-03-30","initial_installed_capacity":"400.00","current_installed_capacity":"400.00","initial_strike_price":"140.00","current_strike_price":"206.06","latitude":"53.89400000","longitude":"1.93625000","coordinates":"N: 53.94, 1.866\nE: 53.888, 2.068\nS: 53.832, 2.019\nW: 53.916, 1.792","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Round 3","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":309,"contract_id":"AR6-DWS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"DERRIL WATER SOLAR LIMITED","counterparty_registration_no":"10196127","counterparty_address":"C/O Communities For Renewables, Redruth House Cornwall Business Park West, Scorrier, Redruth, Cornwall, TR16 5EZ, United Kingdom","project_name":"Derril Water Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-22T01:00:02.762455Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2027-07-01","initial_installed_capacity":"16.80","current_installed_capacity":"15.50","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.79150000","longitude":"-4.42220000","coordinates":"N: 50.7975, -4.4245\nE: 50.7975, -4.4153\nS: 50.785, -4.42\nW: 50.786, -4.429","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"1.30","capacity_whole_station":null,"polymorphic_ctype":6},{"id":226,"contract_id":"AR3-DLW-112","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Druim Leathann Wind Farm Limited","counterparty_registration_no":"SC414109","counterparty_address":"Ground Floor West Suite, Prospect House, 5 Thistle St, Edinburgh, EH2 1DF, United Kingdom","project_name":"Druim Leathann Wind Farm Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-07-16T01:00:03.994900Z","start_date":null,"expected_start_date":"2030-10-31","termination_date":"2026-07-15","target_commissioning_date":"2030-10-31","target_commissioning_window_start_date":"2030-10-31","long_stop_date":"2032-10-31","initial_installed_capacity":"49.50","current_installed_capacity":"49.50","initial_strike_price":"41.611","current_strike_price":"61.43","latitude":"58.34750000","longitude":"-6.23425000","coordinates":"N: 58.359, -6.234\nE: 58.356, -6.22\nS: 58.333, -6.226\nW: 58.342, -6.257","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":28,"contract_id":"AR2-HRN-206","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Soundmark Wind Ltd","counterparty_registration_no":"10721881","counterparty_address":"Orsted, 5 Howick Place, 5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Project 2 Phase 2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2026-04-01T01:00:03.818446Z","start_date":"2024-03-28","expected_start_date":"2024-03-28","termination_date":null,"target_commissioning_date":"2024-04-01","target_commissioning_window_start_date":"2023-04-02","long_stop_date":"2026-04-01","initial_installed_capacity":"462.00","current_installed_capacity":"454.56","initial_strike_price":"57.50","current_strike_price":"82.49","latitude":"53.98550000","longitude":"1.49850000","coordinates":"N: 54.009, 1.439\nE: 54.004, 1.671\nS: 53.92, 1.445\nW: 54.009, 1.439","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":238,"contract_id":"AR2-HRN-106","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Breesea Ltd","counterparty_registration_no":"07883217","counterparty_address":"Orsted, 5 Howick Place, 5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Project 2 Phase 1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2026-04-01T01:00:03.862019Z","start_date":"2024-03-28","expected_start_date":"2024-03-28","termination_date":null,"target_commissioning_date":"2023-03-31","target_commissioning_window_start_date":"2022-04-01","long_stop_date":"2025-03-31","initial_installed_capacity":"462.00","current_installed_capacity":"449.76","initial_strike_price":"57.50","current_strike_price":"82.49","latitude":"53.95425000","longitude":"1.85000000","coordinates":"N: 54.004, 1.671\nE: 53.957, 2.102\nS: 53.917, 1.996\nW: 53.939, 1.631","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":76,"contract_id":"AR3-DP2-201","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Doggerbank Offshore Wind Farm Project 2 Projco Limited","counterparty_registration_no":"07914510","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Dogger Bank B P1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-07-01T01:00:03.114138Z","start_date":null,"expected_start_date":"2027-01-01","termination_date":null,"target_commissioning_date":"2024-09-01","target_commissioning_window_start_date":"2024-06-01","long_stop_date":"2027-11-30","initial_installed_capacity":"302.40","current_installed_capacity":"302.40","initial_strike_price":"41.611","current_strike_price":"57.92","latitude":"54.93600000","longitude":"1.54675000","coordinates":"N: 55.02, 1.496\nE: 54.985, 1.654\nS: 54.868, 1.563\nW: 54.871, 1.474","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":262,"contract_id":"AR3-SEW-102","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Seagreen Wind Energy Limited","counterparty_registration_no":"06873902","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Seagreen Phase 2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-04-01T01:00:04.023887Z","start_date":null,"expected_start_date":"2027-03-30","termination_date":null,"target_commissioning_date":"2026-03-31","target_commissioning_window_start_date":"2026-03-31","long_stop_date":"2029-09-30","initial_installed_capacity":"158.00","current_installed_capacity":"158.00","initial_strike_price":"41.611","current_strike_price":"57.92","latitude":"56.61325000","longitude":"-1.65100000","coordinates":"N: 56.677, -1.603\nE: 56.592, -1.528\nS: 56.583, -1.708\nW: 56.601, -1.765","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Scottish Territorial Waters","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":57,"contract_id":"INV-WAL-002","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Walney Extension Limited","counterparty_registration_no":"07306956","counterparty_address":"Orsted, 5 Howick Place, 5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Walney Extension Offshore Wind Farm Phase 2","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:04.049363Z","start_date":"2018-04-13","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-03-31","target_commissioning_window_start_date":"2018-03-31","long_stop_date":"2021-03-30","initial_installed_capacity":"330.00","current_installed_capacity":"330.00","initial_strike_price":"150.00","current_strike_price":"220.95","latitude":"54.05375000","longitude":"-3.65175000","coordinates":"N: 54.134, -3.749\nE: 54.012, -3.526\nS: 54.004, -3.568\nW: 54.065, -3.764","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Extension","gsp_group":"_G","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":81,"contract_id":"INV-DUD-002","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Dudgeon Offshore Wind Limited","counterparty_registration_no":"04418909","counterparty_address":"1 Kingdom Street, London, W2 6BD, United Kingdom","project_name":"Dudgeon Phase 2","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:04.105223Z","start_date":"2017-08-02","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2017-08-01","target_commissioning_window_start_date":"2017-08-01","long_stop_date":"2020-07-31","initial_installed_capacity":"210.00","current_installed_capacity":"206.23","initial_strike_price":"150.00","current_strike_price":"220.95","latitude":"53.27350000","longitude":"1.38500000","coordinates":"N: 53.315, 1.343\nE: 53.268, 1.447\nS: 53.21, 1.429\nW: 53.301, 1.321","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Round 2","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":144,"contract_id":"INV-BEA-001","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Beatrice Offshore Windfarm Limited","counterparty_registration_no":"SC350248","counterparty_address":"Inveralmond House, 200 Dunkeld Road, 200 Dunkeld Road, Perth, PH1 3AQ, United Kingdom","project_name":"Beatrice Offshore Wind Farm Limited (Phase 1)","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:04.125262Z","start_date":"2018-11-06","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-03-31","target_commissioning_window_start_date":"2018-03-31","long_stop_date":"2021-03-30","initial_installed_capacity":"280.00","current_installed_capacity":"252.00","initial_strike_price":"140.00","current_strike_price":"205.70","latitude":"58.21825000","longitude":"-2.93075000","coordinates":"N: 58.287, -2.919\nE: 58.197, -3.012\nS: 58.164, -2.948\nW: 58.225, -2.844","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Scottish Territorial Waters","gsp_group":"_P","total_permitted_reduction_mw":"28.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":14,"contract_id":"AR3-DP3-302","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Doggerbank Offshore Wind Farm Project 3 Projco Limited","counterparty_registration_no":"07791977","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Dogger Bank C P2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-04-01T01:00:04.191368Z","start_date":null,"expected_start_date":"2027-07-01","termination_date":null,"target_commissioning_date":"2026-01-01","target_commissioning_window_start_date":"2025-08-01","long_stop_date":"2029-01-31","initial_installed_capacity":"441.00","current_installed_capacity":"441.00","initial_strike_price":"41.611","current_strike_price":"57.92","latitude":"55.05325000","longitude":"3.00900000","coordinates":"N: 55.119, 3.099\nE: 55.119, 3.099\nS: 54.955, 3.032\nW: 55.02, 2.806","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":223,"contract_id":"AR3-DP2-203","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Doggerbank Offshore Wind Farm Project 2 Projco Limited","counterparty_registration_no":"07914510","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Dogger Bank B P3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-07-01T01:00:03.185874Z","start_date":null,"expected_start_date":"2027-07-01","termination_date":null,"target_commissioning_date":"2025-05-01","target_commissioning_window_start_date":"2024-12-01","long_stop_date":"2028-05-30","initial_installed_capacity":"456.60","current_installed_capacity":"456.60","initial_strike_price":"41.611","current_strike_price":"57.92","latitude":"54.89350000","longitude":"1.78625000","coordinates":"N: 54.988, 1.858\nE: 54.859, 1.862\nS: 54.859, 1.862\nW: 54.868, 1.563","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":312,"contract_id":"AR6-EAT-010","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EAST ANGLIA THREE LIMITED","counterparty_registration_no":"08141208","counterparty_address":"3rd Floor, 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"EA3B","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-04-01T01:00:04.356699Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2026-11-01","long_stop_date":"2029-11-01","initial_installed_capacity":"158.90","current_installed_capacity":"158.90","initial_strike_price":"54.23","current_strike_price":"80.61","latitude":"52.59850000","longitude":"2.81100000","coordinates":"N: 52.671, 2.863\nE: 52.671, 2.863\nS: 52.526, 2.759\nW: 52.526, 2.759","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":336,"contract_id":"AR6-HLS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"HORSEY LEVELS RENEWABLE ENERGY LIMITED","counterparty_registration_no":"13359318","counterparty_address":"1350-1360 Montpellier Court, Brockworth, Gloucester, GL3 4AH, United Kingdom","project_name":"Horsey Level Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.272989Z","start_date":"2026-04-01","expected_start_date":"2026-04-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-01-02","long_stop_date":"2027-04-02","initial_installed_capacity":"22.08","current_installed_capacity":"20.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.15950000","longitude":"-2.97875000","coordinates":"N: 51.163, -2.981\nE: 51.161, -2.975\nS: 51.153, -2.978\nW: 51.161, -2.981","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"2.08","capacity_whole_station":null,"polymorphic_ctype":6},{"id":191,"contract_id":"AR3-SOW-101","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Sofia Offshore Wind Farm","counterparty_registration_no":"07791964","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Sofia Offshore Wind Farm Phase 1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-09-24T01:00:05.096402Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2024-03-31","target_commissioning_window_start_date":"2024-03-31","long_stop_date":"2028-04-04","initial_installed_capacity":"364.00","current_installed_capacity":"364.00","initial_strike_price":"39.65","current_strike_price":"55.01","latitude":"54.95775000","longitude":"2.16800000","coordinates":"N: 55.08, 2.07\nE: 54.901, 2.384\nS: 54.839, 2.263\nW: 55.011, 1.955","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":306,"contract_id":"AR6-CHS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CRAYS HALL SOLAR LIMITED","counterparty_registration_no":"13683095","counterparty_address":"1st Floor, 14 Wigmore Street, London, W1U 2RE, United Kingdom","project_name":"Crays Hall Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-07-25T01:00:03.674785Z","start_date":"2026-07-24","expected_start_date":"2026-06-30","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-01-02","long_stop_date":"2027-04-02","initial_installed_capacity":"25.92","current_installed_capacity":"25.92","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.61350000","longitude":"0.46100000","coordinates":"N: 51.619, 0.463\nE: 51.615, 0.466\nS: 51.607, 0.461\nW: 51.613, 0.454","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":402,"contract_id":"LCH-WWH-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"MorGen WWH Ltd (UK)","counterparty_registration_no":"14407423","counterparty_address":"14, St George Street, London, W1S 1FE, United Kingdom","project_name":"West Wales Hydrogen Project","base_year":2022,"agreement_type":"Green","contract_version":"Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-04-23T01:00:03.206141Z","start_date":null,"expected_start_date":"2028-03-01","termination_date":null,"target_commissioning_date":"2026-12-31","target_commissioning_window_start_date":"2026-12-31","target_commissioning_window_end_date":"2027-12-31","long_stop_date":"2028-12-31","initial_installed_capacity":"14.10","current_installed_capacity":"14.10","initial_strike_price":"202.54","current_strike_price":"248.72","latitude":null,"longitude":null,"coordinates":"N: 51.740898, -5.06323\nE: 51.7405, -5.061101\nS: 51.73999, -5.061348\nW: 51.740387, -5.063477","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"1101948.00","current_sales_cap":"1101948.00","production_plant_coordinates":"N: 51.740727, -5.06232\nE: 51.7405, -5.061101\nS: 51.73999, -5.061348\nW: 51.740217, -5.062568","production_plant_longitude":"-5.06183425","production_plant_latitude":"51.74035850","cost_estimate_of_storage_of_hydrogen":null,"cost_estimate_of_transport_of_hydrogen":"25.11","polymorphic_ctype":7},{"id":277,"contract_id":"AR6-BAR-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BARNFIELDS SOLAR PARK LIMITED","counterparty_registration_no":"13354397","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Barnfields","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-21T01:00:02.954481Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"14.82","current_installed_capacity":"14.82","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.68800000","longitude":"-1.48275000","coordinates":"N: 50.694, -1.48\nE: 50.685, -1.476\nS: 50.685, -1.476\nW: 50.688, -1.499","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":315,"contract_id":"AR6-EAA-013","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EAST ANGLIA TWO LIMITED","counterparty_registration_no":"11121842","counterparty_address":"3rd Floor 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"East Anglia Two, Phase 3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-04-01T01:00:04.612790Z","start_date":null,"expected_start_date":"2028-08-15","termination_date":null,"target_commissioning_date":"2028-08-15","target_commissioning_window_start_date":"2028-08-15","long_stop_date":"2031-08-15","initial_installed_capacity":"361.15","current_installed_capacity":"361.15","initial_strike_price":"58.87","current_strike_price":"87.51","latitude":"52.08625000","longitude":"2.15750000","coordinates":"N: 52.183, 2.132\nE: 52.049, 2.232\nS: 52.048, 2.145\nW: 52.065, 2.121","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":273,"contract_id":"AR6-ADV-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"ENSO GREEN HOLDINGS Y LIMITED","counterparty_registration_no":"13328867","counterparty_address":"17th Floor HYLO, 103-105 Bunhill Row, London, EC1Y 8LZ, United Kingdom","project_name":"Adur Valley","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.495949Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"14.25","current_installed_capacity":"14.25","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.91375000","longitude":"-0.31550000","coordinates":"N: 50.917, -0.315\nE: 50.914, -0.305\nS: 50.911, -0.32\nW: 50.913, -0.322","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":368,"contract_id":"AR6-OCO-504","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"OCEANSTAR TIDAL LTD","counterparty_registration_no":"SC790200","counterparty_address":"45 Timber Bush, Edinburgh, EH6 6QH, United Kingdom","project_name":"OCEANSTAR 1","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-13T01:00:04.392833Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":"2026-05-12","target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-31","initial_installed_capacity":"1.50","current_installed_capacity":"1.50","initial_strike_price":"172.00","current_strike_price":"253.90","latitude":"59.15050000","longitude":"-2.82600000","coordinates":"N: 59.152, -2.824\nE: 59.15, -2.824\nS: 59.149, -2.828\nW: 59.151, -2.828","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":400,"contract_id":"AR6-YAS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"YANEL FARM SOLAR LIMITED","counterparty_registration_no":"12368007","counterparty_address":"Ground Floor Ibis House, Ibis Court, Warrington, WA1 1RL, United Kingdom","project_name":"Yanel Farm Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-23T01:00:03.604584Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"36.00","current_installed_capacity":"36.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.34675000","longitude":"-2.83175000","coordinates":"N: 51.355, -2.835\nE: 51.344, -2.819\nS: 51.338, -2.836\nW: 51.35, -2.837","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":345,"contract_id":"AR6-LAW-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 21 LIMITED","counterparty_registration_no":"12433929","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Laynes Wood","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:03.732183Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.91000000","longitude":"-2.35225000","coordinates":"N: 51.919, -2.362\nE: 51.904, -2.335\nS: 51.901, -2.342\nW: 51.916, -2.37","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":158,"contract_id":"AR5-EHW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK ONSHORE WIND LIMITED","counterparty_registration_no":"03758407","counterparty_address":"Greenwood House Westwood Way, Westwood Business Park, Coventry, CV4 8PB, United Kingdom","project_name":"Enoch Hill Windfarm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:04.875917Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-04-01","initial_installed_capacity":"69.00","current_installed_capacity":"69.00","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"55.35750000","longitude":"-4.24800000","coordinates":"N: 55.377, -4.225\nE: 55.365, -4.209\nS: 55.327, -4.262\nW: 55.361, -4.296","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":385,"contract_id":"AR6-SSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"STARGOOSE CLEAN ENERGY LIMITED","counterparty_registration_no":"12186954","counterparty_address":"19th Floor 22 Bishopsgate, London, EC2N 4BQ, United Kingdom","project_name":"Stargoose Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-09-11T01:00:03.717168Z","start_date":null,"expected_start_date":"2028-04-14","termination_date":null,"target_commissioning_date":"2027-05-01","target_commissioning_window_start_date":"2027-05-01","long_stop_date":"2028-08-01","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.24570250","longitude":"-0.01734500","coordinates":"N: 52.25042, -0.01843\nE: 52.24751, -0.0084\nS: 52.23892, -0.01674\nW: 52.24596, -0.02581","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":230,"contract_id":"AR4-EGH-710","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"ENSO GREEN HOLDINGS K LIMITED","counterparty_registration_no":"12763391","counterparty_address":"15th Floor Hylo, 103-105 Bunhill Row, London, EC1Y 8LZ, United Kingdom","project_name":"Enso Green Holdings K Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:05.167788Z","start_date":null,"expected_start_date":"2029-10-31","termination_date":null,"target_commissioning_date":"2029-10-31","target_commissioning_window_start_date":"2024-12-31","long_stop_date":"2030-10-31","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"45.99","current_strike_price":"62.99","latitude":"53.21650000","longitude":"-0.85375000","coordinates":"N: 53.225, -0.861\nE: 53.214, -0.842\nS: 53.208, -0.843\nW: 53.219, -0.869","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":112,"contract_id":"AAA-BAN-190","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Banks Renewables (Moor House Wind Farm) Limited","counterparty_registration_no":"06969180","counterparty_address":"Inkerman House, St Johns Road, Meadowfield, Durham, DH7 8XL, United Kingdom","project_name":"Moor House Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:05.189179Z","start_date":"2018-04-03","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-09-29","target_commissioning_window_start_date":"2017-10-01","long_stop_date":"2019-09-30","initial_installed_capacity":"16.40","current_installed_capacity":"11.96","initial_strike_price":"82.50","current_strike_price":"121.79","latitude":"54.56700000","longitude":"-1.49600000","coordinates":"N: 54.578, -1.498\nE: 54.565, -1.476\nS: 54.558, -1.496\nW: 54.567, -1.514","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"4.10","capacity_whole_station":null,"polymorphic_ctype":6},{"id":396,"contract_id":"AR6-WSI-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"WINDY STANDARD III LIMITED","counterparty_registration_no":"SC295868","counterparty_address":"C/O Harper Macleod Llp The Cadoro, 45 Gordon Street, Glasgow, G1 3PE, United Kingdom","project_name":"WINDY STANDARD III LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-01T01:00:04.724905Z","start_date":null,"expected_start_date":"2028-06-01","termination_date":null,"target_commissioning_date":"2026-06-02","target_commissioning_window_start_date":"2026-06-01","long_stop_date":"2028-06-01","initial_installed_capacity":"87.60","current_installed_capacity":"87.60","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"55.27825000","longitude":"-4.25125000","coordinates":"N: 55.315, -4.201\nE: 55.314, -4.201\nS: 55.239, -4.294\nW: 55.245, -4.309","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":296,"contract_id":"AR6-CHE-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CHESTNUT SOLAR FARM LIMITED","counterparty_registration_no":"14907056","counterparty_address":"Woodcock Farm, Loughborough Road, Rothley, LE7 7NH, United Kingdom","project_name":"Chestnut Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-13T01:00:04.419795Z","start_date":"2026-10-09","expected_start_date":"2026-09-30","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2027-07-01","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.70750000","longitude":"-1.09700000","coordinates":"N: 52.712, -1.104\nE: 52.712, -1.09\nS: 52.703, -1.09\nW: 52.703, -1.104","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":69,"contract_id":"AR4-CNS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"CARN NICHOLAS SOLAR LIMITED","counterparty_registration_no":"12534442","counterparty_address":"3rd Floor, St George's House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"Carn Nicholas Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-10T01:00:03.332415Z","start_date":"2025-04-17","expected_start_date":"2025-04-17","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2026-04-01","initial_installed_capacity":"8.00","current_installed_capacity":"8.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.62875000","longitude":"-3.91400000","coordinates":"N: 51.632, -3.916\nE: 51.628, -3.909\nS: 51.627, -3.914\nW: 51.628, -3.917","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":405,"contract_id":"LCH-HPP-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"HYMARNHAM POWER (NOTTINGHAM) LIMITED","counterparty_registration_no":"15584994","counterparty_address":"Bella Vista Farm, Hartcliffe Road, Penistone, S36 9FN, United Kingdom","project_name":"HYMARNHAM POWER PROJECT","base_year":2022,"agreement_type":"Green","contract_version":"Version: Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-04-17T01:00:03.116645Z","start_date":"2026-04-01","expected_start_date":"2026-04-01","termination_date":null,"target_commissioning_date":"2025-06-27","target_commissioning_window_start_date":"2025-05-26","target_commissioning_window_end_date":"2026-05-26","long_stop_date":"2027-05-26","initial_installed_capacity":"9.30","current_installed_capacity":"9.30","initial_strike_price":"216.45","current_strike_price":"265.80","latitude":null,"longitude":null,"coordinates":"N: 53.228369, -0.78865864\nE: 53.22834, -0.78668203\nS: 53.22721, -0.78954522\nW: 53.228207, -0.78953207","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"1048160.00","current_sales_cap":"1048160.00","production_plant_coordinates":"N: 53.228032, -0.78726002\nE: 53.227699, -0.78728439\nS: 53.227665, -0.78833397\nW: 53.228016, -0.78839896","production_plant_longitude":"-0.78781934","production_plant_latitude":"53.22785300","cost_estimate_of_storage_of_hydrogen":"3.97","cost_estimate_of_transport_of_hydrogen":"3.96","polymorphic_ctype":7},{"id":73,"contract_id":"AAA-COM-191","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Common Barn Wind Farm Limited","counterparty_registration_no":"08063892","counterparty_address":"TCI Renewables, Willow Court, Minns Business park, 7 West Way, Oxford, OX2 0JB, United Kingdom","project_name":"Common Barn Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:05.217157Z","start_date":"2019-06-18","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2019-03-30","target_commissioning_window_start_date":"2018-09-30","long_stop_date":"2020-09-29","initial_installed_capacity":"6.15","current_installed_capacity":"6.07","initial_strike_price":"82.50","current_strike_price":"121.79","latitude":"52.27225000","longitude":"-0.27475000","coordinates":"N: 52.279, -0.287\nE: 52.271, -0.258\nS: 52.265, -0.263\nW: 52.274, -0.291","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":268,"contract_id":"AR2-TKN-203","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Triton Knoll Offshore Wind Farm Limited","counterparty_registration_no":"03696654","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Triton Knoll Offshore Wind Farm Phase 2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2026-04-01T01:00:05.283799Z","start_date":"2021-07-06","expected_start_date":"2021-07-05","termination_date":null,"target_commissioning_date":"2022-06-07","target_commissioning_window_start_date":"2021-06-08","long_stop_date":"2024-06-07","initial_installed_capacity":"212.00","current_installed_capacity":"207.20","initial_strike_price":"74.75","current_strike_price":"108.20","latitude":"53.50150000","longitude":"0.79800000","coordinates":"N: 53.535, 0.82\nE: 53.499, 0.857\nS: 53.476, 0.818\nW: 53.496, 0.697","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":159,"contract_id":"AR5-FTW-600","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"PENNANT WALTERS (FOELT) LIMITED","counterparty_registration_no":"08895080","counterparty_address":"Suite F8, Gateway House, Old Hall Road, Bromborough Wirral, CH62 3NX, United Kingdom","project_name":"Foel Trawsnant Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:05.359229Z","start_date":null,"expected_start_date":"2029-02-28","termination_date":null,"target_commissioning_date":"2027-07-31","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2030-03-01","initial_installed_capacity":"34.80","current_installed_capacity":"34.80","initial_strike_price":"52.29","current_strike_price":"77.19","latitude":"51.63525000","longitude":"-3.68325000","coordinates":"N: 51.643, -3.686\nE: 51.632, -3.674\nS: 51.628, -3.678\nW: 51.638, -3.695","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":397,"contract_id":"AR6-WTS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"WOODWALTON SOLAR LIMITED","counterparty_registration_no":"13736021","counterparty_address":"Unit 8-9 Easter Park Benyon Road, Silchester, Reading, RG7 2PQ, United Kingdom","project_name":"Woodwalton Two Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-29T01:00:04.653228Z","start_date":null,"expected_start_date":"2026-11-06","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-03-01","long_stop_date":"2027-06-01","initial_installed_capacity":"16.12","current_installed_capacity":"16.12","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.41800000","longitude":"-0.22825000","coordinates":"N: 52.421, -0.23\nE: 52.417, -0.224\nS: 52.416, -0.226\nW: 52.418, -0.233","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":153,"contract_id":"AR5-CBG-710","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"COWLEY BALDON GREEN LIMITED","counterparty_registration_no":"12517381","counterparty_address":"Ropemaker Place, 28 Ropemaker Street, London, EC2Y 9HD, United Kingdom","project_name":"Cowley Baldon Green Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:05.429001Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2026-02-15","target_commissioning_window_start_date":"2026-01-01","long_stop_date":"2027-04-01","initial_installed_capacity":"49.20","current_installed_capacity":"49.20","initial_strike_price":"47.00","current_strike_price":"69.86","latitude":"51.70000000","longitude":"-1.19925000","coordinates":"N: 51.707, -1.194\nE: 51.696, -1.19\nS: 51.693, -1.196\nW: 51.704, -1.217","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":185,"contract_id":"AR4-NKE-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"NORTH KYLE WIND FARM LIMITED","counterparty_registration_no":"SC572042","counterparty_address":"C/O Brockwell Energy Limited Caledonian Exchange, Edinburgh, EH3 8EG, United Kingdom","project_name":"North Kyle Energy Project","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-07-21T01:00:03.594077Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-09-05","initial_installed_capacity":"212.00","current_installed_capacity":"212.00","initial_strike_price":"42.47","current_strike_price":"57.75","latitude":"55.36800000","longitude":"-4.37975000","coordinates":"N: 55.427, -4.402\nE: 55.388, -4.28\nS: 55.328, -4.418\nW: 55.329, -4.419","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":119,"contract_id":"AR4-OME-504","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"ORBITAL PROJECTS 3 LIMITED","counterparty_registration_no":"SC717030","counterparty_address":"Innovation Centre - Orkney Hatston Pier Road, Crowness Business Park, Kirkwall, KW15 1ZL, United Kingdom","project_name":"Orbital Marine Eday 1","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-09-08T01:00:04.573893Z","start_date":null,"expected_start_date":"2030-08-14","termination_date":null,"target_commissioning_date":"2027-03-16","target_commissioning_window_start_date":"2027-03-01","long_stop_date":"2031-08-30","initial_installed_capacity":"2.40","current_installed_capacity":"2.40","initial_strike_price":"178.54","current_strike_price":"263.56","latitude":"59.14775000","longitude":"-2.81025000","coordinates":"N: 59.166, -2.81\nE: 59.139, -2.783\nS: 59.126, -2.801\nW: 59.16, -2.847","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":545,"contract_id":"AR7-SIC-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SANQUHAR II COMMUNITY WIND CO LTD","counterparty_registration_no":"SC449688","counterparty_address":"Caledonian Exchange, 19a Canning Street, Edinburgh, EH3 8HE, United Kingdom","project_name":"SANQUHAR II COMMUNITY WIND FARM BMU 2","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:03.912647Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-04-01","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-30","initial_installed_capacity":"186.00","current_installed_capacity":"186.00","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"55.29700000","longitude":"-4.02600000","coordinates":"N: 55.322, -4.074\nE: 55.292, -3.965\nS: 55.267, -3.969\nW: 55.307, -4.096","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":557,"contract_id":"AR7-THB-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PACE CARNIVAL ENERGY LIMITED","counterparty_registration_no":"12170015","counterparty_address":"C/O External Services Limited, Central House 20 Central Avenue, St Andrews Business Park, Norwich, NR7 0HR, United Kingdom","project_name":"Three Bridges","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.081043Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.71750000","longitude":"1.04500000","coordinates":"N: 52.72, 1.048\nE: 52.719, 1.049\nS: 52.713, 1.045\nW: 52.718, 1.038","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":550,"contract_id":"AR7-BWS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BF31 WHF SOLAR LIMITED","counterparty_registration_no":"13295269","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"BF31 WHF SOLAR LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.093583Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.06550000","longitude":"0.49300000","coordinates":"N: 52.074, 0.497\nE: 52.066, 0.502\nS: 52.061, 0.487\nW: 52.061, 0.486","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":549,"contract_id":"AR7-MWS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"MID WHITESTONES SOLAR LTD","counterparty_registration_no":"SC739591","counterparty_address":"C/O Locogen Limited, 4 West Silvermills Lane, Edinburgh, EH3 5BD, United Kingdom","project_name":"Mid Whitestones Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.110943Z","start_date":null,"expected_start_date":"2029-03-15","termination_date":null,"target_commissioning_date":"2029-03-15","target_commissioning_window_start_date":"2029-01-01","long_stop_date":"2030-12-31","initial_installed_capacity":"9.90","current_installed_capacity":"9.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"57.56450000","longitude":"-2.26900000","coordinates":"N: 57.567, -2.268\nE: 57.565, -2.264\nS: 57.562, -2.269\nW: 57.564, -2.275","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":555,"contract_id":"AR7-LID-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GRUPOTEC SOLAR UK 5 LIMITED","counterparty_registration_no":"14888176","counterparty_address":"5 Kew Road, Richmond, TW9 2PR, United Kingdom","project_name":"Little Drum","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.132168Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-30","initial_installed_capacity":"36.00","current_installed_capacity":"36.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"54.81825000","longitude":"-4.01875000","coordinates":"N: 54.824, -4.018\nE: 54.82, -4.008\nS: 54.814, -4.021\nW: 54.815, -4.028","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":551,"contract_id":"AR7-FSO-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"FLEET SOLAR LIMITED","counterparty_registration_no":"12368193","counterparty_address":"Ground Floor Ibis House, Ibis Court, Warrington, WA1 1RL, United Kingdom","project_name":"Fleet Solar Limited","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-10-23T01:00:03.671313Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"47.50","current_installed_capacity":"47.50","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"51.22625000","longitude":"-0.95350000","coordinates":"N: 51.234, -0.965\nE: 51.221, -0.926\nS: 51.218, -0.953\nW: 51.232, -0.97","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":548,"contract_id":"AR7-HAA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EEB31 LIMITED","counterparty_registration_no":"11780715","counterparty_address":"Peninsula House, Rydon Lane, Exeter, EX2 7HR, United Kingdom","project_name":"Hale Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.193653Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2028-03-30","target_commissioning_window_start_date":"2027-03-31","long_stop_date":"2029-03-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.84475000","longitude":"-0.75075000","coordinates":"N: 51.854, -0.753\nE: 51.839, -0.746\nS: 51.833, -0.748\nW: 51.853, -0.756","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":434,"contract_id":"AR7-SLS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SOUTH LYNCH SOLAR LIMITED","counterparty_registration_no":"14194102","counterparty_address":"3rd Floor, St George's House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"South Lynch Solar Limited","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.822472Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.05725000","longitude":"-1.39275000","coordinates":"N: 51.062, -1.396\nE: 51.06, -1.381\nS: 51.049, -1.393\nW: 51.058, -1.401","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":425,"contract_id":"AR7-THE-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"TWYN HYWEL ENERGY PARK LIMITED","counterparty_registration_no":"12576991","counterparty_address":"Hodge House, Guildhall Place, Cardiff, CF10 1DY, United Kingdom","project_name":"TWYN HYWEL ENERGY PARK LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.835508Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-30","initial_installed_capacity":"93.80","current_installed_capacity":"93.80","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"51.61600000","longitude":"-3.27050000","coordinates":"N: 51.648, -3.284\nE: 51.611, -3.236\nS: 51.599, -3.247\nW: 51.606, -3.315","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":558,"contract_id":"AR7-UAR-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PACE EPISODE ENERGY LIMITED","counterparty_registration_no":"12397147","counterparty_address":"C/O External Services Limited, Central House 20 Central Avenue, St Andrews Business Park, Norwich, NR7 0HR, United Kingdom","project_name":"UKF086 Attleborough Road","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-12T01:00:04.481795Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.49600000","longitude":"1.03075000","coordinates":"N: 52.499, 1.028\nE: 52.495, 1.038\nS: 52.493, 1.036\nW: 52.497, 1.021","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":556,"contract_id":"AR7-UKT-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PACE JOLT ENERGY LIMITED","counterparty_registration_no":"12645651","counterparty_address":"C/O External Services Limited, Central House 20 Central Avenue, St Andrews Business Park, Norwich, NR7 0HR, United Kingdom","project_name":"UKF092 Tophams","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-16T01:00:03.275514Z","start_date":null,"expected_start_date":"2027-10-29","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.01850000","longitude":"-0.16200000","coordinates":"N: 52.023, -0.162\nE: 52.021, -0.155\nS: 52.015, -0.161\nW: 52.015, -0.17","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":229,"contract_id":"AR4-EST-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 23 LIMITED","counterparty_registration_no":"12433906","counterparty_address":"Sackville House, 143-149 Fenchurch Street, London, EC3M 6BL, United Kingdom","project_name":"Eastfields","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:05.802839Z","start_date":"2026-03-25","expected_start_date":"2026-04-01","termination_date":null,"target_commissioning_date":"2025-01-01","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2026-04-01","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.23900000","longitude":"-1.43100000","coordinates":"N: 52.244, -1.424\nE: 52.243, -1.422\nS: 52.227, -1.43\nW: 52.242, -1.448","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":432,"contract_id":"AR7-LAA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LAINS FARM SOLAR LIMITED","counterparty_registration_no":"13081193","counterparty_address":"6th Floor, Capital Tower, 91 Waterloo Road, London, SE1 8RT, United Kingdom","project_name":"Lains Farm Solar Limited","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-07-08T01:00:03.941210Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.20075000","longitude":"-1.60175000","coordinates":"N: 51.204, -1.594\nE: 51.203, -1.591\nS: 51.198, -1.611\nW: 51.198, -1.611","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":430,"contract_id":"AR7-WYM-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"AGR SOLAR 4 LIMITED","counterparty_registration_no":"12295056","counterparty_address":"Fourth Floor, Burlington Building, 19 Heddon Street, London, W1B 4BG, United Kingdom","project_name":"Wymondley","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.225136Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"28.16","current_installed_capacity":"28.16","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"51.93650000","longitude":"-0.21925000","coordinates":"N: 51.94, -0.218\nE: 51.936, -0.216\nS: 51.933, -0.22\nW: 51.937, -0.223","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":435,"contract_id":"AR7-MMS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"MORETON MORRELL SOLAR LIMITED","counterparty_registration_no":"14948921","counterparty_address":"3rd Floor, St George's House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"MORETON MORRELL SOLAR LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.859158Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.20775000","longitude":"-1.53175000","coordinates":"N: 52.214, -1.524\nE: 52.204, -1.515\nS: 52.202, -1.517\nW: 52.211, -1.571","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":436,"contract_id":"AR7-BUC-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BUCKLESHAM SOLAR LIMITED","counterparty_registration_no":"13965671","counterparty_address":"6th Floor, Capital Tower, 91 Waterloo Road, London, SE1 8RT, United Kingdom","project_name":"Bucklesham Solar Limited","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.869920Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"22.50","current_installed_capacity":"22.50","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.03425000","longitude":"1.28250000","coordinates":"N: 52.038, 1.284\nE: 52.033, 1.287\nS: 52.031, 1.28\nW: 52.035, 1.279","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":426,"contract_id":"AR7-LER-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"OPDENERGY UK 7 LIMITED","counterparty_registration_no":"13423886","counterparty_address":"Grenville Court, Britwell Road, Burnham, SL1 8DF, United Kingdom","project_name":"Leaps Rigg","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.881425Z","start_date":null,"expected_start_date":"2028-12-31","termination_date":null,"target_commissioning_date":"2028-12-31","target_commissioning_window_start_date":"2028-12-31","long_stop_date":"2030-12-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"55.00475000","longitude":"-2.76350000","coordinates":"N: 55.009, -2.762\nE: 55.005, -2.75\nS: 55.001, -2.765\nW: 55.004, -2.777","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_G","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":428,"contract_id":"AR7-LIH-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"AGR SOLAR 3 LIMITED","counterparty_registration_no":"12295197","counterparty_address":"Fourth Floor, Burlington Building, 19 Heddon Street, London, W1B 4BG, United Kingdom","project_name":"Little Hale","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.894063Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"52.94050000","longitude":"-0.25625000","coordinates":"N: 52.946, -0.256\nE: 52.939, -0.247\nS: 52.936, -0.257\nW: 52.941, -0.265","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":429,"contract_id":"AR7-PRG-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PRIORY GENERATION LIMITED","counterparty_registration_no":"16449284","counterparty_address":"Fourth Floor Burlington Building, 19 Heddon Street, London, W1B 4BG, United Kingdom","project_name":"Priory Generation","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.907814Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"34.56","current_installed_capacity":"34.56","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"51.94350000","longitude":"-0.22425000","coordinates":"N: 51.947, -0.226\nE: 51.941, -0.214\nS: 51.941, -0.228\nW: 51.945, -0.229","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":493,"contract_id":"AR7-BRB-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GSI BRECKS LIMITED","counterparty_registration_no":"13635072","counterparty_address":"5th Floor, Exchange Station, Tithebarn Street, Liverpool, L2 2QP, United Kingdom","project_name":"Brecks Solar farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.936633Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"34.50","current_installed_capacity":"34.50","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.28825000","longitude":"-0.96475000","coordinates":"N: 53.29, -0.972\nE: 53.288, -0.957\nS: 53.285, -0.958\nW: 53.29, -0.972","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":494,"contract_id":"AR7-LHS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GSC LARK HILL LIMITED","counterparty_registration_no":"14391532","counterparty_address":"5th Floor, Exchange Station, Tithebarn Street, Liverpool, L2 2QP, United Kingdom","project_name":"Lark Hill Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.949278Z","start_date":null,"expected_start_date":"2028-06-01","termination_date":null,"target_commissioning_date":"2028-06-01","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-02-28","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.62350000","longitude":"0.72725000","coordinates":"N: 51.63, 0.731\nE: 51.624, 0.734\nS: 51.617, 0.726\nW: 51.623, 0.718","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":495,"contract_id":"AR7-STH-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GSC STRAWS HADLEY LIMITED","counterparty_registration_no":"14392402","counterparty_address":"5th Floor, Exchange Station, Tithebarn Street, Liverpool, L2 2QP, United Kingdom","project_name":"Straws Hadley Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.961064Z","start_date":null,"expected_start_date":"2028-06-01","termination_date":null,"target_commissioning_date":"2028-06-01","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-02-28","initial_installed_capacity":"39.50","current_installed_capacity":"39.50","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.85150000","longitude":"-0.74150000","coordinates":"N: 51.856, -0.735\nE: 51.856, -0.735\nS: 51.844, -0.746\nW: 51.85, -0.75","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":541,"contract_id":"AR7-BRI-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK SOLAR AND STORAGE LIMITED","counterparty_registration_no":"14539260","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5  6PB, United Kingdom","project_name":"Brinsea","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.972942Z","start_date":null,"expected_start_date":"2028-10-31","termination_date":null,"target_commissioning_date":"2028-10-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.34950000","longitude":"-2.82425000","coordinates":"N: 51.367, -2.819\nE: 51.353, -2.8\nS: 51.334, -2.832\nW: 51.344, -2.846","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":543,"contract_id":"AR7-HON-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK SOLAR AND STORAGE LIMITED","counterparty_registration_no":"14539260","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5  6PB, United Kingdom","project_name":"Honeyhall","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.985535Z","start_date":null,"expected_start_date":"2028-10-31","termination_date":null,"target_commissioning_date":"2028-10-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.34775000","longitude":"-2.79850000","coordinates":"N: 51.355, -2.792\nE: 51.349, -2.788\nS: 51.34, -2.805\nW: 51.347, -2.809","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":440,"contract_id":"AR7-WRS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BOULTBEE BROOKS (RENEWABLES WALKFORD MOOR) LTD","counterparty_registration_no":"13271419","counterparty_address":"Formal House, 60 St. Georges Place, Cheltenham, GL50 3PN, United Kingdom","project_name":"Walkford Road Solar, New Milton","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.999880Z","start_date":null,"expected_start_date":"2028-12-31","termination_date":null,"target_commissioning_date":"2028-12-31","target_commissioning_window_start_date":"2028-12-31","long_stop_date":"2030-12-30","initial_installed_capacity":"12.35","current_installed_capacity":"12.35","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.75400000","longitude":"-1.68675000","coordinates":"N: 50.757, -1.69\nE: 50.754, -1.675\nS: 50.752, -1.691\nW: 50.753, -1.691","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":441,"contract_id":"AR7-COU-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BOULTBEE BROOKS (RENEWABLES COUNTY LANE) LTD","counterparty_registration_no":"13271238","counterparty_address":"Formal House, 60 St. Georges Place, Cheltenham, GL50 3PN, United Kingdom","project_name":"County Lane","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.019942Z","start_date":null,"expected_start_date":"2028-10-10","termination_date":null,"target_commissioning_date":"2028-10-10","target_commissioning_window_start_date":"2028-10-10","long_stop_date":"2030-10-09","initial_installed_capacity":"9.00","current_installed_capacity":"9.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.63450000","longitude":"-2.24550000","coordinates":"N: 52.637, -2.253\nE: 52.637, -2.238\nS: 52.632, -2.238\nW: 52.632, -2.253","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":438,"contract_id":"AR7-LAL-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LANGER LANE SOLAR FARM LIMITED","counterparty_registration_no":"13793286","counterparty_address":"Unit 9 Dunchideock, Exeter, EX2 9UA, United Kingdom","project_name":"Langer Lane","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.034398Z","start_date":null,"expected_start_date":"2029-01-01","termination_date":null,"target_commissioning_date":"2028-07-01","target_commissioning_window_start_date":"2028-06-30","long_stop_date":"2030-06-29","initial_installed_capacity":"7.50","current_installed_capacity":"7.50","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.21075000","longitude":"-1.43775000","coordinates":"N: 53.213, -1.439\nE: 53.21, -1.434\nS: 53.209, -1.438\nW: 53.211, -1.44","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":442,"contract_id":"AR7-TID-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BOULTBEE BROOKS (RENEWABLES TIDDIE CROSS) LIMITED","counterparty_registration_no":"15074179","counterparty_address":"Formal House, 60 St. Georges Place, Cheltenham, GL50 3PN, United Kingdom","project_name":"Tiddiecross","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.047634Z","start_date":null,"expected_start_date":"2028-12-09","termination_date":null,"target_commissioning_date":"2028-12-09","target_commissioning_window_start_date":"2028-12-09","long_stop_date":"2030-12-08","initial_installed_capacity":"12.00","current_installed_capacity":"12.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.70725000","longitude":"-2.57100000","coordinates":"N: 52.71, -2.568\nE: 52.707, -2.568\nS: 52.704, -2.571\nW: 52.708, -2.577","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":437,"contract_id":"AR7-SAN-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SANDBAY SOLAR LIMITED","counterparty_registration_no":"13874454","counterparty_address":"Coombe Farm, Roundham, Crewkerne, TA18 8RR, United Kingdom","project_name":"Sandbay","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.060175Z","start_date":null,"expected_start_date":"2029-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-30","long_stop_date":"2031-03-29","initial_installed_capacity":"17.56","current_installed_capacity":"17.56","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.37725000","longitude":"-2.94700000","coordinates":"N: 51.383, -2.945\nE: 51.381, -2.942\nS: 51.371, -2.95\nW: 51.374, -2.951","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":431,"contract_id":"AR7-ESO-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EATON SOCON POWER LIMITED","counterparty_registration_no":"12921574","counterparty_address":"4th Floor, Burlington Building, Heddon Street, London, W1B 4BG, United Kingdom","project_name":"Eaton Socon","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:03.808811Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"33.70","current_installed_capacity":"33.70","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.21900000","longitude":"-0.30850000","coordinates":"N: 52.222, -0.307\nE: 52.221, -0.302\nS: 52.212, -0.308\nW: 52.221, -0.317","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":572,"contract_id":"AR7-LEE-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LETHANS EAST WIND FARM LIMITED","counterparty_registration_no":"8332209","counterparty_address":"Chase House, 4 Mandarin Road, Rainton Bridge Business Park, Houghton-le-Spring, DH4 5RA, United Kingdom","project_name":"Lethans Extension Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.236795Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"70.00","current_installed_capacity":"70.00","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"55.43850000","longitude":"-4.02750000","coordinates":"N: 55.448, -4.039\nE: 55.437, -4.002\nS: 55.43, -4.021\nW: 55.439, -4.048","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":560,"contract_id":"AR7-BBS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BF27 BF SOLAR LIMITED","counterparty_registration_no":"13295254","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"BF27 BF SOLAR LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.248046Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-04-01","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"54.62675000","longitude":"-1.78825000","coordinates":"N: 54.63, -1.783\nE: 54.627, -1.78\nS: 54.623, -1.79\nW: 54.627, -1.8","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":565,"contract_id":"AR7-HLE-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EXAGEN HOLLY LANE LTD","counterparty_registration_no":"13440724","counterparty_address":"2nd Floor, Coachworks, 9-10 Charlotte Mews, London, W1T 4EF, United Kingdom","project_name":"Holly Lane Energy Park","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.260078Z","start_date":null,"expected_start_date":"2028-06-01","termination_date":null,"target_commissioning_date":"2028-06-01","target_commissioning_window_start_date":"2028-06-01","long_stop_date":"2030-05-31","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.37250000","longitude":"-1.65125000","coordinates":"N: 52.378, -1.652\nE: 52.376, -1.644\nS: 52.368, -1.652\nW: 52.368, -1.657","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":569,"contract_id":"AR7-LHI-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WSE LODGE HILL LIMITED","counterparty_registration_no":"12839441","counterparty_address":"Barmoor Farm House, Barmoor, Morpeth, NE61 6LB, United Kingdom","project_name":"Lodge Hill Solar Park","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.275321Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-02-28","long_stop_date":"2030-02-27","initial_installed_capacity":"12.00","current_installed_capacity":"12.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.23025000","longitude":"-2.27550000","coordinates":"N: 51.235, -2.279\nE: 51.228, -2.269\nS: 51.225, -2.274\nW: 51.233, -2.28","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":571,"contract_id":"AR7-EUP-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"Energyfarm UK Pencarreg LLP","counterparty_registration_no":"OC428002","counterparty_address":"4330 Park Approach, Thorpe Park, Leeds, LS15 8GB, United Kingdom","project_name":"Energyfarm UK Pencarreg LLP","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.308017Z","start_date":null,"expected_start_date":"2027-10-31","termination_date":null,"target_commissioning_date":"2027-10-31","target_commissioning_window_start_date":"2027-10-31","long_stop_date":"2029-10-30","initial_installed_capacity":"5.01","current_installed_capacity":"5.01","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"52.04750000","longitude":"-4.08625000","coordinates":"N: 52.053, -4.086\nE: 52.044, -4.084\nS: 52.042, -4.086\nW: 52.051, -4.089","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":562,"contract_id":"AR7-WWS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WALLACE WOOD SOLAR FARM LIMITED","counterparty_registration_no":"12656533","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"WALLACE WOOD SOLAR FARM LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.320498Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"42.00","current_installed_capacity":"42.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.43550000","longitude":"-3.29100000","coordinates":"N: 51.446, -3.297\nE: 51.432, -3.278\nS: 51.431, -3.285\nW: 51.433, -3.304","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":564,"contract_id":"AR7-EUN-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"ENERGYFARM UK NEW RIDES SOLAR LLP","counterparty_registration_no":"OC436172","counterparty_address":"4330 Park Approach, Thorpe Park, Leeds, LS15 8GB, United Kingdom","project_name":"Energyfarm UK New Rides Solar LLP","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.335460Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.39500000","longitude":"0.86250000","coordinates":"N: 51.397, 0.86\nE: 51.396, 0.869\nS: 51.392, 0.862\nW: 51.395, 0.859","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":567,"contract_id":"AR7-GWS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WSE GABRIELSPRING WOOD LIMITED","counterparty_registration_no":"13517507","counterparty_address":"Barmoor Farm House, Barmoor, Morpeth, NE61 6LB, United Kingdom","project_name":"Gabrielspring Wood Solar Park","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.348071Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-03-01","long_stop_date":"2029-02-28","initial_installed_capacity":"17.50","current_installed_capacity":"17.50","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.37425000","longitude":"0.24500000","coordinates":"N: 51.377, 0.243\nE: 51.373, 0.249\nS: 51.372, 0.248\nW: 51.375, 0.24","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":568,"contract_id":"AR7-PEM-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WSE PEMBROKESHIRE LIMITED","counterparty_registration_no":"12839453","counterparty_address":"Barmoor Farm House, Barmoor, Morpeth, NE61 6LB, United Kingdom","project_name":"Pembrokeshire Solar Park","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.359599Z","start_date":null,"expected_start_date":"2027-11-30","termination_date":null,"target_commissioning_date":"2027-09-01","target_commissioning_window_start_date":"2027-08-01","long_stop_date":"2029-07-31","initial_installed_capacity":"9.90","current_installed_capacity":"9.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.69350000","longitude":"-4.87125000","coordinates":"N: 51.696, -4.869\nE: 51.694, -4.867\nS: 51.691, -4.872\nW: 51.693, -4.877","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":408,"contract_id":"LCH-LGH-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"LANGAGE GREEN HYDROGEN LIMITED","counterparty_registration_no":"13573375","counterparty_address":"26, Ellerbeck Court, Stokesley, Middlesbrough, TS9 5PT, United Kingdom","project_name":"LANGAGE GREEN HYDROGEN PROJECT","base_year":2022,"agreement_type":"Green","contract_version":"Version: Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-09-19T01:00:03.638194Z","start_date":null,"expected_start_date":"2028-01-31","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","target_commissioning_window_end_date":"2028-03-31","long_stop_date":"2029-03-31","initial_installed_capacity":"7.01","current_installed_capacity":"7.01","initial_strike_price":"251.85","current_strike_price":"309.27","latitude":null,"longitude":null,"coordinates":"N: 50.389509, -4.0083376\nE: 50.389965, -4.00899\nS: 50.389391, -4.0099786\nW: 50.388934, -4.0093122","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"502478.00","current_sales_cap":"502478.00","production_plant_coordinates":"N: 50.389817, -4.009251\nE: 50.38936, -4.0085986\nS: 50.389027, -4.0091613\nW: 50.389404, -4.0097119","production_plant_longitude":"-4.00918070","production_plant_latitude":"50.38940200","cost_estimate_of_storage_of_hydrogen":"8.48","cost_estimate_of_transport_of_hydrogen":"23.14","polymorphic_ctype":7},{"id":364,"contract_id":"AR6-NSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"NEXTPOWER LOCKS FARM LIMITED","counterparty_registration_no":"12149422","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"Locks Farm Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:04.424097Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"15.00","current_installed_capacity":"13.10","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.94200000","longitude":"-1.22100000","coordinates":"N: 50.947, -1.22\nE: 50.941, -1.211\nS: 50.939, -1.226\nW: 50.941, -1.227","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"1.90","capacity_whole_station":null,"polymorphic_ctype":6},{"id":363,"contract_id":"AR6-NHW-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"NEXTPOWER HORTON WOOD LTD","counterparty_registration_no":"13263367","counterparty_address":"5th Floor North Side 7-10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"NEXTPOWER HORTON WOOD Ltd","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:04.443506Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"60.00","current_installed_capacity":"50.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.38600000","longitude":"0.27050000","coordinates":"N: 51.394, 0.275\nE: 51.383, 0.282\nS: 51.382, 0.264\nW: 51.385, 0.261","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"10.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":586,"contract_id":"AR7-EES-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EAST END SOLAR FARM LIMITED","counterparty_registration_no":"13347611","counterparty_address":"19th Floor 10 Upper Bank Street, Canary Wharf, London, E14 5BF, United Kingdom","project_name":"East End Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.456381Z","start_date":null,"expected_start_date":"2028-02-25","termination_date":null,"target_commissioning_date":"2028-02-25","target_commissioning_window_start_date":"2027-09-01","long_stop_date":"2029-08-31","initial_installed_capacity":"35.00","current_installed_capacity":"35.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.76700000","longitude":"0.05375000","coordinates":"N: 51.775, 0.053\nE: 51.76, 0.059\nS: 51.759, 0.056\nW: 51.774, 0.047","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":574,"contract_id":"AR7-PRA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"ADS NO. 1 LTD","counterparty_registration_no":"13341603","counterparty_address":"Unit 4 Shieling Court, Corby, NN18 9QD, United Kingdom","project_name":"Prentice Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.490444Z","start_date":null,"expected_start_date":"2028-11-01","termination_date":null,"target_commissioning_date":"2028-12-31","target_commissioning_window_start_date":"2028-10-31","long_stop_date":"2030-10-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.68400000","longitude":"0.61850000","coordinates":"N: 51.689, 0.617\nE: 51.68, 0.624\nS: 51.679, 0.619\nW: 51.688, 0.614","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":577,"contract_id":"AR7-RBS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EDEN RB SOLAR LIMITED","counterparty_registration_no":"12725542","counterparty_address":"The Barn Ford Farm, Aldbourne, Marlborough, SN8 2DP, United Kingdom","project_name":"Red Barn Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.502952Z","start_date":null,"expected_start_date":"2027-08-16","termination_date":null,"target_commissioning_date":"2027-08-16","target_commissioning_window_start_date":"2027-08-16","long_stop_date":"2029-08-15","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.50050000","longitude":"-2.13000000","coordinates":"N: 51.509, -2.124\nE: 51.503, -2.12\nS: 51.492, -2.136\nW: 51.498, -2.14","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":578,"contract_id":"AR7-SHE-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EDEN CF SOLAR LIMITED","counterparty_registration_no":"13137540","counterparty_address":"The Barn Ford Farm, Aldbourne, Marlborough, SN8 2DP, United Kingdom","project_name":"Sheepcote Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.516853Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"13.80","current_installed_capacity":"13.80","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.83525000","longitude":"0.60575000","coordinates":"N: 51.839, 0.606\nE: 51.835, 0.611\nS: 51.829, 0.607\nW: 51.838, 0.599","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":443,"contract_id":"AR7-NHS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NEW HALL SOLAR FARM LIMITED","counterparty_registration_no":"14191222","counterparty_address":"Unit 5e Park Farm, Chichester Road, Arundel, BN18 0AG, United Kingdom","project_name":"New Hall Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.071634Z","start_date":null,"expected_start_date":"2028-05-31","termination_date":null,"target_commissioning_date":"2028-05-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"22.20","current_installed_capacity":"22.20","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.63875000","longitude":"-1.60450000","coordinates":"N: 53.643, -1.606\nE: 53.637, -1.595\nS: 53.636, -1.597\nW: 53.639, -1.62","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":554,"contract_id":"AR7-HIG-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GRUPOTEC SOLAR UK 3 LTD","counterparty_registration_no":"14505395","counterparty_address":"5 Kew Road, Richmond, TW9 2PR, United Kingdom","project_name":"Highfield","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.085392Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2028-12-31","initial_installed_capacity":"13.50","current_installed_capacity":"13.50","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.04325000","longitude":"-0.07275000","coordinates":"N: 52.048, -0.071\nE: 52.044, -0.063\nS: 52.039, -0.078\nW: 52.042, -0.079","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":573,"contract_id":"AR7-SWI-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"Sallachy Wind Limited","counterparty_registration_no":"SC384979","counterparty_address":"The Auction House 2nd Floor, 63a George Street, Edinburgh, EH2 2JG, United Kingdom","project_name":"Sallachy Wind farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-12T01:00:04.828954Z","start_date":null,"expected_start_date":"2030-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"44.10","current_installed_capacity":"44.10","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"58.15975000","longitude":"-4.71375000","coordinates":"N: 58.188, -4.775\nE: 58.136, -4.642\nS: 58.129, -4.66\nW: 58.186, -4.778","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":407,"contract_id":"LCH-GHT-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"GREEN HYDROGEN 3 LIMITED","counterparty_registration_no":"14314761","counterparty_address":"Beaufort Court, Egg Farm Lane, Kings Langley, WD4 8LR, United Kingdom","project_name":"GREEN HYDROGEN 3 PROJECT","base_year":2022,"agreement_type":"Green","contract_version":"Version: Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-08-07T01:00:03.634778Z","start_date":null,"expected_start_date":"2028-01-20","termination_date":null,"target_commissioning_date":"2026-12-20","target_commissioning_window_start_date":"2026-12-01","target_commissioning_window_end_date":"2028-05-31","long_stop_date":"2029-05-31","initial_installed_capacity":"9.00","current_installed_capacity":"9.00","initial_strike_price":"233.67","current_strike_price":"286.95","latitude":null,"longitude":null,"coordinates":"N: 51.447275, 0.338784\nE: 51.446994, 0.340223\nS: 51.446485, 0.340053\nW: 51.446641, 0.33855","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"711000.00","current_sales_cap":"711000.00","production_plant_coordinates":"N: 51.447275, 0.338784\nE: 51.446994, 0.340223\nS: 51.446485, 0.340053\nW: 51.446641, 0.33855","production_plant_longitude":"0.33940250","production_plant_latitude":"51.44684875","cost_estimate_of_storage_of_hydrogen":"15.28","cost_estimate_of_transport_of_hydrogen":"9.22","polymorphic_ctype":7},{"id":325,"contract_id":"AR6-GSS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"NEXTPOWER GREY STREET SOLAR LIMITED","counterparty_registration_no":"11694057","counterparty_address":"5th Floor, North Side 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"Grey Street Solar Ltd (Fiskerton 3)","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-08-11T01:00:03.346329Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2027-07-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"53.24100000","longitude":"-0.43750000","coordinates":"N: 53.247, -0.436\nE: 53.24, -0.426\nS: 53.238, -0.444\nW: 53.239, -0.444","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":485,"contract_id":"AR7-PEW-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PENCLOE WIND ENERGY LIMITED","counterparty_registration_no":"SC398688","counterparty_address":"101 George Street, Edinburgh, EH2 3ES, United Kingdom","project_name":"Pencloe Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-09-08T01:00:05.270484Z","start_date":null,"expected_start_date":"2026-11-29","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2026-04-02","long_stop_date":"2028-04-01","initial_installed_capacity":"72.00","current_installed_capacity":"72.00","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"55.32975000","longitude":"-4.20025000","coordinates":"N: 55.344, -4.191\nE: 55.328, -4.181\nS: 55.322, -4.206\nW: 55.325, -4.223","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":587,"contract_id":"AR7-STA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"STAVELEY SOLAR FARM LIMITED","counterparty_registration_no":"14207931","counterparty_address":"19th Floor, 10 Upper Bank Street, Canary Wharf, London, E14 5BF, United Kingdom","project_name":"Staveley Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.549577Z","start_date":null,"expected_start_date":"2027-09-30","termination_date":null,"target_commissioning_date":"2027-09-30","target_commissioning_window_start_date":"2027-06-30","long_stop_date":"2029-06-29","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.60925000","longitude":"-0.64600000","coordinates":"N: 52.615, -0.65\nE: 52.607, -0.633\nS: 52.605, -0.641\nW: 52.61, -0.66","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":576,"contract_id":"AR7-HGS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HGPV LTD","counterparty_registration_no":"SC755316","counterparty_address":"Greenspan, 6 Castle Street, Edinburgh, EH2 3AT, United Kingdom","project_name":"HGPV Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.566324Z","start_date":null,"expected_start_date":"2027-02-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2026-11-01","long_stop_date":"2028-10-31","initial_installed_capacity":"9.20","current_installed_capacity":"9.20","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"57.46100000","longitude":"-1.85825000","coordinates":"N: 57.464, -1.862\nE: 57.462, -1.85\nS: 57.454, -1.859\nW: 57.464, -1.862","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":580,"contract_id":"AR7-FOS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"INFINIS (FORD OAKS) LIMITED","counterparty_registration_no":"14361436","counterparty_address":"First Floor, 500 Pavilion Drive, Northampton Business Park, Northampton, NN4 7YJ, United Kingdom","project_name":"Ford Oaks Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.579911Z","start_date":null,"expected_start_date":"2027-04-02","termination_date":null,"target_commissioning_date":"2027-04-02","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.73075000","longitude":"-3.36300000","coordinates":"N: 50.738, -3.366\nE: 50.731, -3.354\nS: 50.726, -3.357\nW: 50.728, -3.375","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":583,"contract_id":"AR7-CBS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"INFINIS (CALIFORNIA) LIMITED","counterparty_registration_no":"13138555","counterparty_address":"First Floor, 500 Pavilion Drive, Northampton Business Park, Northampton, NN4 7YJ, United Kingdom","project_name":"California Farm Battery Storage and Solar Plant","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.593371Z","start_date":null,"expected_start_date":"2027-12-02","termination_date":null,"target_commissioning_date":"2027-12-02","target_commissioning_window_start_date":"2027-12-01","long_stop_date":"2029-11-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"54.58450000","longitude":"-1.38250000","coordinates":"N: 54.596, -1.385\nE: 54.587, -1.369\nS: 54.577, -1.386\nW: 54.578, -1.39","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":581,"contract_id":"AR7-BRO-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"INFINIS SOLAR LIMITED","counterparty_registration_no":"9060321","counterparty_address":"First Floor 500 Pavilion Drive, Northampton Business Park, Northampton, NN4 7YJ, United Kingdom","project_name":"Brogborough Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.608920Z","start_date":null,"expected_start_date":"2027-04-02","termination_date":null,"target_commissioning_date":"2027-04-02","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"30.50","current_installed_capacity":"30.50","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.05450000","longitude":"-0.58925000","coordinates":"N: 52.059, -0.587\nE: 52.058, -0.584\nS: 52.046, -0.591\nW: 52.055, -0.595","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":582,"contract_id":"AR7-OAS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"INFINIS (OAKLANDS) LIMITED","counterparty_registration_no":"12774308","counterparty_address":"First Floor, 500 Pavilion Drive, Northampton Business Park, Northampton, NN4 7YJ, United Kingdom","project_name":"Oaklands Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.621616Z","start_date":null,"expected_start_date":"2027-04-02","termination_date":null,"target_commissioning_date":"2027-04-02","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.44800000","longitude":"-3.33075000","coordinates":"N: 51.454, -3.321\nE: 51.45, -3.314\nS: 51.442, -3.341\nW: 51.446, -3.347","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":584,"contract_id":"AR7-PCP-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"INFINIS (GOWERTON) LIMITED","counterparty_registration_no":"14362934","counterparty_address":"First Floor, 500 Pavilion Drive, Northampton Business Park, Northampton, NN4 7YJ, United Kingdom","project_name":"Parc Caenewydd PV & BESS","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.634352Z","start_date":null,"expected_start_date":"2027-12-02","termination_date":null,"target_commissioning_date":"2027-12-02","target_commissioning_window_start_date":"2027-12-01","long_stop_date":"2029-11-30","initial_installed_capacity":"44.00","current_installed_capacity":"44.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.65450000","longitude":"-4.02100000","coordinates":"N: 51.658, -4.027\nE: 51.653, -4.008\nS: 51.651, -4.016\nW: 51.656, -4.033","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":591,"contract_id":"AR7-WYE-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EEB52 LIMITED","counterparty_registration_no":"12562161","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Wyndham Estate","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.722168Z","start_date":null,"expected_start_date":"2028-08-01","termination_date":null,"target_commissioning_date":"2028-08-01","target_commissioning_window_start_date":"2028-08-01","long_stop_date":"2030-07-31","initial_installed_capacity":"21.05","current_installed_capacity":"21.05","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.16525000","longitude":"-3.34975000","coordinates":"N: 51.172, -3.346\nE: 51.165, -3.344\nS: 51.16, -3.351\nW: 51.164, -3.358","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":592,"contract_id":"AR7-GUE-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EEB42 LIMITED","counterparty_registration_no":"12168655","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Guisborough Estate","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.739969Z","start_date":null,"expected_start_date":"2029-01-01","termination_date":null,"target_commissioning_date":"2029-01-01","target_commissioning_window_start_date":"2029-01-01","long_stop_date":"2030-12-31","initial_installed_capacity":"39.60","current_installed_capacity":"39.60","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"54.55150000","longitude":"-1.07825000","coordinates":"N: 54.558, -1.068\nE: 54.558, -1.062\nS: 54.544, -1.088\nW: 54.546, -1.095","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":593,"contract_id":"AR7-SUN-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EEB48 LIMITED","counterparty_registration_no":"12168688","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Sunderlandwick Solar PV Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.756925Z","start_date":null,"expected_start_date":"2029-03-01","termination_date":null,"target_commissioning_date":"2029-03-01","target_commissioning_window_start_date":"2029-03-01","long_stop_date":"2031-02-28","initial_installed_capacity":"35.00","current_installed_capacity":"35.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.98275000","longitude":"-0.44100000","coordinates":"N: 53.993, -0.44\nE: 53.976, -0.434\nS: 53.972, -0.444\nW: 53.99, -0.446","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":596,"contract_id":"AR7-FPA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EEB67 LIMITED","counterparty_registration_no":"13207807","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Fernishaw Farm PV and Energy Storage Facility","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.776043Z","start_date":null,"expected_start_date":"2028-12-01","termination_date":null,"target_commissioning_date":"2028-12-01","target_commissioning_window_start_date":"2028-12-01","long_stop_date":"2030-11-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"55.81025000","longitude":"-3.87600000","coordinates":"N: 55.823, -3.871\nE: 55.805, -3.871\nS: 55.805, -3.871\nW: 55.808, -3.891","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":597,"contract_id":"AR7-DPB-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EEB63 LIMITED","counterparty_registration_no":"13207802","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Deptford Farm PV & Battery","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.789807Z","start_date":null,"expected_start_date":"2029-02-01","termination_date":null,"target_commissioning_date":"2029-02-01","target_commissioning_window_start_date":"2029-02-01","long_stop_date":"2031-01-31","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.95225000","longitude":"-4.00500000","coordinates":"N: 50.954, -4\nE: 50.954, -4\nS: 50.948, -4.008\nW: 50.953, -4.012","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":340,"contract_id":"AR6-ICA-010","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"INCH CAPE OFFSHORE LIMITED","counterparty_registration_no":"SC373173","counterparty_address":"Ground Floor, New Clarendon, 114-116 George Street, Edinburgh, EH2 4LH, United Kingdom","project_name":"Inch Cape A","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-31T01:00:04.991476Z","start_date":null,"expected_start_date":"2027-07-31","termination_date":null,"target_commissioning_date":"2027-12-31","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2030-04-01","initial_installed_capacity":"177.41","current_installed_capacity":"177.41","initial_strike_price":"54.23","current_strike_price":"80.61","latitude":"56.47150000","longitude":"-2.16000000","coordinates":"N: 56.553, -2.167\nE: 56.413, -2.098\nS: 56.442, -2.133\nW: 56.478, -2.242","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":246,"contract_id":"AR4-MEY-510","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"MeyGen PLC","counterparty_registration_no":"SC347501","counterparty_address":"26 Dublin Street, Edinburgh, EH3 6NN, United Kingdom","project_name":"MeyGen Phase 2","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.735708Z","start_date":null,"expected_start_date":"2031-06-30","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","long_stop_date":"2032-12-12","initial_installed_capacity":"28.00","current_installed_capacity":"28.00","initial_strike_price":"178.54","current_strike_price":"260.01","latitude":"58.65925000","longitude":"-3.13100000","coordinates":"N: 58.662, -3.14\nE: 58.661, -3.11\nS: 58.655, -3.132\nW: 58.659, -3.142","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":610,"contract_id":"AR7-TOH-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"AR TOOT HILL LTD","counterparty_registration_no":"13463761","counterparty_address":"Unit 4 Shieling Court, Corby, NN18 9QD, United Kingdom","project_name":"Toot Hill Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.932762Z","start_date":null,"expected_start_date":"2027-07-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.68750000","longitude":"0.18150000","coordinates":"N: 51.69, 0.181\nE: 51.687, 0.185\nS: 51.684, 0.182\nW: 51.689, 0.178","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":451,"contract_id":"AR7-CBO-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"AURA POWER SOLAR UK 1 LTD","counterparty_registration_no":"11941920","counterparty_address":"30 Queen Square, Penthouse Office, Bristol, BS1 4ND, United Kingdom","project_name":"Copper Bottom Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.138168Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.19125000","longitude":"-5.32450000","coordinates":"N: 50.195, -5.321\nE: 50.194, -5.316\nS: 50.186, -5.325\nW: 50.19, -5.336","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":452,"contract_id":"AR7-MBS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"CELAENO SOLAR LTD","counterparty_registration_no":"13033184","counterparty_address":"30 Queen Square, Penthouse Office, Bristol, BS1 4ND, United Kingdom","project_name":"Moreton Brook Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.172999Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.81750000","longitude":"-1.95025000","coordinates":"N: 52.824, -1.945\nE: 52.819, -1.942\nS: 52.812, -1.955\nW: 52.815, -1.959","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":447,"contract_id":"AR7-HSN-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BOULTBEE BROOKS (RENEWABLES HIGHGATE) LTD","counterparty_registration_no":"13271423","counterparty_address":"Formal House, 60 St. Georges Place, Cheltenham, GL50 3PN, United Kingdom","project_name":"Highgate Solar Farm, Normanby By Spital","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.202391Z","start_date":null,"expected_start_date":"2028-10-31","termination_date":null,"target_commissioning_date":"2028-10-31","target_commissioning_window_start_date":"2028-10-31","long_stop_date":"2030-10-30","initial_installed_capacity":"8.00","current_installed_capacity":"8.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.38100000","longitude":"-0.46975000","coordinates":"N: 53.383, -0.469\nE: 53.381, -0.458\nS: 53.379, -0.473\nW: 53.381, -0.479","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":448,"contract_id":"AR7-ROH-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BOULTBEE BROOKS (RENEWABLES ROWLEY HILL) LIMITED","counterparty_registration_no":"13564619","counterparty_address":"Formal House, 60 St. Georges Place, Cheltenham, GL50 3PN, United Kingdom","project_name":"Rowley Hill","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.214914Z","start_date":null,"expected_start_date":"2028-10-30","termination_date":null,"target_commissioning_date":"2028-10-30","target_commissioning_window_start_date":"2028-10-30","long_stop_date":"2030-10-29","initial_installed_capacity":"16.00","current_installed_capacity":"16.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.06100000","longitude":"0.46375000","coordinates":"N: 52.066, 0.459\nE: 52.062, 0.471\nS: 52.055, 0.466\nW: 52.061, 0.459","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":445,"contract_id":"AR7-OHS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"OLD HALL ENERGY CENTRE LIMITED","counterparty_registration_no":"12290012","counterparty_address":"Millhouse 32-38 East Street, Rochford, Essex, SS4 1DB, United Kingdom","project_name":"Old Hall Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.230196Z","start_date":null,"expected_start_date":"2028-09-01","termination_date":null,"target_commissioning_date":"2028-09-01","target_commissioning_window_start_date":"2028-06-01","long_stop_date":"2030-05-31","initial_installed_capacity":"17.91","current_installed_capacity":"17.91","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.77600000","longitude":"-1.01250000","coordinates":"N: 52.782, -1.014\nE: 52.773, -1.004\nS: 52.772, -1.005\nW: 52.777, -1.027","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":446,"contract_id":"AR7-MAN-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"MANOR FARM ENERGY CENTRE LIMITED","counterparty_registration_no":"12945774","counterparty_address":"Millhouse 32-38 East Street, Rochford, Essex, SS4 1DB, United Kingdom","project_name":"Manor Farm Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.246139Z","start_date":null,"expected_start_date":"2028-09-01","termination_date":null,"target_commissioning_date":"2028-09-01","target_commissioning_window_start_date":"2028-06-01","long_stop_date":"2030-05-31","initial_installed_capacity":"23.88","current_installed_capacity":"23.88","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.62525000","longitude":"-1.43575000","coordinates":"N: 51.634, -1.434\nE: 51.624, -1.423\nS: 51.62, -1.439\nW: 51.623, -1.447","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":449,"contract_id":"AR7-CHU-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"CHURCH FARM ENERGY CENTRE LIMITED","counterparty_registration_no":"12009898","counterparty_address":"Millhouse 32-38 East Street, Rochford, Essex, SS4 1DB, United Kingdom","project_name":"Church Farm Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.265769Z","start_date":null,"expected_start_date":"2028-10-01","termination_date":null,"target_commissioning_date":"2028-10-01","target_commissioning_window_start_date":"2028-07-01","long_stop_date":"2030-06-30","initial_installed_capacity":"49.65","current_installed_capacity":"49.65","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.85100000","longitude":"-1.25475000","coordinates":"N: 52.855, -1.249\nE: 52.852, -1.244\nS: 52.846, -1.263\nW: 52.851, -1.263","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":536,"contract_id":"AR7-GSP-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"OAKLEY SOLAR LIMITED","counterparty_registration_no":"14147398","counterparty_address":"Endurance Estates Unit 1 The Press, Station Road, Foxton, CB22 6SA, United Kingdom","project_name":"Garendon Solar Plant","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.280629Z","start_date":null,"expected_start_date":"2028-10-31","termination_date":null,"target_commissioning_date":"2028-10-31","target_commissioning_window_start_date":"2028-10-31","long_stop_date":"2030-10-30","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.79350000","longitude":"-1.27650000","coordinates":"N: 52.801, -1.271\nE: 52.798, -1.265\nS: 52.784, -1.281\nW: 52.791, -1.289","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":455,"contract_id":"AR7-BLH-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BLYTHE HOUSE SOLAR FARM LIMITED","counterparty_registration_no":"13081275","counterparty_address":"6th Floor, Capital Tower, 91 Waterloo Road, London, SE1 8RT, United Kingdom","project_name":"Blythe House Solar Farm Limited","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.294597Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"45.30","current_installed_capacity":"45.30","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.94200000","longitude":"-2.01025000","coordinates":"N: 52.949, -2.016\nE: 52.941, -1.998\nS: 52.933, -2.005\nW: 52.945, -2.022","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":454,"contract_id":"AR7-CIS-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"Caerphilly County Borough Council","counterparty_registration_no":"","counterparty_address":"Ty Penallta, Tredomen Business Park, Ystrad Mynach, Hengoed, CF82 7PG, United Kingdom","project_name":"Cwm Ifor Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.319329Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"51.59975000","longitude":"-3.25575000","coordinates":"N: 51.603, -3.258\nE: 51.601, -3.247\nS: 51.595, -3.256\nW: 51.6, -3.262","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":456,"contract_id":"AR7-WGS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HARMONY WG SOLAR LIMITED","counterparty_registration_no":"14230714","counterparty_address":"10 St James Business Park, Grimbald Crag Court, Knaresborough, HG5 8QB, United Kingdom","project_name":"Wormald Green Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.351439Z","start_date":null,"expected_start_date":"2027-07-02","termination_date":null,"target_commissioning_date":"2027-07-01","target_commissioning_window_start_date":"2027-07-01","long_stop_date":"2029-06-30","initial_installed_capacity":"43.00","current_installed_capacity":"43.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"54.07875000","longitude":"-1.51750000","coordinates":"N: 54.088, -1.516\nE: 54.078, -1.507\nS: 54.074, -1.523\nW: 54.075, -1.524","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":235,"initial_installed_capacity_estimate_reactor1":"1639.8","initial_installed_capacity_estimate_reactor2":"1639.8","combined_initial_installed_capacity_estimate":"3279.6","contract_id":"NUC-HPC-198","allocation_round":"Bespoke","scheme":"CfD","counterparty_name":"NNB Generation Company (HPC) Limited","counterparty_registration_no":"06937084","counterparty_address":"Building 1000, Park Avenue, Aztec West Business Park, Almondsbury, Bristol, BS32 4SQ, United Kingdom","project_name":"Hinkley Point C","base_year":2012,"agreement_type":"Bespoke","contract_version":"Bespoke","comment":"Regarding the Generator’s Expected Start Dates, the baseline schedule for Reactor 1 is 1 June 2030 and for Reactor 2 is 1 June 2031. These dates reflect the Generators current best assessment and remain within the previously communicated risk window for Commercial Operation. For context, in a press release issued on 23 January 2024, EDF stated that ‘given the complexity of the project, an unfavourable scenario could lead to Unit 1 being operational in 2031.","updated_at":"2026-04-01T01:00:06.894064Z","start_date":null,"expected_start_date":null,"termination_date":null,"target_commissioning_date":"2025-05-01","target_commissioning_window_start_date":"2025-05-01","long_stop_date":null,"initial_installed_capacity":"3279.60","current_installed_capacity":"3287.16","initial_strike_price":"89.50","current_strike_price":"130.79","latitude":"51.20695000","longitude":"-3.13636000","coordinates":"N: 51.20695, -3.13636\nE: 51.20695, -3.13636\nS: 51.20695, -3.13636\nW: 51.20695, -3.13636","technology_type":"Nuclear","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":444,"contract_id":"AR7-PSA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PERWINNES SOLAR AND BATTERY STORAGE LIMITED","counterparty_registration_no":"14402739","counterparty_address":"3rd Floor, St George's House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"PERWINNES SOLAR AND BATTERY STORAGE LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-12T01:00:05.036106Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"45.00","current_installed_capacity":"45.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"57.21125000","longitude":"-2.13650000","coordinates":"N: 57.218, -2.129\nE: 57.214, -2.119\nS: 57.206, -2.145\nW: 57.207, -2.153","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":457,"contract_id":"AR7-OMS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HARMONY OM LIMITED","counterparty_registration_no":"10688290","counterparty_address":"10 St James Business Park, Grimbald Crag Court, Knaresborough, HG5 8QB, United Kingdom","project_name":"Old Malton Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-17T01:00:04.569669Z","start_date":null,"expected_start_date":"2028-10-02","termination_date":null,"target_commissioning_date":"2028-10-01","target_commissioning_window_start_date":"2028-10-01","long_stop_date":"2030-09-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"54.15675000","longitude":"-0.78950000","coordinates":"N: 54.162, -0.787\nE: 54.157, -0.784\nS: 54.153, -0.79\nW: 54.155, -0.797","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":450,"contract_id":"AR7-MAL-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HAEDUS SOLAR LIMITED","counterparty_registration_no":"13663837","counterparty_address":"30 Queen Square, Bristol, BS1 4ND, United Kingdom","project_name":"Marsh Lane Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-20T01:00:05.773304Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.35925000","longitude":"1.07725000","coordinates":"N: 52.364, 1.083\nE: 52.36, 1.083\nS: 52.355, 1.074\nW: 52.358, 1.069","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":458,"contract_id":"AR7-CMA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"AMP GM005 LIMITED","counterparty_registration_no":"8301949","counterparty_address":"24 Savile Row, London, W1S 2ES, United Kingdom","project_name":"Caldecote Manor Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:04.209378Z","start_date":null,"expected_start_date":"2028-03-01","termination_date":null,"target_commissioning_date":"2028-03-01","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-02-28","initial_installed_capacity":"18.20","current_installed_capacity":"18.20","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.20300000","longitude":"-0.22000000","coordinates":"N: 52.206, -0.224\nE: 52.204, -0.214\nS: 52.198, -0.216\nW: 52.204, -0.226","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":453,"contract_id":"AR7-TRI-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"TRINLAYMIRE NET ZERO SOLAR LIMITED","counterparty_registration_no":"13872267","counterparty_address":"14b, Tower 42, 25 Old Broad Street, London, EC2N 1HN, United Kingdom","project_name":"Trinlaymire","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-07-11T01:00:04.922884Z","start_date":null,"expected_start_date":"2029-03-30","termination_date":null,"target_commissioning_date":"2029-03-30","target_commissioning_window_start_date":"2029-03-30","long_stop_date":"2031-03-29","initial_installed_capacity":"29.90","current_installed_capacity":"29.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"55.96650000","longitude":"-3.47400000","coordinates":"N: 55.973, -3.393\nE: 55.963, -3.494\nS: 55.961, -3.494\nW: 55.969, -3.515","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":615,"contract_id":"AR7-DEW-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"DRUMDUFF EXTENSION LTD","counterparty_registration_no":"SC504174","counterparty_address":"The E-Centre, Cooperage Way, Alloa, FK10 3LP, United Kingdom","project_name":"Drumduff Extension Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.946007Z","start_date":null,"expected_start_date":"2028-06-29","termination_date":null,"target_commissioning_date":"2028-06-29","target_commissioning_window_start_date":"2027-06-30","long_stop_date":"2029-06-29","initial_installed_capacity":"13.05","current_installed_capacity":"13.05","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"55.90050000","longitude":"-3.77625000","coordinates":"N: 55.904, -3.78\nE: 55.903, -3.766\nS: 55.894, -3.772\nW: 55.901, -3.787","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":609,"contract_id":"AR7-FLE-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"CSE23 LIMITED","counterparty_registration_no":"10824252","counterparty_address":"Shell Centre, York Road, London, SE1 7NA, United Kingdom","project_name":"Fleet Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-10-16T01:00:06.664965Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2027-10-01","long_stop_date":"2030-09-30","initial_installed_capacity":"47.50","current_installed_capacity":"47.50","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"51.24600000","longitude":"-0.96275000","coordinates":"N: 51.253, -0.962\nE: 51.243, -0.952\nS: 51.241, -0.967\nW: 51.247, -0.97","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":611,"contract_id":"AR7-PAD-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"Cenin Renewables Limited","counterparty_registration_no":"7598482","counterparty_address":"The Research Centre, Parc Stormy, Stormydown, Bridgend, CF33 4RS, United Kingdom","project_name":"Parc Dyffryn","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:04.995112Z","start_date":null,"expected_start_date":"2029-09-29","termination_date":null,"target_commissioning_date":"2028-09-30","target_commissioning_window_start_date":"2028-09-30","long_stop_date":"2030-09-29","initial_installed_capacity":"49.95","current_installed_capacity":"49.95","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.45400000","longitude":"-3.29625000","coordinates":"N: 51.463, -3.297\nE: 51.457, -3.284\nS: 51.448, -3.302\nW: 51.448, -3.302","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":612,"contract_id":"AR7-UKM-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PACE FIRE ENERGY LIMITED","counterparty_registration_no":"12397146","counterparty_address":"C/O External Services Limited, Central House 20 Central Avenue, St Andrews Business Park, Norwich, NR7 0HR, United Kingdom","project_name":"UKZ015 Mallows","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.009080Z","start_date":null,"expected_start_date":"2027-10-29","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.04850000","longitude":"0.02400000","coordinates":"N: 53.051, 0.027\nE: 53.048, 0.028\nS: 53.045, 0.021\nW: 53.05, 0.02","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":465,"contract_id":"AR7-GLW-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GLENDYE WIND FARM LIMITED","counterparty_registration_no":"9171944","counterparty_address":"22-24 King Street, Maidenhead, SL6 1EF, United Kingdom","project_name":"Glendye Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.390216Z","start_date":null,"expected_start_date":"2030-03-29","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-30","long_stop_date":"2031-03-29","initial_installed_capacity":"124.80","current_installed_capacity":"124.80","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"56.91375000","longitude":"-2.65600000","coordinates":"N: 56.936, -2.666\nE: 56.905, -2.618\nS: 56.887, -2.641\nW: 56.927, -2.699","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":461,"contract_id":"AR7-WBU-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WEST BURTON SOLAR PROJECT LIMITED","counterparty_registration_no":"13049324","counterparty_address":"Unit 25.7 Coda Studios 189 Munster Road, London, SW6 6AW, United Kingdom","project_name":"West Burton Solar Project - AR7 - Site 2","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.402569Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"182.60","current_installed_capacity":"182.60","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"53.28525000","longitude":"-0.66125000","coordinates":"N: 53.296, -0.672\nE: 53.277, -0.638\nS: 53.276, -0.645\nW: 53.292, -0.69","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":462,"contract_id":"AR7-WBS-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WEST BURTON SOLAR PROJECT LIMITED","counterparty_registration_no":"13049324","counterparty_address":"Unit 25.7 Coda Studios 189 Munster Road, London, SW6 6AW, United Kingdom","project_name":"West Burton Solar Project - AR7 - Site 3","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.413313Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"207.30","current_installed_capacity":"207.30","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"53.31550000","longitude":"-0.71800000","coordinates":"N: 53.327, -0.732\nE: 53.319, -0.693\nS: 53.299, -0.712\nW: 53.317, -0.735","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":463,"contract_id":"AR7-WEB-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WEST BURTON SOLAR PROJECT LIMITED","counterparty_registration_no":"13049324","counterparty_address":"Unit 25.7 Coda Studios 189 Munster Road, London, SW6 6AW, United Kingdom","project_name":"West Burton Solar Project - AR7 - Site 1","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.424393Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"90.10","current_installed_capacity":"90.10","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"53.29600000","longitude":"-0.62750000","coordinates":"N: 53.302, -0.631\nE: 53.292, -0.619\nS: 53.29, -0.624\nW: 53.3, -0.636","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":475,"contract_id":"AR7-RSO-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"ROTHERHAM SOLAR 1 LTD","counterparty_registration_no":"13254676","counterparty_address":"5th Floor North Side 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"Rotherham solar 1 Ltd","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.506285Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"37.00","current_installed_capacity":"37.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.43850000","longitude":"-1.22350000","coordinates":"N: 53.442, -1.218\nE: 53.438, -1.214\nS: 53.435, -1.223\nW: 53.439, -1.239","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":480,"contract_id":"AR7-GWT-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK ONSHORE WIND LIMITED","counterparty_registration_no":"3758407","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Golticlay Wind Farm 2","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.520856Z","start_date":null,"expected_start_date":"2028-05-01","termination_date":null,"target_commissioning_date":"2028-05-01","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"13.20","current_installed_capacity":"13.20","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"58.34750000","longitude":"-3.34450000","coordinates":"N: 58.354, -3.355\nE: 58.344, -3.331\nS: 58.342, -3.334\nW: 58.35, -3.358","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":481,"contract_id":"AR7-CLG-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK ONSHORE WIND LIMITED","counterparty_registration_no":"3758407","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Clachaig Glen","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.531282Z","start_date":null,"expected_start_date":"2028-04-03","termination_date":null,"target_commissioning_date":"2028-04-03","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"52.80","current_installed_capacity":"52.80","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"55.61875000","longitude":"-5.61325000","coordinates":"N: 55.635, -5.582\nE: 55.63, -5.581\nS: 55.598, -5.629\nW: 55.612, -5.661","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":477,"contract_id":"AR7-SPW-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GREENTECH INVEST UK (6) LIMITED","counterparty_registration_no":"14956758","counterparty_address":"Challenge House Sherwood Drive, Bletchley, Milton Keynes, MK3 6DP, United Kingdom","project_name":"Spencers Wood","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.540949Z","start_date":null,"expected_start_date":"2028-06-14","termination_date":null,"target_commissioning_date":"2027-12-15","target_commissioning_window_start_date":"2027-06-15","long_stop_date":"2029-06-14","initial_installed_capacity":"19.00","current_installed_capacity":"19.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.38675000","longitude":"-0.96625000","coordinates":"N: 51.39, -0.964\nE: 51.388, -0.959\nS: 51.384, -0.97\nW: 51.385, -0.972","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":474,"contract_id":"AR7-RAA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 27 LIMITED","counterparty_registration_no":"12433982","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Raspberry","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.550481Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.37600000","longitude":"0.71125000","coordinates":"N: 51.386, 0.721\nE: 51.384, 0.722\nS: 51.362, 0.712\nW: 51.372, 0.69","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":476,"contract_id":"AR7-HAG-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HANNINGFIELD GREEN LIMITED","counterparty_registration_no":"14103885","counterparty_address":"C/O Redfern Legal Llp 7 Henrietta Street, Covent Garden, London, WC2E 8PS, United Kingdom","project_name":"HANNINGFIELD GREEN LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.560964Z","start_date":null,"expected_start_date":"2027-07-01","termination_date":null,"target_commissioning_date":"2027-07-01","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2028-12-31","initial_installed_capacity":"36.70","current_installed_capacity":"36.70","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.67625000","longitude":"0.53725000","coordinates":"N: 51.681, 0.54\nE: 51.673, 0.542\nS: 51.672, 0.539\nW: 51.679, 0.528","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":614,"contract_id":"AR7-WBW-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WHITELAW BRAE WINDFARM LIMITED","counterparty_registration_no":"SC456527","counterparty_address":"8 Albany Street, Edinburgh, EH1 3QB, United Kingdom","project_name":"Whitelaw Brae Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-13T01:00:05.586943Z","start_date":null,"expected_start_date":"2027-06-30","termination_date":null,"target_commissioning_date":"2027-06-30","target_commissioning_window_start_date":"2027-06-30","long_stop_date":"2029-06-29","initial_installed_capacity":"60.20","current_installed_capacity":"57.00","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"55.46200000","longitude":"-3.46725000","coordinates":"N: 55.486, -3.471\nE: 55.453, -3.444\nS: 55.444, -3.467\nW: 55.465, -3.487","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"3.20","capacity_whole_station":null,"polymorphic_ctype":6},{"id":617,"contract_id":"AR7-GLA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EDF ENERGY RENEWABLES LIMITED","counterparty_registration_no":"6456689","counterparty_address":"Alexander House 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland, DH4 5RA, United Kingdom","project_name":"Glassthorpe Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.062942Z","start_date":null,"expected_start_date":"2027-09-30","termination_date":null,"target_commissioning_date":"2027-09-30","target_commissioning_window_start_date":"2027-09-30","long_stop_date":"2029-09-29","initial_installed_capacity":"41.00","current_installed_capacity":"41.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.24000000","longitude":"-1.03500000","coordinates":"N: 52.248, -1.032\nE: 52.239, -1.027\nS: 52.231, -1.03\nW: 52.242, -1.051","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":618,"contract_id":"AR7-CRS-710","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EDF ENERGY RENEWABLES LIMITED","counterparty_registration_no":"6456689","counterparty_address":"Alexander House 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland, DH4 5RA, United Kingdom","project_name":"Cressing Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.075146Z","start_date":null,"expected_start_date":"2027-08-30","termination_date":null,"target_commissioning_date":"2027-07-31","target_commissioning_window_start_date":"2027-04-30","long_stop_date":"2029-04-29","initial_installed_capacity":"24.90","current_installed_capacity":"24.90","initial_strike_price":"65.23","current_strike_price":"69.41","latitude":"51.86675000","longitude":"0.59025000","coordinates":"N: 51.871, 0.599\nE: 51.869, 0.605\nS: 51.863, 0.579\nW: 51.864, 0.578","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":619,"contract_id":"AR7-SWA-604","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"FE SWINLEES WIND LIMITED","counterparty_registration_no":"13788393","counterparty_address":"The Goods Shed, Jubilee Way, Faversham, ME13 8GD, United Kingdom","project_name":"Swinlees Wind Farm","base_year":2024,"agreement_type":"Private Network","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.085738Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"25.56","current_installed_capacity":"25.56","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"55.74375000","longitude":"-4.73900000","coordinates":"N: 55.752, -4.739\nE: 55.743, -4.734\nS: 55.737, -4.737\nW: 55.743, -4.746","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":204,"contract_id":"AR5-BSW-600","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BEN SCA WIND FARM LIMITED","counterparty_registration_no":"SC587934","counterparty_address":"Office 202 Vento Ludens, One Lochrin Square, 92-94, Fountainbridge, Edinburgh, Scotland, Edinburgh, EH3 9QA, United Kingdom","project_name":"Ben Sca Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-09-02T01:00:06.259191Z","start_date":null,"expected_start_date":"2030-01-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2030-01-01","initial_installed_capacity":"40.80","current_installed_capacity":"40.80","initial_strike_price":"52.29","current_strike_price":"77.19","latitude":"57.44975000","longitude":"-6.44300000","coordinates":"N: 57.471, -6.466\nE: 57.445, -6.419\nS: 57.437, -6.419\nW: 57.446, -6.468","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":253,"contract_id":"AR4-ORB-504","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"ORBITAL PROJECTS 4 LIMITED","counterparty_registration_no":"SC717031","counterparty_address":"Innovation Centre - Orkney Hatston Pier Road, Crowness Business Park, Kirkwall, KW15 1ZL, United Kingdom","project_name":"Orbital Marine Eday 2","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-09-08T01:00:06.095806Z","start_date":null,"expected_start_date":"2030-08-14","termination_date":null,"target_commissioning_date":"2027-03-16","target_commissioning_window_start_date":"2027-03-01","long_stop_date":"2031-08-30","initial_installed_capacity":"4.80","current_installed_capacity":"4.80","initial_strike_price":"178.54","current_strike_price":"263.56","latitude":"59.14775000","longitude":"-2.81025000","coordinates":"N: 59.166, -2.81\nE: 59.139, -2.783\nS: 59.126, -2.801\nW: 59.16, -2.847","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":479,"contract_id":"AR7-MOL-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SPRING DEV 08 LIMITED","counterparty_registration_no":"12515754","counterparty_address":"Leytonstone House, 3 Hanbury Drive, London, E11 1GA, United Kingdom","project_name":"Mopes Lane Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.581632Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"5.30","current_installed_capacity":"5.30","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.60275000","longitude":"-1.87275000","coordinates":"N: 51.605, -1.873\nE: 51.603, -1.868\nS: 51.6, -1.872\nW: 51.603, -1.878","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":491,"contract_id":"AR7-LOA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LOWER FARM SOLAR AND BATTERY STORAGE LIMITED","counterparty_registration_no":"14403801","counterparty_address":"c/o Uniper UK Limited, Compton House 2300 The Crescent, Birmingham Business Park, Birmingham, B37 7YE, United Kingdom","project_name":"Lower Farm Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.619559Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"49.00","current_installed_capacity":"49.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.83950000","longitude":"-1.95900000","coordinates":"N: 52.844, -1.958\nE: 52.842, -1.949\nS: 52.835, -1.96\nW: 52.837, -1.969","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":488,"contract_id":"AR7-BRF-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GREENTECH INVEST UK (7) LIMITED","counterparty_registration_no":"14956973","counterparty_address":"Challenge House Sherwood Drive, Bletchley, Milton Keynes, MK3 6DP, United Kingdom","project_name":"Brownside","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.630985Z","start_date":null,"expected_start_date":"2028-10-30","termination_date":null,"target_commissioning_date":"2028-10-30","target_commissioning_window_start_date":"2028-04-30","long_stop_date":"2030-04-29","initial_installed_capacity":"35.20","current_installed_capacity":"35.20","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"57.57600000","longitude":"-2.55100000","coordinates":"N: 57.581, -2.549\nE: 57.574, -2.543\nS: 57.571, -2.547\nW: 57.578, -2.565","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":104,"contract_id":"AR5-LAD-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"GREENTECH INVEST UK (1) LIMITED","counterparty_registration_no":"12972352","counterparty_address":"Challenge House, Sherwood Drive, Bletchley, Milton Keynes, MK3 6DP, United Kingdom","project_name":"Land at Dawley Road (New Works)","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"LCCC Contract Management has estimated the expected start date for this project","updated_at":"2026-05-20T01:00:04.772446Z","start_date":null,"expected_start_date":"2028-03-03","termination_date":null,"target_commissioning_date":"2026-03-02","target_commissioning_window_start_date":"2025-01-02","long_stop_date":"2027-03-03","initial_installed_capacity":"21.00","current_installed_capacity":"21.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.68200000","longitude":"-2.50100000","coordinates":"N: 52.687, -2.498\nE: 52.687, -2.498\nS: 52.677, -2.502\nW: 52.677, -2.506","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":478,"contract_id":"AR7-BUA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BURCOT SOLAR FARM LIMITED","counterparty_registration_no":"13526643","counterparty_address":"6th Floor 25 Farringdon Street, London, EC4A 4AB, United Kingdom","project_name":"Burcot","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-22T01:00:05.470526Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-04-01","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.66650000","longitude":"-1.19900000","coordinates":"N: 51.672, -1.197\nE: 51.669, -1.191\nS: 51.662, -1.199\nW: 51.663, -1.209","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":492,"contract_id":"AR7-TOS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"TOTMONSLOW SOLAR LTD","counterparty_registration_no":"13941461","counterparty_address":"Compton House 2300 The Crescent, Birmingham Business Park, Birmingham, B37 7YE, United Kingdom","project_name":"Totmonslow Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-10-21T01:00:03.632975Z","start_date":null,"expected_start_date":"2026-12-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2026-04-02","long_stop_date":"2028-04-01","initial_installed_capacity":"17.59","current_installed_capacity":"17.59","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.94900000","longitude":"-2.00750000","coordinates":"N: 52.951, -2.011\nE: 52.949, -1.999\nS: 52.945, -2.007\nW: 52.951, -2.013","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":620,"contract_id":"AR7-UAT-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PACE POGO ENERGY LIMITED","counterparty_registration_no":"12645960","counterparty_address":"C/O External Services Limited, Central House 20 Central Avenue, St Andrews Business Park, Norwich, NR7 0HR, United Kingdom","project_name":"UKZ139 Apple Tree","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-16T01:00:04.132835Z","start_date":null,"expected_start_date":"2027-10-29","termination_date":null,"target_commissioning_date":"2027-04-30","target_commissioning_window_start_date":"2027-04-30","long_stop_date":"2029-04-29","initial_installed_capacity":"27.00","current_installed_capacity":"27.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.37275000","longitude":"1.47400000","coordinates":"N: 52.376, 1.472\nE: 52.373, 1.486\nS: 52.369, 1.473\nW: 52.373, 1.465","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":616,"contract_id":"AR7-FFS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"FIELD FORM SOLAR LTD","counterparty_registration_no":"13975844","counterparty_address":"Uk House, 5th Floor, 164-182 Oxford Street, London, W1D 1NN, United Kingdom","project_name":"Field Form Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:04.427818Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-10-01","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-30","initial_installed_capacity":"5.01","current_installed_capacity":"5.01","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.58625000","longitude":"-1.62500000","coordinates":"N: 52.588, -1.628\nE: 52.586, -1.62\nS: 52.585, -1.625\nW: 52.586, -1.627","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":171,"contract_id":"INV-LYN-001","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"EP Lynemouth Power Limited","counterparty_registration_no":"07866585","counterparty_address":"Lynemouth Power Limited, Epsilon Windmill Hill Business, Park Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Lynemouth Power Station","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:07.047545Z","start_date":"2018-06-23","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2015-12-31","target_commissioning_window_start_date":"2015-12-31","long_stop_date":"2019-05-02","initial_installed_capacity":"420.00","current_installed_capacity":"406.79","initial_strike_price":"105.00","current_strike_price":"153.72","latitude":"55.20500000","longitude":"-1.52425000","coordinates":"N: 55.209, -1.531\nE: 55.205, -1.515\nS: 55.202, -1.524\nW: 55.204, -1.527","technology_type":"Biomass Conversion","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":"420.0000","polymorphic_ctype":6},{"id":497,"contract_id":"AR7-COB-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"WSE COX'S BROOK LIMITED","counterparty_registration_no":"13471493","counterparty_address":"2 Crossways Business Centre Bicester Road, Kingswood, Aylesbury, HP18 0RA, United Kingdom","project_name":"Cox's Brook Solar Park","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.643347Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-06-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"16.00","current_installed_capacity":"16.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.89625000","longitude":"-2.23250000","coordinates":"N: 51.901, -2.229\nE: 51.9, -2.227\nS: 51.89, -2.233\nW: 51.894, -2.241","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":502,"contract_id":"AR7-BRD-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PURE LIFE ENERGY SPV LIMITED","counterparty_registration_no":"14116040","counterparty_address":"2 Crossways Business Centre, Bicester Road, Kingswood, Aylesbury, HP18 0RA, United Kingdom","project_name":"Brookthorpe Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.653782Z","start_date":null,"expected_start_date":"2027-10-01","termination_date":null,"target_commissioning_date":"2027-10-01","target_commissioning_window_start_date":"2027-10-01","long_stop_date":"2029-09-30","initial_installed_capacity":"8.00","current_installed_capacity":"8.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.81675000","longitude":"-2.23625000","coordinates":"N: 51.819, -2.236\nE: 51.817, -2.231\nS: 51.814, -2.236\nW: 51.817, -2.242","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":508,"contract_id":"AR7-HAL-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PD412WAR LTD","counterparty_registration_no":"13247660","counterparty_address":"One Bank Street, Canary Wharf, London, E14 4SG, United Kingdom","project_name":"Hampton Lodge Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-10-20T01:00:05.033124Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-04-01","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"16.00","current_installed_capacity":"16.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.25975000","longitude":"-1.62700000","coordinates":"N: 52.264, -1.629\nE: 52.262, -1.619\nS: 52.255, -1.629\nW: 52.258, -1.631","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":486,"contract_id":"AR7-BEB-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SONNEDIX BENGROVE LIMITED","counterparty_registration_no":"13726284","counterparty_address":"90 Union Street, London, SE1 0NW, United Kingdom","project_name":"Bengrove Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.677735Z","start_date":null,"expected_start_date":"2029-02-05","termination_date":null,"target_commissioning_date":"2029-03-05","target_commissioning_window_start_date":"2029-02-05","long_stop_date":"2031-02-04","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.90150000","longitude":"-2.23675000","coordinates":"N: 51.904, -2.237\nE: 51.901, -2.231\nS: 51.899, -2.238\nW: 51.902, -2.241","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":496,"contract_id":"AR7-PIL-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PILMOOR SOLAR LIMITED","counterparty_registration_no":"13737400","counterparty_address":"2 Crossways Business Centre, Bicester Road, Kingswood, Aylesbury, HP18 0RA, United Kingdom","project_name":"Pilmoor Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.691806Z","start_date":null,"expected_start_date":"2027-08-02","termination_date":null,"target_commissioning_date":"2027-08-02","target_commissioning_window_start_date":"2027-08-02","long_stop_date":"2029-08-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"54.13875000","longitude":"-1.29250000","coordinates":"N: 54.145, -1.296\nE: 54.136, -1.275\nS: 54.132, -1.295\nW: 54.142, -1.304","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":484,"contract_id":"AR7-BAA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BARNACRE SOLAR LIMITED","counterparty_registration_no":"15093757","counterparty_address":"6th Floor 2 London Wall Place, London, EC2Y 5AU, United Kingdom","project_name":"Barnacre Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.702232Z","start_date":null,"expected_start_date":"2027-07-30","termination_date":null,"target_commissioning_date":"2027-10-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"23.00","current_installed_capacity":"23.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.89275000","longitude":"-2.75250000","coordinates":"N: 53.899, -2.752\nE: 53.89, -2.749\nS: 53.888, -2.749\nW: 53.894, -2.76","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_G","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":9,"contract_id":"AR5-CIW-600","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"CAMSTER II WIND FARM LIMITED","counterparty_registration_no":"12971079","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Camster II Wind Farm Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:07.129207Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-04-01","initial_installed_capacity":"36.00","current_installed_capacity":"36.00","initial_strike_price":"52.29","current_strike_price":"77.19","latitude":"58.41725000","longitude":"-3.22625000","coordinates":"N: 58.432, -3.247\nE: 58.419, -3.163\nS: 58.399, -3.243\nW: 58.419, -3.252","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":487,"contract_id":"AR7-HWT-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HIGHWITH SOLAR LIMITED","counterparty_registration_no":"13043263","counterparty_address":"22 Grosvenor Gardens, London, SW1W 0DH, United Kingdom","project_name":"HW25","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.713040Z","start_date":null,"expected_start_date":"2028-05-31","termination_date":null,"target_commissioning_date":"2028-05-31","target_commissioning_window_start_date":"2028-05-01","long_stop_date":"2030-04-30","initial_installed_capacity":"32.00","current_installed_capacity":"32.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.70825000","longitude":"-4.50825000","coordinates":"N: 50.714, -4.507\nE: 50.706, -4.501\nS: 50.703, -4.503\nW: 50.71, -4.522","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":498,"contract_id":"AR7-LOF-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LOCH FERGUS SOLAR LTD","counterparty_registration_no":"SC734927","counterparty_address":"C/O Locogen Limited, 4, West Silvermills Lane, Edinburgh, EH3 5BD, United Kingdom","project_name":"Loch Fergus Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.722435Z","start_date":null,"expected_start_date":"2029-03-15","termination_date":null,"target_commissioning_date":"2029-03-15","target_commissioning_window_start_date":"2029-01-01","long_stop_date":"2030-12-31","initial_installed_capacity":"45.00","current_installed_capacity":"45.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"55.43175000","longitude":"-4.54350000","coordinates":"N: 55.44, -4.538\nE: 55.437, -4.532\nS: 55.42, -4.551\nW: 55.43, -4.553","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":499,"contract_id":"AR7-TOR-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"THREE OAKS RENEWABLE ENERGY PARK LTD","counterparty_registration_no":"14089818","counterparty_address":"Noahs Ark Market Street, Charlbury, Chipping Norton, OX7 3PL, United Kingdom","project_name":"Three Oaks Renewable Energy Park","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.731934Z","start_date":null,"expected_start_date":"2028-09-30","termination_date":null,"target_commissioning_date":"2028-09-30","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"39.00","current_installed_capacity":"39.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"54.07100000","longitude":"-0.28850000","coordinates":"N: 54.075, -0.285\nE: 54.068, -0.281\nS: 54.068, -0.289\nW: 54.073, -0.299","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":500,"contract_id":"AR7-SOR-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SUNNY OAKS RENEWABLE ENERGY PARK LTD","counterparty_registration_no":"13881797","counterparty_address":"Noahs Ark Market Street, Charlbury, Chipping Norton, OX7 3PL, United Kingdom","project_name":"Sunny Oaks Renewable Energy Park","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.741401Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-02-28","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.71475000","longitude":"-1.25200000","coordinates":"N: 50.72, -1.253\nE: 50.715, -1.249\nS: 50.709, -1.249\nW: 50.715, -1.257","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":503,"contract_id":"AR7-COA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SKYE GREEN SOLAR FARM LIMITED","counterparty_registration_no":"15025365","counterparty_address":"2 Crossways Business Centre, Bicester Road, Kingswood, Aylesbury, HP18 0RA, United Kingdom","project_name":"Colchester Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.752342Z","start_date":null,"expected_start_date":"2028-05-01","termination_date":null,"target_commissioning_date":"2028-05-01","target_commissioning_window_start_date":"2028-05-01","long_stop_date":"2030-04-30","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.86050000","longitude":"0.71475000","coordinates":"N: 51.864, 0.718\nE: 51.862, 0.721\nS: 51.857, 0.711\nW: 51.859, 0.709","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":505,"contract_id":"AR7-CST-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"CARLTON SOLAR FARM LIMITED","counterparty_registration_no":"12580347","counterparty_address":"Unit 25.7 Coda Studios 189 Munster Road, London, SW6 6AW, United Kingdom","project_name":"Carlton Solar Farm 2","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.774614Z","start_date":null,"expected_start_date":"2027-08-25","termination_date":null,"target_commissioning_date":"2027-08-25","target_commissioning_window_start_date":"2027-07-05","long_stop_date":"2029-07-04","initial_installed_capacity":"12.40","current_installed_capacity":"12.40","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.71900000","longitude":"-0.99125000","coordinates":"N: 53.727, -0.994\nE: 53.714, -0.981\nS: 53.714, -0.981\nW: 53.721, -1.009","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":504,"contract_id":"AR7-GRP-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PACE NANO ENERGY LIMITED","counterparty_registration_no":"12645785","counterparty_address":"2 Crossways Business Centre, Bicester Road, Kingswood, Aylesbury, HP18 0RA, United Kingdom","project_name":"Grange Farm Palgrave","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.784599Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-05-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"12.00","current_installed_capacity":"12.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.36100000","longitude":"1.08975000","coordinates":"N: 52.366, 1.084\nE: 52.359, 1.1\nS: 52.354, 1.092\nW: 52.365, 1.083","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":506,"contract_id":"AR7-FIS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"FIRSFIELD SOLAR LIMITED","counterparty_registration_no":"13984725","counterparty_address":"Magma House 16 Davy Court, Castle Mound Way, Rugby, CV23 0UZ, United Kingdom","project_name":"Firsfield Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.807363Z","start_date":null,"expected_start_date":"2028-07-01","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"46.99","current_installed_capacity":"46.99","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.35075000","longitude":"0.85450000","coordinates":"N: 52.36, 0.857\nE: 52.347, 0.861\nS: 52.345, 0.853\nW: 52.351, 0.847","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":507,"contract_id":"AR7-TWS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"TWYFORD SOLAR LIMITED","counterparty_registration_no":"15093891","counterparty_address":"6th Floor 2 London Wall Place, London, EC2Y 5AU, United Kingdom","project_name":"Twyford Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.817027Z","start_date":null,"expected_start_date":"2027-10-01","termination_date":null,"target_commissioning_date":"2027-10-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.68800000","longitude":"-0.94250000","coordinates":"N: 52.69, -0.943\nE: 52.689, -0.939\nS: 52.685, -0.943\nW: 52.688, -0.945","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":510,"contract_id":"AR7-HAS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HATHERTON SOLAR LIMITED","counterparty_registration_no":"15666219","counterparty_address":"6th Floor 2 London Wall Place, London, EC2Y 5AU, United Kingdom","project_name":"Hatherton Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.837171Z","start_date":null,"expected_start_date":"2027-12-01","termination_date":null,"target_commissioning_date":"2027-12-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"12.00","current_installed_capacity":"12.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"53.01750000","longitude":"-2.46225000","coordinates":"N: 53.02, -2.464\nE: 53.017, -2.458\nS: 53.015, -2.461\nW: 53.018, -2.466","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":117,"contract_id":"AAA-REG-175","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"REG Netley Solar Ltd","counterparty_registration_no":"09060353","counterparty_address":"REG Netley Solar Ltd, Edgeborough House, Upper Edgeborough Road, Guildford, GU1 2BJ, United Kingdom","project_name":"Netley Landfill Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2025-09-11T01:00:02.744703Z","start_date":null,"expected_start_date":null,"termination_date":"2016-03-21","target_commissioning_date":"2016-12-31","target_commissioning_window_start_date":"2016-10-01","long_stop_date":"2017-12-31","initial_installed_capacity":"12.00","current_installed_capacity":"12.00","initial_strike_price":"79.23","current_strike_price":"83.22","latitude":"50.89100000","longitude":"-1.34275000","coordinates":"N: 50.892, -1.342\nE: 50.89, -1.336\nS: 50.883, -1.344\nW: 50.899, -1.349","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":137,"contract_id":"AAA-GEN-188","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Gent Fairhead & Co. Ltd","counterparty_registration_no":"02392879","counterparty_address":"Court of Noke, Pembrigde, Leominster, HR6 9HW, United Kingdom","project_name":"Wren Power and Pulp","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2025-09-11T01:00:02.648121Z","start_date":null,"expected_start_date":null,"termination_date":"2020-03-12","target_commissioning_date":"2018-05-30","target_commissioning_window_start_date":"2018-03-31","long_stop_date":"2020-03-30","initial_installed_capacity":"49.75","current_installed_capacity":"49.75","initial_strike_price":"80.00","current_strike_price":"91.60","latitude":"51.85250000","longitude":"0.64575000","coordinates":"N: 51.855, 0.645\nE: 51.853, 0.649\nS: 51.851, 0.646\nW: 51.851, 0.643","technology_type":"Energy from Waste","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":true,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":272,"contract_id":"AR6-AWI-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"Thrive Renewables (Abergorki) Limited","counterparty_registration_no":"08589219","counterparty_address":"Deanery Road, Avon, Bristol, BS1 5AS, United Kingdom","project_name":"Abergorki Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"The Expected Start Date is under review by LCCC","updated_at":"2026-09-03T01:00:05.787988Z","start_date":null,"expected_start_date":"2027-12-01","termination_date":null,"target_commissioning_date":"2026-06-30","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2028-12-01","initial_installed_capacity":"9.60","current_installed_capacity":"9.60","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"51.67700000","longitude":"-3.49575000","coordinates":"N: 51.691, -3.501\nE: 51.677, -3.484\nS: 51.663, -3.483\nW: 51.677, -3.515","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":511,"contract_id":"AR7-SIO-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SIX OAKS RENEWABLE ENERGY PARK LTD","counterparty_registration_no":"13850306","counterparty_address":"Noahs Ark Market Street, Charlbury, Chipping Norton, OX7 3PL, United Kingdom","project_name":"Six Oaks Renewable Energy Park","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:06.847534Z","start_date":null,"expected_start_date":"2028-05-31","termination_date":null,"target_commissioning_date":"2028-05-31","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"35.00","current_installed_capacity":"35.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.20850000","longitude":"0.29925000","coordinates":"N: 52.213, 0.297\nE: 52.207, 0.305\nS: 52.202, 0.304\nW: 52.212, 0.291","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":300,"contract_id":"AR6-CLS-710","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CLUMP FARM SOLAR LIMITED","counterparty_registration_no":"12368142","counterparty_address":"Ground Floor Ibis House, Ibis Court, Warrington, WA1 1RL, United Kingdom","project_name":"CLUMP FARM SOLAR LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-23T01:00:04.342381Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"50.07","current_strike_price":"74.43","latitude":"52.59350000","longitude":"-1.28475000","coordinates":"N: 52.599, -1.286\nE: 52.594, -1.267\nS: 52.585, -1.285\nW: 52.596, -1.301","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":520,"contract_id":"AR7-CYP-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"CYP SOLAR LIMITED","counterparty_registration_no":"12357995","counterparty_address":"22 Grosvenor Gardens, London, SW1W 0DH, United Kingdom","project_name":"CYP25","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.017384Z","start_date":null,"expected_start_date":"2028-04-30","termination_date":null,"target_commissioning_date":"2028-04-30","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.69500000","longitude":"-3.85725000","coordinates":"N: 51.7, -3.849\nE: 51.698, -3.845\nS: 51.691, -3.865\nW: 51.691, -3.87","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":274,"contract_id":"AR6-AIT-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"TOTLEYWELLS NET ZERO LIMITED","counterparty_registration_no":"13298992","counterparty_address":"14b, Tower 42, 25 Old Broad Street, London, EC2N 1HN, United Kingdom","project_name":"Aithrie","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.028046Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"29.90","current_installed_capacity":"29.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"55.97875000","longitude":"-3.45000000","coordinates":"N: 55.983, -3.444\nE: 55.981, -3.443\nS: 55.973, -3.452\nW: 55.978, -3.461","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":278,"contract_id":"AR6-BED-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BEDWORTH SOLAR LIMITED","counterparty_registration_no":"13094502","counterparty_address":"3rd Floor, St George's House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"Bedworth Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.048040Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"16.00","current_installed_capacity":"16.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.48475000","longitude":"-1.52375000","coordinates":"N: 52.489, -1.526\nE: 52.484, -1.517\nS: 52.482, -1.521\nW: 52.484, -1.531","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":351,"contract_id":"AR6-LSE-710","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"LONGFIELD SOLAR ENERGY FARM LIMITED","counterparty_registration_no":"11618210","counterparty_address":"Alexander House 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland, DH4 5RA, United Kingdom","project_name":"Longfield Solar Energy Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.082302Z","start_date":null,"expected_start_date":"2028-06-30","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-04-14","initial_installed_capacity":"299.00","current_installed_capacity":"299.00","initial_strike_price":"50.07","current_strike_price":"74.43","latitude":"51.78450000","longitude":"0.52750000","coordinates":"N: 51.812, 0.533\nE: 51.779, 0.567\nS: 51.76, 0.52\nW: 51.787, 0.49","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":275,"contract_id":"AR6-ALW-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"Alaska Wind Farm Limited Liability Partnership","counterparty_registration_no":"OC435766","counterparty_address":"16 West Borough, Wimborne, BH21 1NG, United Kingdom","project_name":"Alaska Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.106551Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"8.00","current_installed_capacity":"8.00","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"50.69150000","longitude":"-2.18225000","coordinates":"N: 50.701, -2.189\nE: 50.692, -2.168\nS: 50.683, -2.18\nW: 50.69, -2.192","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":519,"contract_id":"AR7-HFT-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORTHAMPTONSHIRE SOLAR 1 LIMITED","counterparty_registration_no":"12838980","counterparty_address":"22 Grosvenor Gardens, London, SW1W 0DH, United Kingdom","project_name":"HF25","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.116400Z","start_date":null,"expected_start_date":"2027-12-31","termination_date":null,"target_commissioning_date":"2027-12-31","target_commissioning_window_start_date":"2027-12-01","long_stop_date":"2029-11-30","initial_installed_capacity":"32.00","current_installed_capacity":"32.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.04725000","longitude":"-2.15900000","coordinates":"N: 52.055, -2.16\nE: 52.045, -2.153\nS: 52.043, -2.158\nW: 52.046, -2.165","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":378,"contract_id":"AR6-RAS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BAHAM SOLAR LTD","counterparty_registration_no":"13033144","counterparty_address":"30 Queen Square, Penthouse Office, Bristol, BS1 4ND, United Kingdom","project_name":"Rayleigh Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.136816Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.58600000","longitude":"0.58100000","coordinates":"N: 51.589, 0.575\nE: 51.587, 0.593\nS: 51.582, 0.583\nW: 51.586, 0.573","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":287,"contract_id":"AR6-BRW-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BROWNHILL WIND FARM LTD","counterparty_registration_no":"13981750","counterparty_address":"35 Westgate, Huddersfield, HD1 1PA, United Kingdom","project_name":"BROWNHILL WIND FARM","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.157490Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-04-01","initial_installed_capacity":"8.40","current_installed_capacity":"8.40","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"55.83950000","longitude":"-3.78320000","coordinates":"N: 55.8414, -3.7892\nE: 55.8397, -3.7749\nS: 55.8357, -3.7792\nW: 55.8412, -3.7895","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":299,"contract_id":"AR6-CLW-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"SSE GENERATION LIMITED","counterparty_registration_no":"02310571","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Cloiche Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.168216Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-11-30","initial_installed_capacity":"130.50","current_installed_capacity":"130.50","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"57.11375000","longitude":"-4.53225000","coordinates":"N: 57.145, -4.643\nE: 57.098, -4.354\nS: 57.068, -4.487\nW: 57.144, -4.645","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":320,"contract_id":"AR6-FRA-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 5 LTD","counterparty_registration_no":"11761429","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5  6PB, United Kingdom","project_name":"Fraddon","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.182019Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.36875000","longitude":"-4.94350000","coordinates":"N: 50.375, -4.94\nE: 50.37, -4.934\nS: 50.365, -4.95\nW: 50.365, -4.95","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":319,"contract_id":"AR6-FGS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EDEN FG SOLAR LIMITED","counterparty_registration_no":"12228710","counterparty_address":"The Barn Ford Farm, Aldbourne, Marlborough, SN8 2DP, United Kingdom","project_name":"Forest Gate Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.192667Z","start_date":null,"expected_start_date":"2027-06-01","termination_date":null,"target_commissioning_date":"2026-06-29","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2028-09-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.44225000","longitude":"-2.07175000","coordinates":"N: 51.447, -2.069\nE: 51.441, -2.064\nS: 51.438, -2.072\nW: 51.443, -2.082","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":303,"contract_id":"AR6-COL-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 20 LTD","counterparty_registration_no":"12140411","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5  6PB, United Kingdom","project_name":"Copse Lodge","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.202710Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"9.98","current_installed_capacity":"9.98","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.06400000","longitude":"-1.19425000","coordinates":"N: 52.072, -1.195\nE: 52.066, -1.185\nS: 52.057, -1.195\nW: 52.061, -1.202","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":10,"contract_id":"AR4-CSF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SPRING DEV 07 LIMITED","counterparty_registration_no":"12515651","counterparty_address":"Leytonstone House, 3 Hanbury Drive, London, E11 1GA, United Kingdom","project_name":"Cawarden Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-06-12T01:00:05.589587Z","start_date":null,"expected_start_date":"2026-12-31","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-12-31","initial_installed_capacity":"47.61","current_installed_capacity":"35.71","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.76275000","longitude":"-1.91125000","coordinates":"N: 52.769, -1.917\nE: 52.758, -1.901\nS: 52.757, -1.902\nW: 52.767, -1.925","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"11.90","capacity_whole_station":null,"polymorphic_ctype":6},{"id":292,"contract_id":"AR6-CAS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CARLTON SOLAR FARM LIMITED","counterparty_registration_no":"12580347","counterparty_address":"Unit 25.7 Coda Studios 189 Munster Road, London, SW6 6AW, United Kingdom","project_name":"Carlton Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-09-19T01:00:04.274887Z","start_date":null,"expected_start_date":"2027-08-01","termination_date":null,"target_commissioning_date":"2026-09-30","target_commissioning_window_start_date":"2026-07-01","long_stop_date":"2028-08-01","initial_installed_capacity":"37.50","current_installed_capacity":"37.50","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"53.71900000","longitude":"-0.99125000","coordinates":"N: 53.727, -0.994\nE: 53.714, -0.981\nS: 53.714, -0.981\nW: 53.721, -1.009","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":59,"contract_id":"AR5-WES-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"EEB32 LIMITED","counterparty_registration_no":"11780129","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Wood End Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2025-09-17T01:00:02.229077Z","start_date":null,"expected_start_date":"2027-11-01","termination_date":"2025-09-16","target_commissioning_date":"2027-11-01","target_commissioning_window_start_date":"2027-10-31","long_stop_date":"2028-01-31","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"47.00","current_strike_price":"67.34","latitude":"51.96800000","longitude":"-0.83150000","coordinates":"N: 51.976, -0.835\nE: 51.965, -0.823\nS: 51.961, -0.829\nW: 51.97, -0.839","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":285,"contract_id":"AR6-BRG-710","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BRAMFORD GREEN LIMITED","counterparty_registration_no":"12516896","counterparty_address":"Ropemaker Place, 28 Ropemaker Street, London, EC2Y 9HD, United Kingdom","project_name":"Bramford Green Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.212332Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2027-02-15","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2028-04-01","initial_installed_capacity":"30.00","current_installed_capacity":"22.50","initial_strike_price":"50.07","current_strike_price":"74.43","latitude":"52.07350000","longitude":"1.04500000","coordinates":"N: 52.077, 1.042\nE: 52.076, 1.049\nS: 52.067, 1.048\nW: 52.074, 1.041","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"7.50","capacity_whole_station":null,"polymorphic_ctype":6},{"id":308,"contract_id":"AR6-CUT-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CUTLERS SOLAR FARM LIMITED","counterparty_registration_no":"12748254","counterparty_address":"5-7 Carlton Gardens, Stirling Square, London, SW1Y 5AD, United Kingdom","project_name":"Cutlers","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.224644Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"19.76","current_installed_capacity":"19.76","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.95550000","longitude":"0.30575000","coordinates":"N: 51.962, 0.303\nE: 51.952, 0.314\nS: 51.949, 0.307\nW: 51.959, 0.299","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":288,"contract_id":"AR6-BRY-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BRYNRHYD SOLAR FARM LIMITED","counterparty_registration_no":"12273218","counterparty_address":"Ibis House Ground Floor Ibis Court, Centre Park, Warrington, WA1 1RL, United Kingdom","project_name":"Brynryhd Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.234930Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.75375000","longitude":"-4.03600000","coordinates":"N: 51.758, -4.03\nE: 51.756, -4.026\nS: 51.749, -4.041\nW: 51.752, -4.047","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":281,"contract_id":"AR6-BEA-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BENTHEAD SOLAR LIMITED","counterparty_registration_no":"SC708803","counterparty_address":"C/O Aukera Uk Limited, 7- 9 North St. David Street, Edinburgh, EH2 1AW, United Kingdom","project_name":"Benthead Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.244952Z","start_date":null,"expected_start_date":"2027-02-14","termination_date":null,"target_commissioning_date":"2027-02-14","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2028-04-01","initial_installed_capacity":"63.00","current_installed_capacity":"63.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"55.68200000","longitude":"-4.64900000","coordinates":"N: 55.691, -4.643\nE: 55.685, -4.63\nS: 55.674, -4.66\nW: 55.678, -4.663","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":322,"contract_id":"AR6-GLS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"GLENNISTON SOLAR PROJECT LTD","counterparty_registration_no":"13301930","counterparty_address":"11a Heath Drive Flat 2 (First Floor), London, NW3 7SN, United Kingdom","project_name":"Glenniston Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.254317Z","start_date":null,"expected_start_date":"2027-04-30","termination_date":null,"target_commissioning_date":"2027-04-30","target_commissioning_window_start_date":"2027-04-30","long_stop_date":"2028-07-30","initial_installed_capacity":"39.00","current_installed_capacity":"39.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"56.11700000","longitude":"-3.26675000","coordinates":"N: 56.124, -3.272\nE: 56.114, -3.252\nS: 56.108, -3.261\nW: 56.122, -3.282","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":304,"contract_id":"AR6-CTW-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CORRIEGARTH 2 WIND FARM LIMITED","counterparty_registration_no":"12207006","counterparty_address":"22 Chancery Lane, London, WC2A 1LS, United Kingdom","project_name":"Corriegarth 2 Wind Farm Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.295204Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"66.19","current_installed_capacity":"66.19","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"57.20375000","longitude":"-4.40675000","coordinates":"N: 57.23, -4.471\nE: 57.192, -4.317\nS: 57.166, -4.362\nW: 57.227, -4.477","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":302,"contract_id":"AR6-CCS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"COPSE CLOSE SOLAR FARM LIMITED","counterparty_registration_no":"13490889","counterparty_address":"C/O Evelyn Partners Llp Old Library Chambers, 21 Chipper Lane, Salisbury, SP1 1BG, United Kingdom","project_name":"Copse Close Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.305614Z","start_date":null,"expected_start_date":"2028-12-08","termination_date":null,"target_commissioning_date":"2028-12-08","target_commissioning_window_start_date":"2027-10-03","long_stop_date":"2029-12-08","initial_installed_capacity":"44.00","current_installed_capacity":"44.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.12800000","longitude":"-0.95975000","coordinates":"N: 51.137, -0.954\nE: 51.126, -0.952\nS: 51.123, -0.966\nW: 51.126, -0.967","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":290,"contract_id":"AR6-CAL-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CALLIE'S SOLAR FARM LIMITED","counterparty_registration_no":"13097915","counterparty_address":"19th Floor, 10 Upper Bank Street, Canary Wharf, London, E145BF, United Kingdom","project_name":"Callies","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.315654Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"36.56","current_installed_capacity":"36.56","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.75950000","longitude":"-0.87850000","coordinates":"N: 51.767, -0.875\nE: 51.763, -0.869\nS: 51.754, -0.885\nW: 51.754, -0.885","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":352,"contract_id":"AR6-LON-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"LONGPASTURE SOLAR FARM LIMITED","counterparty_registration_no":"12952974","counterparty_address":"Units 15 and 16, Diddenham Court, Grazeley, Reading, RG7 1JQ, United Kingdom","project_name":"LONGPASTURE SOLAR FARM LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-11-04T01:00:04.568136Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"54.56050000","longitude":"-1.46225000","coordinates":"N: 54.567, -1.461\nE: 54.556, -1.455\nS: 54.554, -1.459\nW: 54.565, -1.474","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":327,"contract_id":"AR6-HPS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"AURA POWER SOLAR UK 3 LTD","counterparty_registration_no":"11942779","counterparty_address":"30 Queen Square, Penthouse Office, Bristol, BS1 4ND, United Kingdom","project_name":"Hawthorn Pit Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.348390Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"45.00","current_installed_capacity":"45.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"54.80650000","longitude":"-1.40250000","coordinates":"N: 54.812, -1.397\nE: 54.806, -1.395\nS: 54.803, -1.407\nW: 54.805, -1.411","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":329,"contract_id":"AR6-HES-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"LEDWYCHE SOLAR LIMITED","counterparty_registration_no":"SC705559","counterparty_address":"C/O Aukera Uk Limited, 7- 9 North St. David Street, Edinburgh, EH2 1AW, United Kingdom","project_name":"Henley Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.358096Z","start_date":null,"expected_start_date":"2027-02-14","termination_date":null,"target_commissioning_date":"2027-02-14","target_commissioning_window_start_date":"2027-01-01","long_stop_date":"2028-04-01","initial_installed_capacity":"12.00","current_installed_capacity":"12.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.36875000","longitude":"-2.67375000","coordinates":"N: 52.373, -2.669\nE: 52.371, -2.667\nS: 52.364, -2.678\nW: 52.367, -2.681","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":337,"contract_id":"AR6-HOS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"AURA POWER SOLAR UK 2 LTD","counterparty_registration_no":"11942574","counterparty_address":"30 Queen Square, Penthouse Office, Bristol, BS1 4ND, United Kingdom","project_name":"Horton Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.374131Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"50.00","current_installed_capacity":"50.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.78425000","longitude":"-3.35100000","coordinates":"N: 50.791, -3.361\nE: 50.779, -3.338\nS: 50.776, -3.342\nW: 50.791, -3.363","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":311,"contract_id":"AR6-DSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"Luminous Energy (RH) Limited","counterparty_registration_no":"13483920","counterparty_address":"Hartham Park, Hartham Lane, Corsham, SN13 0RP, United Kingdom","project_name":"Duxhurst Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.384279Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"19.49","current_installed_capacity":"19.49","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.19350000","longitude":"-0.20575000","coordinates":"N: 51.198, -0.211\nE: 51.194, -0.197\nS: 51.19, -0.204\nW: 51.192, -0.211","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":310,"contract_id":"AR6-DUS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"DUCKLINGTON SOLAR LIMITED","counterparty_registration_no":"13035477","counterparty_address":"6th Floor, Capital Tower, 91 Waterloo Road, London, SE1 8RT, United Kingdom","project_name":"Ducklington Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.436955Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.76275000","longitude":"-1.49450000","coordinates":"N: 51.767, -1.49\nE: 51.763, -1.485\nS: 51.76, -1.5\nW: 51.761, -1.503","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":317,"contract_id":"AR6-EXE-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"TWO TREE SOLAR FARM LIMITED","counterparty_registration_no":"13827642","counterparty_address":"19th Floor, 10 Upper Bank Street, Canary Wharf, London, E145BF, United Kingdom","project_name":"Exeter","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.472381Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"34.58","current_installed_capacity":"34.58","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.89075000","longitude":"-3.39350000","coordinates":"N: 50.895, -3.393\nE: 50.888, -3.382\nS: 50.886, -3.395\nW: 50.894, -3.404","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":298,"contract_id":"AR6-CLI-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"Clashindarroch II Wind Farm Limited","counterparty_registration_no":"SC825996","counterparty_address":"The Tun Building, 4 Jacksons Entry, Holyrood Road, Midlothian, Edinburgh, EH8 8PJ, United Kingdom","project_name":"Clashindarroch II Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-07-09T01:00:06.353811Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"77.00","current_installed_capacity":"63.00","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"57.40850000","longitude":"-2.89600000","coordinates":"N: 57.453, -2.846\nE: 57.431, -2.844\nS: 57.369, -2.935\nW: 57.381, -2.959","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"14.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":283,"contract_id":"AR6-BSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"LEL BILBO SOLAR LIMITED","counterparty_registration_no":"11296012","counterparty_address":"5 Hanover Square, 5th Floor, London, W1S 1HE, United Kingdom","project_name":"Bilbo Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-08-01T01:00:08.367211Z","start_date":null,"expected_start_date":"2026-11-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2027-07-01","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"57.59100000","longitude":"-1.90400000","coordinates":"N: 57.596, -1.9\nE: 57.593, -1.895\nS: 57.586, -1.908\nW: 57.589, -1.913","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":338,"contract_id":"AR6-HSS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"HESSAY SOLAR LIMITED","counterparty_registration_no":"13691385","counterparty_address":"1 King William Street, London, EC4N 7AF, United Kingdom","project_name":"HSS24","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-08-15T01:00:04.613279Z","start_date":null,"expected_start_date":"2027-07-15","termination_date":null,"target_commissioning_date":"2027-07-15","target_commissioning_window_start_date":"2027-07-01","long_stop_date":"2028-10-01","initial_installed_capacity":"32.00","current_installed_capacity":"32.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"53.96475000","longitude":"-1.19050000","coordinates":"N: 53.971, -1.196\nE: 53.963, -1.181\nS: 53.959, -1.185\nW: 53.966, -1.2","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":316,"contract_id":"AR6-EDW-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"TAMANI LTD","counterparty_registration_no":"SC614492","counterparty_address":"4 Binniehill Road, Cumbernauld, Glasgow, G68 9AJ, United Kingdom","project_name":"Easter Drumclair wind farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-08T01:00:07.551513Z","start_date":"2026-10-07","expected_start_date":"2026-10-07","termination_date":null,"target_commissioning_date":"2026-10-04","target_commissioning_window_start_date":"2026-01-04","long_stop_date":"2028-01-04","initial_installed_capacity":"6.00","current_installed_capacity":"6.00","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"55.92450000","longitude":"-3.81225000","coordinates":"N: 55.927, -3.81\nE: 55.925, -3.808\nS: 55.922, -3.815\nW: 55.924, -3.816","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":8,"contract_id":"AR4-BFS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"BRACKS FARM SOLAR PARK LIMITED","counterparty_registration_no":"09296576","counterparty_address":"7 Devonshire Square, London, EC2M 4YH, United Kingdom","project_name":"Bracks Farm Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-02T01:00:05.510695Z","start_date":"2026-04-01","expected_start_date":"2026-04-01","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.31650000","longitude":"0.32500000","coordinates":"N: 52.321, 0.318\nE: 52.312, 0.333\nS: 52.312, 0.332\nW: 52.321, 0.317","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":330,"contract_id":"AR6-HHS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"HIGHER HAWKERLAND SOLAR LIMITED","counterparty_registration_no":"13378094","counterparty_address":"10 Lower Thames Street, London, England, EC3R 6EN, United Kingdom","project_name":"Higher Hawkerland solar farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.492434Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"13.33","current_installed_capacity":"10.204","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.70250000","longitude":"-3.35900000","coordinates":"N: 50.706, -3.355\nE: 50.702, -3.353\nS: 50.699, -3.36\nW: 50.703, -3.368","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"3.126","capacity_whole_station":null,"polymorphic_ctype":6},{"id":367,"contract_id":"AR6-NRT-710","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"DARLINGTON SOLAR 1 LIMITED","counterparty_registration_no":"13370167","counterparty_address":"111 Park Street, Mayfair, London, W1K 7JF, United Kingdom","project_name":"NRT24","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.509898Z","start_date":null,"expected_start_date":"2028-01-15","termination_date":null,"target_commissioning_date":"2028-01-15","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"40.90","current_installed_capacity":"40.90","initial_strike_price":"50.07","current_strike_price":"74.43","latitude":"54.57625000","longitude":"-1.41675000","coordinates":"N: 54.584, -1.406\nE: 54.584, -1.406\nS: 54.567, -1.426\nW: 54.57, -1.429","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":383,"contract_id":"AR6-SKS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"SKEEBY SOLAR LIMITED","counterparty_registration_no":"13488103","counterparty_address":"The Scalpel, 18th Floor, 52 Lime Street, London, EC3M 7AF, United Kingdom","project_name":"Skeeby Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.520087Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2028-07-01","initial_installed_capacity":"39.00","current_installed_capacity":"39.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"54.41025000","longitude":"-1.68975000","coordinates":"N: 54.415, -1.696\nE: 54.408, -1.675\nS: 54.407, -1.68\nW: 54.411, -1.708","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":522,"contract_id":"AR7-BRA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BRYNWELL FARM SOLAR LIMITED","counterparty_registration_no":"12638409","counterparty_address":"Unit 1 Imperial Court, Exchange Street East, Liverpool, L2 3AB, United Kingdom","project_name":"Brynwell Farm Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.530026Z","start_date":null,"expected_start_date":"2027-09-30","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-03-31","initial_installed_capacity":"15.31","current_installed_capacity":"15.31","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.46600000","longitude":"-3.23450000","coordinates":"N: 51.469, -3.237\nE: 51.464, -3.229\nS: 51.463, -3.233\nW: 51.468, -3.239","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":347,"contract_id":"AR6-LES-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"LEEMING SOLAR FARM LIMITED","counterparty_registration_no":"12679116","counterparty_address":"14b, Tower 42 25 Old Broad Street, London, EC2N 1HN, United Kingdom","project_name":"LEEMING SOLAR FARM LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.539955Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"39.00","current_installed_capacity":"39.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"54.31975000","longitude":"-1.55575000","coordinates":"N: 54.324, -1.559\nE: 54.321, -1.549\nS: 54.314, -1.552\nW: 54.32, -1.563","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":348,"contract_id":"AR6-LDS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EDEN LD SOLAR LIMITED","counterparty_registration_no":"12381845","counterparty_address":"The Barn Ford Farm, Aldbourne, Marlborough, SN8 2DP, United Kingdom","project_name":"Leigh Delamere Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.560166Z","start_date":null,"expected_start_date":"2027-06-01","termination_date":null,"target_commissioning_date":"2026-06-29","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2028-09-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.50425000","longitude":"-1.08475000","coordinates":"N: 51.509, -2.18\nE: 51.506, -2.161\nS: 51.499, -2.182\nW: 51.503, 2.184","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":379,"contract_id":"AR6-ROS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"ADS NO. 3 LTD","counterparty_registration_no":"13341615","counterparty_address":"Unit 4 Shieling Court, Corby, Northamptonshire, NN18 9QD, United Kingdom","project_name":"Rock Farm Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.570224Z","start_date":null,"expected_start_date":"2027-05-01","termination_date":null,"target_commissioning_date":"2027-03-01","target_commissioning_window_start_date":"2027-03-01","long_stop_date":"2028-06-01","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.37325000","longitude":"-2.68375000","coordinates":"N: 52.379, -2.682\nE: 52.375, -2.678\nS: 52.368, -2.683\nW: 52.371, -2.692","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":365,"contract_id":"AR6-NES-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"NEXTPOWER SPV 14 LIMITED","counterparty_registration_no":"12571950","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"NEXTPOWER SPV 14 LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.590391Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"50.00","current_installed_capacity":"42.80","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.64675000","longitude":"-1.39650000","coordinates":"N: 51.651, -1.396\nE: 51.646, -1.385\nS: 51.642, -1.402\nW: 51.648, -1.403","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"7.20","capacity_whole_station":null,"polymorphic_ctype":6},{"id":346,"contract_id":"AR6-LEC-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"OPDENERGY UK 1 LIMITED","counterparty_registration_no":"13029727","counterparty_address":"Grenville Court, Britwell Road, Burnham, SL1 8DF, United Kingdom","project_name":"Leckhampstead Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.611110Z","start_date":null,"expected_start_date":"2027-01-30","termination_date":null,"target_commissioning_date":"2027-01-30","target_commissioning_window_start_date":"2027-01-30","long_stop_date":"2028-04-30","initial_installed_capacity":"17.25","current_installed_capacity":"15.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.03025000","longitude":"-0.91950000","coordinates":"N: 52.034, -0.921\nE: 52.029, -0.914\nS: 52.027, -0.917\nW: 52.031, -0.926","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"2.25","capacity_whole_station":null,"polymorphic_ctype":6},{"id":357,"contract_id":"AR6-MES-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"MEERDYKE SOLAR LIMITED","counterparty_registration_no":"14380857","counterparty_address":"10 Lower Thames Street, London, England, EC3R 6AF, United Kingdom","project_name":"Meerdyke Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.654999Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.66875000","longitude":"0.22275000","coordinates":"N: 52.678, 0.212\nE: 52.663, 0.238\nS: 52.661, 0.232\nW: 52.673, 0.209","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":350,"contract_id":"AR6-LCS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"LITTLE CROW RENEWABLES LIMITED","counterparty_registration_no":"11136483","counterparty_address":"35 And 35a The Maltings Lower Charlton Trading Estate, Shepton Mallet, Somerset, BA4 5QE, United Kingdom","project_name":"Little Crow Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.665684Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"99.90","current_installed_capacity":"99.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"53.57636000","longitude":"-0.57792250","coordinates":"N: 53.58432, -0.57956\nE: 53.58186, -0.56567\nS: 53.56908, -0.57454\nW: 53.57018, -0.59192","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":370,"contract_id":"AR6-OSS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"HARMONY OB LIMITED","counterparty_registration_no":"14231848","counterparty_address":"The Scalpel, 18th Floor, 52 Lime Street, London, EC3M 7AF, United Kingdom","project_name":"Osberton Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.675961Z","start_date":null,"expected_start_date":"2026-12-01","termination_date":null,"target_commissioning_date":"2026-12-01","target_commissioning_window_start_date":"2026-10-01","long_stop_date":"2028-01-01","initial_installed_capacity":"34.00","current_installed_capacity":"34.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"53.31025000","longitude":"-1.08775000","coordinates":"N: 53.314, -1.092\nE: 53.308, -1.082\nS: 53.305, -1.085\nW: 53.314, -1.092","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":393,"contract_id":"AR6-WHS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"FISHBURN SOLAR LIMITED","counterparty_registration_no":"SC705594","counterparty_address":"C/O Aukera Uk Limited, 7- 9 North St. David Street, Edinburgh, EH2 1AW, United Kingdom","project_name":"West House Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.687435Z","start_date":null,"expected_start_date":"2027-08-19","termination_date":null,"target_commissioning_date":"2027-08-19","target_commissioning_window_start_date":"2027-07-01","long_stop_date":"2028-10-01","initial_installed_capacity":"41.40","current_installed_capacity":"41.40","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"54.69200000","longitude":"-1.45250000","coordinates":"N: 54.695, -1.456\nE: 54.694, -1.434\nS: 54.687, -1.459\nW: 54.692, -1.461","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":297,"contract_id":"AR6-CHW-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"ESB ASSET DEVELOPMENT UK LIMITED","counterparty_registration_no":"06925667","counterparty_address":"Fora - Eastcastle Street, 16-19 Eastcastle Street, London, W1W 8DY, United Kingdom","project_name":"Chleansaid Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.700721Z","start_date":null,"expected_start_date":"2028-11-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2027-11-01","long_stop_date":"2029-11-01","initial_installed_capacity":"96.00","current_installed_capacity":"96.00","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"58.12275000","longitude":"-4.35225000","coordinates":"N: 58.14, -4.372\nE: 58.118, -4.325\nS: 58.107, -4.339\nW: 58.126, -4.373","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":344,"contract_id":"AR6-KHW-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"KIRK HILL WIND FARM LIMITED","counterparty_registration_no":"09172034","counterparty_address":"c/o Bruntwood Management Services, Union, Albert Square, Manchester, M2 6LW, United Kingdom","project_name":"Kirk Hill Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-09-09T01:00:05.739148Z","start_date":"2026-09-03","expected_start_date":"2026-09-03","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2025-11-01","long_stop_date":"2027-11-01","initial_installed_capacity":"7.05","current_installed_capacity":"7.05","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"55.30550000","longitude":"-4.73725000","coordinates":"N: 55.308, -4.728\nE: 55.307, -4.727\nS: 55.302, -4.743\nW: 55.305, -4.751","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":381,"contract_id":"AR6-SHP-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"SHEEPWASH CLEAN ENERGY LIMITED","counterparty_registration_no":"13940316","counterparty_address":"19th Floor 22 Bishopsgate, London, EC2N 4BQ, United Kingdom","project_name":"Sheepwash Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-09-11T01:00:05.355451Z","start_date":null,"expected_start_date":"2028-06-11","termination_date":null,"target_commissioning_date":"2027-05-01","target_commissioning_window_start_date":"2027-05-01","long_stop_date":"2029-06-16","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.17400000","longitude":"0.46650000","coordinates":"N: 51.177, 0.462\nE: 51.176, 0.477\nS: 51.167, 0.47\nW: 51.176, 0.457","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":206,"contract_id":"AR5-BEW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SSE GENERATION LIMITED","counterparty_registration_no":"02310571","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Bhlaraidh Extension Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2025-09-11T01:00:03.159788Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":"2025-03-27","target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"100.80","current_installed_capacity":"100.80","initial_strike_price":"52.29","current_strike_price":"75.47","latitude":"57.24525000","longitude":"-4.68925000","coordinates":"N: 57.264, -4.705\nE: 57.248, -4.633\nS: 57.215, -4.686\nW: 57.254, -4.733","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":202,"contract_id":"AR5-AHS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SEVERN TRENT GREEN POWER ATHERSTONE LIMITED","counterparty_registration_no":"12559241","counterparty_address":"The Stables, Radford, Chipping Norton, OX7 4EB, United Kingdom","project_name":"Atherstone Hill Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2025-09-11T01:00:03.250853Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2025-03-26","target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"26.00","current_installed_capacity":"26.00","initial_strike_price":"47.00","current_strike_price":"67.34","latitude":"52.15175000","longitude":"-1.72775000","coordinates":"N: 52.159, -1.73\nE: 52.151, -1.723\nS: 52.147, -1.723\nW: 52.15, -1.735","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":392,"contract_id":"AR6-WEM-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EEB15 LIMITED","counterparty_registration_no":"10789285","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Wemyss Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-12T01:00:07.109030Z","start_date":null,"expected_start_date":"2026-04-01","termination_date":"2026-05-11","target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-03-31","long_stop_date":"2027-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"56.15575000","longitude":"-3.12275000","coordinates":"N: 56.163, -3.123\nE: 56.157, -3.113\nS: 56.146, -3.126\nW: 56.157, -3.129","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":538,"contract_id":"AR7-RHS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RHIGOS SOLAR LIMITED","counterparty_registration_no":"14397097","counterparty_address":"Unit 15-16 Diddenham Court, Lambwood Hill, Grazeley, Reading, RG7 1JQ, United Kingdom","project_name":"Rhigos Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-11-04T01:00:04.788120Z","start_date":null,"expected_start_date":"2030-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"7.60","current_installed_capacity":"7.60","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.73925000","longitude":"-3.54500000","coordinates":"N: 51.742, -3.546\nE: 51.74, -3.541\nS: 51.738, -3.544\nW: 51.737, -3.549","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":70,"contract_id":"AR4-CWF-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"CHIRMORIE WIND FARM LIMITED","counterparty_registration_no":"09171934","counterparty_address":"22-24 King Street, Maidenhead, SL6 1EF, United Kingdom","project_name":"Chirmorie Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.274387Z","start_date":null,"expected_start_date":"2026-03-26","termination_date":"2025-03-21","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2026-09-27","long_stop_date":"2028-09-27","initial_installed_capacity":"81.60","current_installed_capacity":"81.60","initial_strike_price":"42.47","current_strike_price":"54.48","latitude":"55.05225000","longitude":"-4.83050000","coordinates":"N: 55.071, -4.833\nE: 55.057, -4.806\nS: 55.035, -4.831\nW: 55.046, -4.852","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":524,"contract_id":"AR7-ABE-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"FONMON SOLAR FARM LIMITED","counterparty_registration_no":"12951672","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Aberthaw East","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.711402Z","start_date":null,"expected_start_date":"2030-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.39775000","longitude":"-3.36450000","coordinates":"N: 51.401, -3.365\nE: 51.398, -3.355\nS: 51.396, -3.369\nW: 51.396, -3.369","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":523,"contract_id":"AR7-MOU-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"MOUNT FARM SOLAR EXTENSION LIMITED","counterparty_registration_no":"13737315","counterparty_address":"Unit 1 Imperial Court, Exchange Street East, Liverpool, L2 3AB, United Kingdom","project_name":"Mount Farm Solar","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.722255Z","start_date":null,"expected_start_date":"2027-10-31","termination_date":null,"target_commissioning_date":"2027-10-31","target_commissioning_window_start_date":"2027-10-31","long_stop_date":"2029-10-30","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.06000000","longitude":"-1.92600000","coordinates":"N: 52.063, -1.926\nE: 52.061, -1.92\nS: 52.056, -1.925\nW: 52.06, -1.933","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":376,"contract_id":"AR6-PRW-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"PRIESTGILL WIND FARM LIMITED","counterparty_registration_no":"07640919","counterparty_address":"Springfield, Ackenthwaite, Milnthorpe, LA7 7DQ, United Kingdom","project_name":"Priestgill Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.741677Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","long_stop_date":"2029-03-31","initial_installed_capacity":"43.63","current_installed_capacity":"43.63","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"55.51375000","longitude":"-3.66225000","coordinates":"N: 55.53, -3.668\nE: 55.512, -3.641\nS: 55.504, -3.658\nW: 55.509, -3.682","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":377,"contract_id":"AR6-RAF-710","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"RAYLEIGH GREEN LIMITED","counterparty_registration_no":"12517501","counterparty_address":"17th Floor Hylo, 103-105 Bunhill Row, London, EC1Y 8LZ, United Kingdom","project_name":"Rayleigh Fobbing","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.752400Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"74.43","latitude":"51.53725000","longitude":"0.48375000","coordinates":"N: 51.548, 0.481\nE: 51.531, 0.493\nS: 51.529, 0.485\nW: 51.541, 0.476","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":398,"contract_id":"AR6-WOE-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"WORLD'S END FARM SOLAR PARK LIMITED","counterparty_registration_no":"12320285","counterparty_address":"35 And 35a The Maltings Lower Charlton Trading Estate, Shepton Mallet, BA4 5QE, United Kingdom","project_name":"Worlds End Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.763026Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.67553500","longitude":"-2.51557250","coordinates":"N: 51.67935, -2.51079\nE: 51.67009, -2.51594\nS: 51.67906, -2.5099\nW: 51.67364, -2.52566","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":399,"contract_id":"AR6-WSH-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"WSE HARTFORD WOOD LIMITED","counterparty_registration_no":"13517494","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"WSE HARTFORD WOOD LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.782979Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"55.11650000","longitude":"-1.59775000","coordinates":"N: 55.124, -1.593\nE: 55.114, -1.587\nS: 55.112, -1.597\nW: 55.116, -1.614","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":375,"contract_id":"AR6-PHS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"DABIH SOLAR LTD","counterparty_registration_no":"13033257","counterparty_address":"30 Queen Square, Penthouse Office, Bristol, BS1 4ND, United Kingdom","project_name":"Preston Hill Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.803022Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.72875000","longitude":"-2.13525000","coordinates":"N: 52.737, -2.136\nE: 52.725, -2.127\nS: 52.724, -2.132\nW: 52.729, -2.146","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":525,"contract_id":"AR7-BUS-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"EEB44 LIMITED","counterparty_registration_no":"12168691","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Butterhill Solar PV","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.850356Z","start_date":null,"expected_start_date":"2028-11-01","termination_date":null,"target_commissioning_date":"2028-11-01","target_commissioning_window_start_date":"2028-11-01","long_stop_date":"2030-10-31","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.76175000","longitude":"-2.14950000","coordinates":"N: 52.769, -2.148\nE: 52.762, -2.143\nS: 52.756, -2.148\nW: 52.76, -2.159","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":526,"contract_id":"AR7-LOW-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LOGANHEAD WF LIMITED","counterparty_registration_no":"SC453136","counterparty_address":"3rd Floor, Maxim 10, Parklands Avenue, Motherwell, ML1 4WQ, United Kingdom","project_name":"Loganhead Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.860336Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"36.00","current_installed_capacity":"36.00","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"55.16650000","longitude":"-3.08925000","coordinates":"N: 55.179, -3.1\nE: 55.162, -3.062\nS: 55.151, -3.077\nW: 55.174, -3.118","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":527,"contract_id":"AR7-HOW-610","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HOPSRIG WIND FARM LIMITED","counterparty_registration_no":"SC501771","counterparty_address":"3rd Floor, Maxim 10, Parklands Avenue, Motherwell, ML1 4WQ, United Kingdom","project_name":"HOPSRIG WIND FARM LIMITED","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.879869Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"48.00","current_installed_capacity":"48.00","initial_strike_price":"72.24","current_strike_price":"76.87","latitude":"55.18650000","longitude":"-3.13500000","coordinates":"N: 55.197, -3.141\nE: 55.188, -3.11\nS: 55.175, -3.138\nW: 55.186, -3.151","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":389,"contract_id":"AR6-TAS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"TAMWORTH SOLAR LTD","counterparty_registration_no":"14068529","counterparty_address":"Compton House 2300 The Crescent, Birmingham Business Park, Birmingham, B37 7YE, United Kingdom","project_name":"Tamworth Solar LTD","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-06-12T01:00:06.153971Z","start_date":null,"expected_start_date":"2027-02-01","termination_date":null,"target_commissioning_date":"2026-05-31","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2027-07-01","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.64500000","longitude":"-1.64875000","coordinates":"N: 52.649, -1.651\nE: 52.646, -1.637\nS: 52.641, -1.651\nW: 52.644, -1.656","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":280,"contract_id":"AR6-BEN-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"Benbrack Wind Farm Limited","counterparty_registration_no":"12971043","counterparty_address":"C/O Cms Cameron Mckenna Nabarro Olswang Llp Cannon Place, 78 Cannon Street, London, EC4N 6AF, United Kingdom","project_name":"Benbrack Wind Farm - AR6 - A3","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-06-24T01:00:05.788890Z","start_date":"2026-06-19","expected_start_date":"2026-08-31","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2028-04-01","initial_installed_capacity":"13.50","current_installed_capacity":"13.50","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"55.27725000","longitude":"-4.29875000","coordinates":"N: 55.281, -4.3\nE: 55.277, -4.295\nS: 55.274, -4.296\nW: 55.277, -4.304","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":388,"contract_id":"AR6-TAT-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CE TACHER TURBINES LTD","counterparty_registration_no":"13020657","counterparty_address":"80 Strand, London, WC2R0DT, United Kingdom","project_name":"Tacher Turbines","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-29T01:00:06.644367Z","start_date":null,"expected_start_date":"2026-12-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2025-08-31","long_stop_date":"2027-08-31","initial_installed_capacity":"12.90","current_installed_capacity":"12.90","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"58.40675000","longitude":"-3.41675000","coordinates":"N: 58.411, -3.416\nE: 58.406, -3.411\nS: 58.403, -3.421\nW: 58.407, -3.419","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":95,"contract_id":"AR4-HCS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SEVERN TRENT GREEN POWER CAYTON LIMITED","counterparty_registration_no":"11780059","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"High Cayton Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.328138Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2025-03-26","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"45.99","current_strike_price":"65.89","latitude":"54.06625000","longitude":"-1.55250000","coordinates":"N: 54.071, -1.551\nE: 54.066, -1.541\nS: 54.059, -1.556\nW: 54.069, -1.562","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":49,"contract_id":"AR4-SSP-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SPEYSLAW SOLAR LIMITED","counterparty_registration_no":"09370270","counterparty_address":"4th Floor, 1 Tudor street, London, EC4Y 0AH, United Kingdom","project_name":"Speyslaw Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.336059Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"45.99","current_strike_price":"61.51","latitude":"57.68325000","longitude":"-3.20050000","coordinates":"N: 57.686, -3.21\nE: 57.684, -3.191\nS: 57.681, -3.191\nW: 57.682, -3.21","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":40,"contract_id":"AR4-NOR-011","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"NORFOLK BOREAS LIMITED","counterparty_registration_no":"03722058","counterparty_address":"5th Floor 70, St Mary Axe, London, EC3A 8BE, United Kingdom","project_name":"Norfolk Boreas (Phase 1)","base_year":2012,"agreement_type":"Phased","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.367112Z","start_date":null,"expected_start_date":"2028-03-30","termination_date":"2024-02-09","target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"416.00","current_installed_capacity":"416.00","initial_strike_price":"37.35","current_strike_price":"45.37","latitude":"53.02000000","longitude":"2.93125000","coordinates":"N: 53.121, 3.093\nE: 53.053, 3.112\nS: 52.953, 2.76\nW: 52.953, 2.76","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":535,"contract_id":"AR7-PAC-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PARLEY COURT RENEWABLE ENERGY LIMITED","counterparty_registration_no":"13359268","counterparty_address":"15 Diddenham Court Lambwood Hill, Grazeley, Reading, RG7 1JQ, United Kingdom","project_name":"Parley Court","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-11-04T01:00:04.859947Z","start_date":null,"expected_start_date":"2030-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.76900000","longitude":"-1.86550000","coordinates":"N: 50.774, -1.865\nE: 50.773, -1.856\nS: 50.764, -1.868\nW: 50.765, -1.873","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":260,"contract_id":"AR4-RSF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"ROMSEY SOLAR LIMITED","counterparty_registration_no":"09940571","counterparty_address":"2nd Floor, 2 City Place Beehive Ring Road, Gatwick, RH6 0PA, United Kingdom","project_name":"Romsey Solar Farm Phase 2","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"Expected Start Date of 31.12.2025 has been provided by Generator","updated_at":"2026-06-25T01:00:05.627504Z","start_date":"2026-06-22","expected_start_date":"2026-06-22","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"6.48","current_installed_capacity":"6.48","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"50.96425000","longitude":"-1.47925000","coordinates":"N: 50.966, -1.477\nE: 50.964, -1.476\nS: 50.962, -1.482\nW: 50.965, -1.482","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":542,"contract_id":"AR7-QUA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK SOLAR AND STORAGE LIMITED","counterparty_registration_no":"14539260","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5  6PB, United Kingdom","project_name":"Quarry","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.890326Z","start_date":null,"expected_start_date":"2028-06-23","termination_date":null,"target_commissioning_date":"2028-06-23","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"35.00","current_installed_capacity":"35.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.79875000","longitude":"-1.47225000","coordinates":"N: 51.814, -1.469\nE: 51.809, -1.455\nS: 51.784, -1.482\nW: 51.788, -1.483","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":6,"contract_id":"AR5-BIS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BIRCH SOLAR PARK LIMITED","counterparty_registration_no":"13348332","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Birch","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:07.190586Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.85875000","longitude":"0.79975000","coordinates":"N: 51.862, 0.796\nE: 51.858, 0.806\nS: 51.855, 0.805\nW: 51.86, 0.792","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":531,"contract_id":"AR7-FOF-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"FROME VALLEY SOLAR FARM LIMITED","counterparty_registration_no":"15968538","counterparty_address":"Unit 8-9 Easter Park Benyon Road, Silchester, Reading, RG7 2PQ, United Kingdom","project_name":"Foley Farms","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.901460Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2028-04-01","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-02-28","initial_installed_capacity":"16.30","current_installed_capacity":"16.30","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.07000000","longitude":"-2.59300000","coordinates":"N: 52.074, -2.59\nE: 52.071, -2.585\nS: 52.067, -2.598\nW: 52.068, -2.599","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":530,"contract_id":"AR7-PEO-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"IOLO ENERGY LIMITED","counterparty_registration_no":"12666771","counterparty_address":"Hodge House 5th Floor, St. Mary Street, Cardiff, CF10 1DY, United Kingdom","project_name":"Pen Onn Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.921698Z","start_date":null,"expected_start_date":"2029-03-30","termination_date":null,"target_commissioning_date":"2029-03-30","target_commissioning_window_start_date":"2029-03-30","long_stop_date":"2031-03-29","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.41575000","longitude":"-3.35350000","coordinates":"N: 51.419, -3.358\nE: 51.416, -3.343\nS: 51.412, -3.351\nW: 51.416, -3.362","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":121,"contract_id":"AR4-ORK-900","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"Orkney Islands Council","counterparty_registration_no":"","counterparty_address":"Orkney Islands Council, School Place, Kirkwall, KW15 1NY, United Kingdom","project_name":"Orkney Community Wind Farm Project - Hoy","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.427824Z","start_date":null,"expected_start_date":"2028-06-30","termination_date":"2025-04-28","target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-09-30","long_stop_date":"2030-06-30","initial_installed_capacity":"28.80","current_installed_capacity":"28.80","initial_strike_price":"46.39","current_strike_price":"66.47","latitude":"58.82300000","longitude":"-3.23650000","coordinates":"N: 58.836, -3.231\nE: 58.817, -3.203\nS: 58.817, -3.215\nW: 58.822, -3.297","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":533,"contract_id":"AR7-WIH-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PARKFIELD SOLAR BATTERY LIMITED","counterparty_registration_no":"16210240","counterparty_address":"Unit 1 Burlington Park Station Road, Foxton, Cambridge, CB22 6SA, United Kingdom","project_name":"Wickham Hall","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.943359Z","start_date":null,"expected_start_date":"2028-03-01","termination_date":null,"target_commissioning_date":"2028-03-01","target_commissioning_window_start_date":"2028-03-01","long_stop_date":"2030-02-28","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.88850000","longitude":"0.11900000","coordinates":"N: 51.895, 0.113\nE: 51.885, 0.125\nS: 51.885, 0.125\nW: 51.889, 0.113","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":539,"contract_id":"AR7-GRA-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LOW CARBON SOLAR PARK 38 LIMITED","counterparty_registration_no":"14442723","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Grantham","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.953342Z","start_date":null,"expected_start_date":"2030-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"33.00","current_installed_capacity":"33.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.94450000","longitude":"-0.57250000","coordinates":"N: 52.949, -0.58\nE: 52.945, -0.562\nS: 52.937, -0.566\nW: 52.947, -0.582","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":528,"contract_id":"AR7-TON-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LOW CARBON SOLAR PARK 20 LIMITED","counterparty_registration_no":"13347558","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Tonbridge","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.963245Z","start_date":null,"expected_start_date":"2030-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"6.00","current_installed_capacity":"6.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.17325000","longitude":"0.35475000","coordinates":"N: 51.178, 0.355\nE: 51.172, 0.358\nS: 51.17, 0.355\nW: 51.173, 0.351","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":532,"contract_id":"AR7-EAB-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"SUNCOAST SOLAR FARM LIMITED","counterparty_registration_no":"14219288","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Eastbourne","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:08.973404Z","start_date":null,"expected_start_date":"2030-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"17.00","current_installed_capacity":"17.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"50.78550000","longitude":"0.27925000","coordinates":"N: 50.789, 0.277\nE: 50.786, 0.289\nS: 50.783, 0.276\nW: 50.784, 0.275","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":391,"contract_id":"AR6-THS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"TOLLDISH ISG SOLAR LIMITED","counterparty_registration_no":"14216806","counterparty_address":"3rd Floor, St George's House, 13-14 Ambrose Street, Cheltenham, GL50 3LG, United Kingdom","project_name":"Tolldish Hall Farm Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.983469Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"25.00","current_installed_capacity":"21.18","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.46250000","longitude":"-1.45500000","coordinates":"N: 52.467, -1.452\nE: 52.462, -1.45\nS: 52.459, -1.456\nW: 52.462, -1.462","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"3.82","capacity_whole_station":null,"polymorphic_ctype":6},{"id":540,"contract_id":"AR7-LOB-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LONGHEDGE SOLAR LIMITED","counterparty_registration_no":"14074682","counterparty_address":"Beaufort Court, Egg Farm Lane, Kings Langley, WD4 8LR, United Kingdom","project_name":"Longhedge Solar Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-24T01:00:05.968938Z","start_date":null,"expected_start_date":"2028-06-01","termination_date":null,"target_commissioning_date":"2028-06-01","target_commissioning_window_start_date":"2028-06-01","long_stop_date":"2030-05-31","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.98325000","longitude":"-0.86925000","coordinates":"N: 52.99, -0.871\nE: 52.985, -0.858\nS: 52.973, -0.871\nW: 52.985, -0.877","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":132,"contract_id":"AR4-STW-910","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"STORNOWAY WIND FARM LIMITED","counterparty_registration_no":"SC225262","counterparty_address":"Edf Energy, Gso Business Park, East Kilbride, G74 5PG, United Kingdom","project_name":"Stornoway Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.474644Z","start_date":null,"expected_start_date":"2031-05-31","termination_date":"2025-03-24","target_commissioning_date":"2030-10-31","target_commissioning_window_start_date":"2030-10-31","long_stop_date":"2032-10-31","initial_installed_capacity":"200.00","current_installed_capacity":"200.00","initial_strike_price":"46.39","current_strike_price":"59.98","latitude":"58.20650000","longitude":"-6.46400000","coordinates":"N: 58.235, -6.454\nE: 58.211, -6.418\nS: 58.187, -6.46\nW: 58.193, -6.524","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":174,"contract_id":"AR4-MAS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"MILLTOWN AIRFIELD SOLAR PV LIMITED","counterparty_registration_no":"08838324","counterparty_address":"4th Floor, 1 Tudor street, London, EC4Y 0AH, United Kingdom","project_name":"Milltown Airfield Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.482892Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"45.99","current_strike_price":"61.51","latitude":"57.67525000","longitude":"-3.23675000","coordinates":"N: 57.681, -3.232\nE: 57.68, -3.222\nS: 57.67, -3.246\nW: 57.67, -3.247","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":177,"contract_id":"AR4-MHL-910","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"MOSSY HILL SHETLAND LIMITED","counterparty_registration_no":"07075398","counterparty_address":"19th Floor, 22 Bishopsgate, London, EC2N 4BQ, United Kingdom","project_name":"Mossy Hill","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.499616Z","start_date":null,"expected_start_date":"2026-11-30","termination_date":"2024-02-09","target_commissioning_date":"2026-11-30","target_commissioning_window_start_date":"2026-11-30","long_stop_date":"2028-11-30","initial_installed_capacity":"48.00","current_installed_capacity":"48.00","initial_strike_price":"46.39","current_strike_price":"57.52","latitude":"60.15775000","longitude":"-1.21400000","coordinates":"N: 60.184, -1.183\nE: 60.181, -1.178\nS: 60.128, -1.242\nW: 60.138, -1.253","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":182,"contract_id":"AR4-NOR-012","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"NORFOLK BOREAS LIMITED","counterparty_registration_no":"03722058","counterparty_address":"5th Floor 70, St Mary Axe, London, EC3A 8BE, United Kingdom","project_name":"Norfolk Boreas (Phase 2)","base_year":2012,"agreement_type":"Phased","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.515940Z","start_date":null,"expected_start_date":"2030-03-28","termination_date":"2024-02-09","target_commissioning_date":"2029-03-29","target_commissioning_window_start_date":"2029-03-29","long_stop_date":"2032-03-29","initial_installed_capacity":"505.00","current_installed_capacity":"505.00","initial_strike_price":"37.35","current_strike_price":"45.37","latitude":"53.14850000","longitude":"3.00250000","coordinates":"N: 53.241, 3.059\nE: 53.121, 3.093\nS: 53.116, 2.929\nW: 53.116, 2.929","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":623,"contract_id":"AR7-UGH-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PACE KINETIC ENERGY LIMITED","counterparty_registration_no":"12650799","counterparty_address":"C/O External Services Limited, Central House 20 Central Avenue, St Andrews Business Park, Norwich, NR7 0HR, United Kingdom","project_name":"UKZ047 Glebe (Horsford)","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.337209Z","start_date":null,"expected_start_date":"2027-10-29","termination_date":null,"target_commissioning_date":"2027-10-28","target_commissioning_window_start_date":"2027-10-28","long_stop_date":"2029-10-27","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.68225000","longitude":"1.24400000","coordinates":"N: 52.686, 1.241\nE: 52.681, 1.252\nS: 52.679, 1.244\nW: 52.683, 1.239","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":212,"contract_id":"AR4-BHS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"BRYN HENLLYS SF LIMITED","counterparty_registration_no":"07985107","counterparty_address":"4th Floor 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"BRYN HENLLYS Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.616596Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"26.30","current_installed_capacity":"26.30","initial_strike_price":"45.99","current_strike_price":"61.51","latitude":"51.79475000","longitude":"-3.79525000","coordinates":"N: 51.802, -3.8\nE: 51.794, -3.785\nS: 51.789, -3.791\nW: 51.794, -3.805","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":245,"contract_id":"AR4-LEP-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"LONGNEY SOLAR LIMITED","counterparty_registration_no":"10790655","counterparty_address":"4th Floor, 1 Tudor street, London, EC4Y 0AH, United Kingdom","project_name":"Longney Estate PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.654498Z","start_date":null,"expected_start_date":"2025-03-31","termination_date":"2024-02-09","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"45.99","current_strike_price":"61.51","latitude":"51.80650000","longitude":"-2.32500000","coordinates":"N: 51.814, -2.324\nE: 51.803, -2.32\nS: 51.801, -2.321\nW: 51.808, -2.335","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":279,"contract_id":"AR6-BWA-610","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"Benbrack Wind Farm Limited","counterparty_registration_no":"12971043","counterparty_address":"C/O Cms Cameron Mckenna Nabarro Olswang Llp Cannon Place, 78 Cannon Street, London, EC4N 6AF, United Kingdom","project_name":"Benbrack Wind Farm - AR6 - A2","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-06-24T01:00:06.072645Z","start_date":"2026-06-19","expected_start_date":"2026-08-31","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2028-04-01","initial_installed_capacity":"22.50","current_installed_capacity":"22.50","initial_strike_price":"50.90","current_strike_price":"75.66","latitude":"55.28725000","longitude":"-4.30825000","coordinates":"N: 55.292, -4.311\nE: 55.289, -4.304\nS: 55.277, -4.305\nW: 55.291, -4.313","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":259,"contract_id":"AR4-RHL-400","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"REDCAR HOLDINGS LIMITED","counterparty_registration_no":"11544871","counterparty_address":"Oxygen House Grenadier Road, Exeter Business Park, Exeter, EX1 3LH, United Kingdom","project_name":"Redcar Holdings Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2025-09-11T01:00:03.777701Z","start_date":null,"expected_start_date":null,"termination_date":"2022-09-26","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-03-31","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"45.99","current_strike_price":null,"latitude":"54.62575000","longitude":"-1.13525000","coordinates":"N: 54.628, -1.134\nE: 54.627, -1.132\nS: 54.623, -1.137\nW: 54.625, -1.138","technology_type":"Energy from Waste","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":true,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":147,"contract_id":"AR3-BEL-001","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Bulwell Energy Limited","counterparty_registration_no":"09157307","counterparty_address":"No 1 Nottingham Science Park, Jesse Boot Avenue, Nottingham, NG7 2RU, United Kingdom","project_name":"Bulwell Energy Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2025-09-11T01:00:03.815861Z","start_date":null,"expected_start_date":"2023-06-30","termination_date":"2021-02-16","target_commissioning_date":"2023-06-30","target_commissioning_window_start_date":"2023-06-30","long_stop_date":"2025-12-29","initial_installed_capacity":"27.50","current_installed_capacity":"27.50","initial_strike_price":"39.65","current_strike_price":"45.40","latitude":"53.00950000","longitude":"-1.21075000","coordinates":"N: 53.011, -1.212\nE: 53.01, -1.209\nS: 53.008, -1.209\nW: 53.009, -1.213","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Scottish Territorial Waters","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":178,"contract_id":"AR3-UPL-123","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Uisenis Power Limited","counterparty_registration_no":"SC389045","counterparty_address":"Eishken Lodge, Eishken, Isle Of Lewis, HS2 9LQ, United Kingdom","project_name":"Muaitheabhal Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2025-09-11T01:00:03.830897Z","start_date":null,"expected_start_date":"2030-10-31","termination_date":"2025-07-17","target_commissioning_date":"2029-12-01","target_commissioning_window_start_date":"2029-12-01","long_stop_date":"2031-11-30","initial_installed_capacity":"189.00","current_installed_capacity":"189.00","initial_strike_price":"39.65","current_strike_price":"53.41","latitude":"58.01775000","longitude":"-6.57250000","coordinates":"N: 58.04, -6.552\nE: 58.027, -6.518\nS: 58.002, -6.61\nW: 58.002, -6.61","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":82,"contract_id":"INV-DUD-003","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Dudgeon Offshore Wind Limited","counterparty_registration_no":"04418909","counterparty_address":"1 Kingdom Street, London, W2 6BD, United Kingdom","project_name":"Dudgeon Phase 3","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:10.983208Z","start_date":"2017-10-01","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2017-12-15","target_commissioning_window_start_date":"2017-10-01","long_stop_date":"2020-09-30","initial_installed_capacity":"102.00","current_installed_capacity":"100.14","initial_strike_price":"150.00","current_strike_price":"220.95","latitude":"53.26725000","longitude":"1.34500000","coordinates":"N: 53.301, 1.321\nE: 53.267, 1.377\nS: 53.24, 1.364\nW: 53.261, 1.318","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Round 2","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":232,"contract_id":"AR3-FWL-321","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Forthwind Limited","counterparty_registration_no":"SC470580","counterparty_address":"The Boathouse, Silversands, Hawkcraig Road, Aberdour, KY3 0TZ, United Kingdom","project_name":"Forthwind","base_year":2012,"agreement_type":"Generic","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2025-09-11T01:00:03.899179Z","start_date":null,"expected_start_date":"2024-04-01","termination_date":"2024-04-04","target_commissioning_date":"2023-10-02","target_commissioning_window_start_date":"2023-04-03","long_stop_date":"2026-10-02","initial_installed_capacity":"12.00","current_installed_capacity":"12.00","initial_strike_price":"39.65","current_strike_price":"55.17","latitude":"56.16625000","longitude":"-3.01500000","coordinates":"N: 56.174, -3.017\nE: 56.164, -3.002\nS: 56.155, -3.018\nW: 56.172, -3.023","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Scottish Territorial Waters","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":44,"contract_id":"AR2-RBL-412","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Rebellion Biomass LLP","counterparty_registration_no":"OC403766","counterparty_address":"Kentle Wood House, Browns Road, Daventry, NN15 4NS, United Kingdom","project_name":"Rebellion","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2025-09-11T01:00:03.953168Z","start_date":null,"expected_start_date":null,"termination_date":"2021-04-14","target_commissioning_date":"2021-04-01","target_commissioning_window_start_date":"2021-04-01","long_stop_date":"2023-03-31","initial_installed_capacity":"0.64","current_installed_capacity":"0.64","initial_strike_price":"74.75","current_strike_price":"86.22","latitude":"52.42750000","longitude":"-1.66150000","coordinates":"N: 52.428, -1.661\nE: 52.428, -1.66\nS: 52.427, -1.661\nW: 52.427, -1.664","technology_type":"Dedicated Biomass","cfd_dual_scheme":false,"connection":"Islanded","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":true,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":207,"contract_id":"AR2-PRO-005","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"TGE Management Company Limited","counterparty_registration_no":"10751052","counterparty_address":"Nene House - Ground Floor, Sopwith Way Industrial Estate, Daventry, NN11 8EA, United Kingdom","project_name":"Blackbridge TGS1 Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2025-09-11T01:00:03.975064Z","start_date":null,"expected_start_date":null,"termination_date":"2023-04-04","target_commissioning_date":"2021-04-01","target_commissioning_window_start_date":"2021-04-01","long_stop_date":"2023-03-31","initial_installed_capacity":"5.56","current_installed_capacity":"5.56","initial_strike_price":"74.75","current_strike_price":"99.98","latitude":"52.37775000","longitude":"-0.66600000","coordinates":"N: 52.378, -0.666\nE: 52.378, -0.666\nS: 52.377, -0.666\nW: 52.378, -0.666","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":293,"contract_id":"AR6-CWE-600","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"CARNO 3 LLP","counterparty_registration_no":"OC455275","counterparty_address":"Bron Haul, Carno, Caersws, Powys, SY17 5JY, United Kingdom","project_name":"Carno Wind Farm Extension Phase III","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:05.472829Z","start_date":null,"expected_start_date":"2028-03-01","termination_date":null,"target_commissioning_date":"2028-03-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-04-01","initial_installed_capacity":"45.00","current_installed_capacity":"45.00","initial_strike_price":"50.90","current_strike_price":"75.14","latitude":"52.53075000","longitude":"-3.60650000","coordinates":"N: 52.549, -3.633\nE: 52.522, -3.554\nS: 52.517, -3.596\nW: 52.535, -3.643","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":11,"contract_id":"AR4-CRN-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"CORNWELL SOLAR FARM LIMITED","counterparty_registration_no":"12374418","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Cornwell","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"The Expected Start Date is under review by LCCC","updated_at":"2026-09-04T01:00:07.054356Z","start_date":null,"expected_start_date":"2026-06-30","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"35.00","current_installed_capacity":"35.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.70025000","longitude":"-1.03325000","coordinates":"N: 51.704, -1.032\nE: 51.698, -1.026\nS: 51.697, -1.029\nW: 51.702, -1.046","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":252,"contract_id":"AR2-NTC-404","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Northacre Renewable Energy Limited","counterparty_registration_no":"07594338","counterparty_address":"Wiltshire House, County Park Business Centre, Shrivenham Road, Swindon, SN1 2NR, United Kingdom","project_name":"Northacre Renewable Energy Centre","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2025-09-11T01:00:04.059423Z","start_date":null,"expected_start_date":null,"termination_date":"2023-03-09","target_commissioning_date":"2021-04-01","target_commissioning_window_start_date":"2021-04-01","long_stop_date":"2023-03-31","initial_installed_capacity":"25.50","current_installed_capacity":"25.50","initial_strike_price":"74.75","current_strike_price":"99.98","latitude":"51.26700000","longitude":"-2.20625000","coordinates":"N: 51.268, -2.206\nE: 51.267, -2.204\nS: 51.266, -2.207\nW: 51.267, -2.208","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":622,"contract_id":"AR7-UMA-704","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PACE MAGMA ENERGY LIMITED","counterparty_registration_no":"12645953","counterparty_address":"C/O External Services Limited, Central House 20 Central Avenue, St Andrews Business Park, Norwich, NR7 0HR, United Kingdom","project_name":"UKZ020 Maleys","base_year":2024,"agreement_type":"Private Network","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-16T01:00:05.324733Z","start_date":null,"expected_start_date":"2027-10-28","termination_date":null,"target_commissioning_date":"2027-10-28","target_commissioning_window_start_date":"2027-07-28","long_stop_date":"2029-07-27","initial_installed_capacity":"24.50","current_installed_capacity":"24.50","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.64600000","longitude":"1.09450000","coordinates":"N: 52.65, 1.093\nE: 52.645, 1.105\nS: 52.642, 1.09\nW: 52.647, 1.09","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":7,"contract_id":"AR4-BRC-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"DROVER LANE SOLAR FARM LIMITED","counterparty_registration_no":"12269585","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y  5AD, United Kingdom","project_name":"Brackley","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-07-03T01:00:06.195958Z","start_date":null,"expected_start_date":"2026-06-30","termination_date":"2026-07-01","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.07900000","longitude":"-1.16725000","coordinates":"N: 52.087, -1.167\nE: 52.072, -1.161\nS: 52.071, -1.166\nW: 52.086, -1.175","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":354,"contract_id":"AR6-LSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BOOM LOW FARM SOLAR LIMITED","counterparty_registration_no":"13518709","counterparty_address":"10 Lower Thames Street, London, EC3R 6AF, United Kingdom","project_name":"Low Farm Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:05.523542Z","start_date":null,"expected_start_date":"2027-12-01","termination_date":null,"target_commissioning_date":"2026-12-01","target_commissioning_window_start_date":"2026-09-02","long_stop_date":"2028-12-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"53.63925000","longitude":"-1.63625000","coordinates":"N: 53.646, -1.632\nE: 53.64, -1.624\nS: 53.634, -1.64\nW: 53.637, -1.649","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":3,"contract_id":"AR4-BSL-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"CROUCH SOLAR FARM LIMITED","counterparty_registration_no":"12374553","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Basildon","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:07.287920Z","start_date":"2025-07-01","expected_start_date":"2025-06-30","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.58675000","longitude":"0.38050000","coordinates":"N: 51.589, 0.385\nE: 51.588, 0.385\nS: 51.582, 0.38\nW: 51.588, 0.372","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":621,"contract_id":"AR7-UOW-600","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"UPPER OGMORE ENERGY LIMITED","counterparty_registration_no":"13790283","counterparty_address":"95 Gresham Street, London, EC2V 7AB, United Kingdom","project_name":"Upper Ogmore Wind Farm","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:05.517220Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"25.80","current_installed_capacity":"25.80","initial_strike_price":"72.24","current_strike_price":"76.34","latitude":"51.63825000","longitude":"-3.56650000","coordinates":"N: 51.645, -3.556\nE: 51.641, -3.542\nS: 51.63, -3.574\nW: 51.637, -3.594","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":404,"contract_id":"LCH-WGH-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"SCOTTISHPOWER ENERGY RETAIL LIMITED","counterparty_registration_no":"SC190287","counterparty_address":"320, St. Vincent Street, Glasgow, G2 5AD, United Kingdom","project_name":"Whitelee Green Hydrogen Project","base_year":2022,"agreement_type":"Green","contract_version":"Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-04-21T01:00:05.249542Z","start_date":null,"expected_start_date":null,"termination_date":"2025-12-19","target_commissioning_date":"2026-12-29","target_commissioning_window_start_date":"2026-12-29","target_commissioning_window_end_date":"2027-12-29","long_stop_date":"2028-12-29","initial_installed_capacity":"7.10","current_installed_capacity":"7.10","initial_strike_price":"188.56","current_strike_price":"224.74","latitude":null,"longitude":null,"coordinates":"N: 55.696363, -4.366768\nE: 55.695364, -4.3663416\nS: 55.695145, -4.3679515\nW: 55.696105, -4.3685029","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"839466.00","current_sales_cap":"839466.00","production_plant_coordinates":"N: 55.696363, -4.366768\nE: 55.695364, -4.3663416\nS: 55.695261, -4.3670515\nW: 55.696231, -4.3675716","production_plant_longitude":"-4.36693318","production_plant_latitude":"55.69580475","cost_estimate_of_storage_of_hydrogen":null,"cost_estimate_of_transport_of_hydrogen":"27.67","polymorphic_ctype":7},{"id":624,"contract_id":"AR7-NOW-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORTH WEALD SOLAR LIMITED","counterparty_registration_no":"13664817","counterparty_address":"C/O Voltalia Uk Ltd The Wheelhouse, Bond's Mill Estate, Stonehouse, GL10 3RF, United Kingdom","project_name":"NORTH WEALD","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.603218Z","start_date":null,"expected_start_date":"2028-09-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.22550000","longitude":"-0.18675000","coordinates":"N: 52.233, -0.176\nE: 52.232, -0.176\nS: 52.215, -0.194\nW: 52.222, -0.201","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":625,"contract_id":"AR7-USR-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"PACE INSTANT ENERGY LIMITED","counterparty_registration_no":"12645561","counterparty_address":"C/O External Services Limited, Central House 20 Central Avenue, St Andrews Business Park, Norwich, NR7 0HR, United Kingdom","project_name":"UKZ024 Station Road","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:05.626122Z","start_date":null,"expected_start_date":"2027-10-25","termination_date":null,"target_commissioning_date":"2027-10-25","target_commissioning_window_start_date":"2027-07-25","long_stop_date":"2029-07-24","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.45125000","longitude":"1.18300000","coordinates":"N: 52.453, 1.183\nE: 52.453, 1.191\nS: 52.448, 1.182\nW: 52.451, 1.176","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":16,"contract_id":"AAA-DOR-182","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Dorenell Wind Farm Limited","counterparty_registration_no":"05628395","counterparty_address":"Alexander House, 1 Mandarin Road, Rainton Bridge Business Park, Houghton Le Spring, Sunderland, DH4 5RA, United Kingdom","project_name":"Dorenell Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:07.339715Z","start_date":"2018-12-20","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-04-30","target_commissioning_window_start_date":"2018-04-15","long_stop_date":"2020-04-14","initial_installed_capacity":"177.00","current_installed_capacity":"173.70","initial_strike_price":"82.50","current_strike_price":"120.28","latitude":"57.34200000","longitude":"-3.12875000","coordinates":"N: 57.37, -3.107\nE: 57.357, -3.1\nS: 57.317, -3.138\nW: 57.324, -3.17","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":18,"contract_id":"CAA-EAS-167","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"East Anglia One Limited","counterparty_registration_no":"07366753","counterparty_address":"3rd Floor, 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"EA 1, Phase 2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:07.352321Z","start_date":"2020-03-31","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2019-03-31","target_commissioning_window_start_date":"2019-03-31","long_stop_date":"2022-03-30","initial_installed_capacity":"285.00","current_installed_capacity":"283.369","initial_strike_price":"119.89","current_strike_price":"176.12","latitude":"52.22000000","longitude":"2.50400000","coordinates":"N: 52.304, 2.571\nE: 52.304, 2.571\nS: 52.079, 2.467\nW: 52.193, 2.407","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":179,"contract_id":"AR4-MYT-710","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 12 LTD","counterparty_registration_no":"12140230","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Myttons","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"LCCC contract manager has estimated the expected start date (ESD) for this project.","updated_at":"2026-04-01T01:00:07.373634Z","start_date":null,"expected_start_date":"2029-04-30","termination_date":null,"target_commissioning_date":"2025-01-01","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2030-04-30","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"45.99","current_strike_price":"62.99","latitude":"52.73575000","longitude":"-2.67050000","coordinates":"N: 52.76, -2.648\nE: 52.748, -2.639\nS: 52.709, -2.69\nW: 52.726, -2.705","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":427,"contract_id":"AR7-ERE-910","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BLUE GEM WIND LIMITED","counterparty_registration_no":"11116383","counterparty_address":"Bridge Innovation Centre, Pembrokeshire Science & Technology Park, Pembroke Dock, SA72 6UN, United Kingdom","project_name":"Erebus","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-04-01T01:00:07.734969Z","start_date":null,"expected_start_date":"2030-03-31","termination_date":null,"target_commissioning_date":"2030-03-31","target_commissioning_window_start_date":"2030-03-31","long_stop_date":"2032-03-30","initial_installed_capacity":"100.00","current_installed_capacity":"100.00","initial_strike_price":"216.49","current_strike_price":"230.38","latitude":"51.45850000","longitude":"-5.58375000","coordinates":"N: 51.494, -5.583\nE: 51.424, -5.552\nS: 51.424, -5.552\nW: 51.492, -5.648","technology_type":"Floating Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":419,"contract_id":"AR7-NOV-010","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORFOLK VANGUARD WEST LIMITED","counterparty_registration_no":"08141115","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Norfolk Vanguard West CFD Unit C Phase 1","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:05.591873Z","start_date":null,"expected_start_date":"2028-04-29","termination_date":null,"target_commissioning_date":"2028-04-22","target_commissioning_window_start_date":"2028-04-22","long_stop_date":"2031-04-21","initial_installed_capacity":"75.00","current_installed_capacity":"75.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"52.91675000","longitude":"2.51700000","coordinates":"N: 52.937, 2.463\nE: 52.913, 2.571\nS: 52.881, 2.571\nW: 52.936, 2.463","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":414,"contract_id":"ICC-PCW-1T1","allocation_round":"Track-1","scheme":"ICC","counterparty_name":"Castle Cement Limited","counterparty_registration_no":"2182762","counterparty_address":"Second Floor, Arena Court, Crown Lane, Maidenhead, SL6 8QZ, United Kingdom","project_name":"Padeswood Cement Works","base_year":2022,"agreement_type":"NULL","contract_version":"Final Version","comment":"Cement Production","updated_at":"2026-06-04T01:00:08.091783Z","start_date":null,"expected_start_date":"2029-05-31","termination_date":null,"target_commissioning_date":"2029-05-31","target_commissioning_window_start_date":"2029-05-31","target_commissioning_window_end_date":"2030-05-30","long_stop_date":"2031-05-30","initial_installed_capacity":null,"current_installed_capacity":null,"initial_strike_price":"94.56","current_strike_price":"116.12","latitude":"53.15173625","longitude":"-3.06069450","coordinates":"N: 53.155556, -3.065278\nE: 53.1575, -3.055\nS: 53.144167, -3.054722\nW: 53.149722, -3.067778","technology_type":"Installation Capture Technology","capture_technology_type":"Post-Combustion Capture","co2_production_activity":"Cement Production","co2_capture_rate_estimate":"95.00","co2_t_s_flow_rate_estimate_tph":"112.00","co2_transport_and_storage_operator":"The Liverpool Bay CCS Limited","co2_utilisation_flow_rate_estimate_tph":"0.00","declared_co2_t_s_flow_rate_percentage":"100.00","declared_co2_utilisation_flow_rate_percentage":"0.00","maximum_annual_co2_capture_quantity_tco2":"800000.00","maximum_co2_rich_stream_output_to_t_s_tco2":"826446.00","maximum_t_s_capacity_tco2":"2832.00","maximum_t_s_delivery_point_size_tco2":"2832.00","metered_co2_output_estimate_tco2":"3601300.00","metered_co2_output_to_t_s_estimate_tco2":"3601300.00","initial_capex_payment_rate_gbp_per_tco2":"241.34","current_capex_payment_rate_gbp_per_tco2":"241.34","polymorphic_ctype":16},{"id":415,"contract_id":"WICC-PRE-1T1","allocation_round":"Track-1","scheme":"WICC","counterparty_name":"Protos ERF CCS Limited","counterparty_registration_no":"14900532","counterparty_address":"Floor 4, Lynton House, 7-12 Tavistock Square, London, WC1H 9LT, United Kingdom","project_name":"PROTOS ENERGY RECOVERY FACILITY PROJECT","base_year":2022,"agreement_type":"NULL","contract_version":"Version 1 04 Sept 2025","comment":"Waste Processing","updated_at":"2026-06-04T01:00:08.112402Z","start_date":null,"expected_start_date":"2029-05-30","termination_date":null,"target_commissioning_date":"2029-05-30","target_commissioning_window_start_date":"2029-05-30","target_commissioning_window_end_date":"2030-05-30","long_stop_date":"2031-05-30","initial_installed_capacity":null,"current_installed_capacity":null,"initial_strike_price":"68.30","current_strike_price":"83.87","latitude":"53.28416200","longitude":"-2.79747080","coordinates":"N: 53.284742, -2.7964279\nE: 53.284368, -2.7958659\nS: 53.283444, -2.7970337\nW: 53.284094, -2.8005557","technology_type":"Waste Installation Technology","capture_technology_type":"Post-Combustion Capture","co2_production_activity":"Waste Processing","co2_capture_rate_estimate":"95.00","co2_t_s_flow_rate_estimate_tph":"45.847","co2_transport_and_storage_operator":"The Liverpool Bay CCS Limited","co2_utilisation_flow_rate_estimate_tph":"0.00","declared_co2_t_s_flow_rate_percentage":"100.00","declared_co2_utilisation_flow_rate_percentage":"0.00","maximum_annual_co2_capture_quantity_tco2":"393000.00","maximum_co2_rich_stream_output_to_t_s_tco2":"398985.00","maximum_t_s_capacity_tco2":"1345.20","maximum_t_s_delivery_point_size_tco2":"1345.20","metered_co2_output_estimate_tco2":"2965948.00","metered_co2_output_to_t_s_estimate_tco2":"2965948.00","initial_capex_payment_rate_gbp_per_tco2":"149.83","current_capex_payment_rate_gbp_per_tco2":"149.83","initial_minimum_turndown_rate":"475.20","polymorphic_ctype":17},{"id":416,"contract_id":"LCH-HBG-001","allocation_round":"Hydrogen Allocation Round 1","scheme":"LCHA","counterparty_name":"HYBONT LIMITED","counterparty_registration_no":"15348417","counterparty_address":"95, Gresham Street, London, EC2V 7AB, United Kingdom","project_name":"HYBONT BRIDGEND GREEN HYDROGEN PROJECT","base_year":2022,"agreement_type":"Green","contract_version":"Version: Hydrogen Allocation Round 1; December 2024","comment":"","updated_at":"2026-11-03T01:00:04.933638Z","start_date":null,"expected_start_date":"2028-06-30","termination_date":null,"target_commissioning_date":"2027-06-30","target_commissioning_window_start_date":"2027-06-30","target_commissioning_window_end_date":"2028-06-29","long_stop_date":"2029-06-29","initial_installed_capacity":"5.20","current_installed_capacity":"5.20","initial_strike_price":"256.66","current_strike_price":"315.18","latitude":null,"longitude":null,"coordinates":"N: 51.548248, -3.573548\nE: 51.547614, -3.572017\nS: 51.547196, -3.573024\nW: 51.547693, -3.574733","technology_type":"Electrolytic Technology","lchs_agreed_version":"Version 3, December 2023","initial_sales_cap":"406015.00","current_sales_cap":"406015.00","production_plant_coordinates":"N: 51.547874, -3.572886\nE: 51.547878, -3.572438\nS: 51.547749, -3.572288\nW: 51.547643, -3.573691","production_plant_longitude":"-3.57282575","production_plant_latitude":"51.54778600","cost_estimate_of_storage_of_hydrogen":"10.50","cost_estimate_of_transport_of_hydrogen":null,"polymorphic_ctype":7},{"id":417,"contract_id":"AR7-NVE-012","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORFOLK VANGUARD EAST LIMITED","counterparty_registration_no":"12476373","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Norfolk Vanguard East CFD Unit A Phase 2","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:05.633433Z","start_date":null,"expected_start_date":"2029-10-11","termination_date":null,"target_commissioning_date":"2029-10-04","target_commissioning_window_start_date":"2029-10-04","long_stop_date":"2032-10-03","initial_installed_capacity":"690.00","current_installed_capacity":"690.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"52.93325000","longitude":"3.02900000","coordinates":"N: 53.053, 3.112\nE: 52.937, 3.145\nS: 52.87, 3.085\nW: 52.873, 2.774","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":423,"contract_id":"AR7-NVE-011","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORFOLK VANGUARD EAST LIMITED","counterparty_registration_no":"12476373","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Norfolk Vanguard East CFD Unit A Phase 1","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:05.705449Z","start_date":null,"expected_start_date":"2029-05-15","termination_date":null,"target_commissioning_date":"2029-05-08","target_commissioning_window_start_date":"2029-05-08","long_stop_date":"2032-05-07","initial_installed_capacity":"690.00","current_installed_capacity":"525.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"52.79200000","longitude":"2.87325000","coordinates":"N: 52.89, 2.937\nE: 52.772, 3.038\nS: 52.753, 2.759\nW: 52.753, 2.759","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"165.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":421,"contract_id":"AR7-NVA-010","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORFOLK VANGUARD EAST LIMITED","counterparty_registration_no":"12476373","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Norfolk Vanguard East CFD Unit C Phase 1","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:05.602136Z","start_date":null,"expected_start_date":"2029-02-17","termination_date":null,"target_commissioning_date":"2029-02-10","target_commissioning_window_start_date":"2029-02-10","long_stop_date":"2032-02-09","initial_installed_capacity":"75.00","current_installed_capacity":"75.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"52.84525000","longitude":"2.98650000","coordinates":"N: 52.889, 2.935\nE: 52.832, 3.038\nS: 52.772, 3.038\nW: 52.888, 2.935","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":422,"contract_id":"AR7-NVB-010","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORFOLK VANGUARD WEST LIMITED","counterparty_registration_no":"08141115","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Norfolk Vanguard West CFD Unit B Phase 1","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:05.612062Z","start_date":null,"expected_start_date":"2028-04-13","termination_date":null,"target_commissioning_date":"2028-04-06","target_commissioning_window_start_date":"2028-04-06","long_stop_date":"2031-04-05","initial_installed_capacity":"90.00","current_installed_capacity":"90.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"52.94175000","longitude":"2.54400000","coordinates":"N: 52.959, 2.571\nE: 52.959, 2.571\nS: 52.913, 2.571\nW: 52.936, 2.463","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":424,"contract_id":"AR7-NVC-010","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORFOLK VANGUARD EAST LIMITED","counterparty_registration_no":"12476373","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Norfolk Vanguard East CFD Unit B Phase 1","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:05.620951Z","start_date":null,"expected_start_date":"2029-01-28","termination_date":null,"target_commissioning_date":"2029-01-21","target_commissioning_window_start_date":"2029-01-21","long_stop_date":"2032-01-20","initial_installed_capacity":"90.00","current_installed_capacity":"90.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"52.86025000","longitude":"3.01250000","coordinates":"N: 52.889, 2.935\nE: 52.832, 3.09\nS: 52.832, 3.09\nW: 52.888, 2.935","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":418,"contract_id":"AR7-NVW-012","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"NORFOLK VANGUARD WEST LIMITED","counterparty_registration_no":"08141115","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Norfolk Vanguard West CFD Unit A Phase 2","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:05.644161Z","start_date":null,"expected_start_date":"2028-12-01","termination_date":null,"target_commissioning_date":"2028-11-24","target_commissioning_window_start_date":"2028-11-24","long_stop_date":"2031-11-23","initial_installed_capacity":"690.00","current_installed_capacity":"600.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"52.97750000","longitude":"2.45225000","coordinates":"N: 53.044, 2.571\nE: 53.044, 2.571\nS: 52.886, 2.358\nW: 52.936, 2.309","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"90.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":138,"contract_id":"AR4-YSF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"Yelvertoft Solar Farm Limited","counterparty_registration_no":"12019512","counterparty_address":"3 Temple Quay, Temple, Back East, Bristol, BS1 6DZ, United Kingdom","project_name":"Yelvertoft Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"Expected Start Date of 30.11.2025 has been provided by Generator","updated_at":"2026-06-27T01:00:05.724282Z","start_date":"2025-10-28","expected_start_date":"2025-10-28","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"36.09","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.36550000","longitude":"-1.13675000","coordinates":"N: 52.368, -1.14\nE: 52.367, -1.128\nS: 52.36, -1.132\nW: 52.367, -1.147","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"12.02","capacity_whole_station":null,"polymorphic_ctype":6},{"id":394,"contract_id":"AR6-WHA-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"WHADDON FARM SOLAR PARK LIMITED","counterparty_registration_no":"13190271","counterparty_address":"35 And 35a The Maltings, Lower Charlton Trading Estate, Shepton Mallet, BA4 5QE, United Kingdom","project_name":"Whaddon Farm Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-08-06T01:00:04.691814Z","start_date":null,"expected_start_date":"2027-01-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2027-07-01","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.34856250","longitude":"-2.18345250","coordinates":"N: 51.3506, -2.17972\nE: 51.34524, -2.18517\nS: 51.34964, -2.17871\nW: 51.34877, -2.19021","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":270,"contract_id":"AR5-UDG-800","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"UNITED DOWNS GEOTHERMAL LIMITED","counterparty_registration_no":"10868073","counterparty_address":"United Downs Industrial Estate, St Day, Redruth, TR16 5HY, United Kingdom","project_name":"United Downs Geothermal Power Plant","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-09-08T01:00:07.737777Z","start_date":null,"expected_start_date":"2027-10-01","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-01-01","long_stop_date":"2028-01-01","initial_installed_capacity":"2.00","current_installed_capacity":"2.00","initial_strike_price":"119.00","current_strike_price":"175.67","latitude":"50.22950000","longitude":"-5.16550000","coordinates":"N: 50.23, -5.165\nE: 50.229, -5.165\nS: 50.229, -5.166\nW: 50.23, -5.166","technology_type":"Geothermal","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":459,"contract_id":"AR7-YLL-510","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HYDROWING TIDAL PROJECTS 2 LTD","counterparty_registration_no":"15650941","counterparty_address":"M S Parc, Parc Gwyddoniaeth Menai, Gaerwen, LL60 6AG, United Kingdom","project_name":"Ynni'r Lleuad 3","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-04-01T01:00:08.295898Z","start_date":null,"expected_start_date":"2029-06-30","termination_date":null,"target_commissioning_date":"2029-06-30","target_commissioning_window_start_date":"2029-04-01","long_stop_date":"2031-03-31","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"265.00","current_strike_price":"282.00","latitude":"53.30300000","longitude":"-4.71050000","coordinates":"N: 53.305, -4.715\nE: 53.301, -4.706\nS: 53.301, -4.706\nW: 53.305, -4.715","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":460,"contract_id":"AR7-MEG-510","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"MOR ENERGY LIMITED","counterparty_registration_no":"13832903","counterparty_address":"C/O Tocardo (Formally Aac Waterproofing), Gaerwen Industrial Estate, Stad Maes Rhydd, Gaerwen, LL60 6AZ, United Kingdom","project_name":"Mor Energy GO3 Phase2","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-04-01T01:00:08.332911Z","start_date":null,"expected_start_date":"2029-10-01","termination_date":null,"target_commissioning_date":"2029-04-01","target_commissioning_window_start_date":"2029-01-01","long_stop_date":"2030-12-31","initial_installed_capacity":"5.50","current_installed_capacity":"5.50","initial_strike_price":"265.00","current_strike_price":"282.00","latitude":"53.30775000","longitude":"-4.72350000","coordinates":"N: 53.31, -4.725\nE: 53.309, -4.719\nS: 53.306, -4.72\nW: 53.306, -4.73","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":466,"contract_id":"AR7-DBS-012","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK DOGGER BANK SOUTH (WEST) LIMITED","counterparty_registration_no":"13656525","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Dogger Bank South West CfD Unit A Phase 2","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:05.739195Z","start_date":null,"expected_start_date":"2031-11-30","termination_date":null,"target_commissioning_date":"2031-11-30","target_commissioning_window_start_date":"2031-11-30","long_stop_date":"2034-11-29","initial_installed_capacity":"558.00","current_installed_capacity":"558.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"54.64192500","longitude":"1.60750000","coordinates":"N: 54.7677, 1.598\nE: 54.642, 1.743\nS: 54.564, 1.613\nW: 54.594, 1.476","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":468,"contract_id":"AR7-AYM-011","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"AWEL Y MÔR OFFSHORE WIND FARM LIMITED","counterparty_registration_no":"12270928","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Awel y Môr Offshore Wind Farm A Phase 1","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:05.760478Z","start_date":null,"expected_start_date":"2031-04-30","termination_date":null,"target_commissioning_date":"2031-03-31","target_commissioning_window_start_date":"2031-03-31","long_stop_date":"2034-03-30","initial_installed_capacity":"232.50","current_installed_capacity":"232.50","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"53.46225000","longitude":"-3.70625000","coordinates":"N: 53.491, -3.61\nE: 53.491, -3.61\nS: 53.422, -3.746\nW: 53.445, -3.859","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":469,"contract_id":"AR7-AYM-012","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"AWEL Y MÔR OFFSHORE WIND FARM LIMITED","counterparty_registration_no":"12270928","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Awel y Môr Offshore Wind Farm A Phase 2","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:05.771765Z","start_date":null,"expected_start_date":"2031-07-25","termination_date":null,"target_commissioning_date":"2031-07-25","target_commissioning_window_start_date":"2031-07-25","long_stop_date":"2034-07-24","initial_installed_capacity":"542.50","current_installed_capacity":"542.50","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"53.47825000","longitude":"-3.75525000","coordinates":"N: 53.49, -3.651\nE: 53.49, -3.651\nS: 53.445, -3.859\nW: 53.488, -3.86","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":470,"contract_id":"AR7-DBS-013","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK DOGGER BANK SOUTH (WEST) LIMITED","counterparty_registration_no":"13656525","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Dogger Bank South West CfD Unit A Phase 3","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:05.781949Z","start_date":null,"expected_start_date":"2031-12-01","termination_date":null,"target_commissioning_date":"2031-12-01","target_commissioning_window_start_date":"2031-12-01","long_stop_date":"2034-11-30","initial_installed_capacity":"539.00","current_installed_capacity":"539.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"54.63550000","longitude":"1.46700000","coordinates":"N: 54.729, 1.372\nE: 54.564, 1.613\nS: 54.537, 1.549\nW: 54.712, 1.334","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":471,"contract_id":"AR7-DOB-012","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK DOGGER BANK SOUTH (EAST) LIMITED","counterparty_registration_no":"13656240","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Dogger Bank South East CfD Unit A Phase 2","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:05.792379Z","start_date":null,"expected_start_date":"2032-03-15","termination_date":null,"target_commissioning_date":"2032-03-15","target_commissioning_window_start_date":"2032-03-15","long_stop_date":"2035-03-14","initial_installed_capacity":"558.00","current_installed_capacity":"558.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"54.40675000","longitude":"1.99700000","coordinates":"N: 54.488, 2.065\nE: 54.406, 2.135\nS: 54.36, 1.9\nW: 54.373, 1.888","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":472,"contract_id":"AR7-DOB-011","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK DOGGER BANK SOUTH (EAST) LIMITED","counterparty_registration_no":"13656240","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Dogger Bank South East CfD Unit A Phase 1","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:05.802733Z","start_date":null,"expected_start_date":"2031-03-30","termination_date":null,"target_commissioning_date":"2031-03-30","target_commissioning_window_start_date":"2031-03-30","long_stop_date":"2034-03-29","initial_installed_capacity":"403.00","current_installed_capacity":"403.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"54.48275000","longitude":"1.95275000","coordinates":"N: 54.571, 1.994\nE: 54.488, 2.065\nS: 54.436, 1.876\nW: 54.436, 1.876","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":473,"contract_id":"AR7-DOB-013","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK DOGGER BANK SOUTH (EAST) LIMITED","counterparty_registration_no":"13656240","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Dogger Bank South East CfD Unit A Phase 3","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-19T01:00:05.813134Z","start_date":null,"expected_start_date":"2032-07-01","termination_date":null,"target_commissioning_date":"2032-07-01","target_commissioning_window_start_date":"2032-07-01","long_stop_date":"2035-06-30","initial_installed_capacity":"539.00","current_installed_capacity":"539.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"54.46350000","longitude":"1.85725000","coordinates":"N: 54.566, 1.882\nE: 54.392, 1.9\nS: 54.373, 1.888\nW: 54.523, 1.759","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":467,"contract_id":"AR7-DBS-011","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK DOGGER BANK SOUTH (WEST) LIMITED","counterparty_registration_no":"13656525","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Dogger Bank South West CfD Unit A Phase 1","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-22T01:00:06.079080Z","start_date":null,"expected_start_date":"2030-10-30","termination_date":null,"target_commissioning_date":"2030-10-30","target_commissioning_window_start_date":"2030-10-30","long_stop_date":"2033-10-29","initial_installed_capacity":"403.00","current_installed_capacity":"403.00","initial_strike_price":"91.20","current_strike_price":"97.05","latitude":"54.68225000","longitude":"1.45450000","coordinates":"N: 54.729, 1.372\nE: 54.677, 1.598\nS: 54.594, 1.476\nW: 54.729, 1.372","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":501,"contract_id":"AR7-FOR-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"FAIR OAKS RENEWABLE ENERGY PARK LTD","counterparty_registration_no":"13794291","counterparty_address":"Suite 5 7th Floor, 50 Broadway, London, SW1H 0DB, United Kingdom","project_name":"Fair Oaks Renewable Energy Park","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-24T01:00:06.426245Z","start_date":null,"expected_start_date":"2027-11-30","termination_date":null,"target_commissioning_date":"2027-11-30","target_commissioning_window_start_date":"2027-10-30","long_stop_date":"2029-10-29","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.87650000","longitude":"-1.17650000","coordinates":"N: 52.885, -1.179\nE: 52.872, -1.17\nS: 52.87, -1.174\nW: 52.879, -1.183","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":489,"contract_id":"AR7-PFO-911","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HIGHLAND WIND LIMITED","counterparty_registration_no":"SC675148","counterparty_address":"4th Floor 115 George Street, Edinburgh, EH2 4JN, United Kingdom","project_name":"Pentland Floating Offshore Wind Farm Phase 1","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-04-01T01:00:08.645092Z","start_date":null,"expected_start_date":"2031-03-30","termination_date":null,"target_commissioning_date":"2030-03-31","target_commissioning_window_start_date":"2030-03-31","long_stop_date":"2032-03-30","initial_installed_capacity":"37.00","current_installed_capacity":"37.00","initial_strike_price":"216.49","current_strike_price":"230.38","latitude":"58.65600000","longitude":"-3.86050000","coordinates":"N: 58.674, -3.85\nE: 58.638, -3.849\nS: 58.638, -3.871\nW: 58.674, -3.872","technology_type":"Floating Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":490,"contract_id":"AR7-PFO-912","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"HIGHLAND WIND LIMITED","counterparty_registration_no":"SC675148","counterparty_address":"4th Floor 115 George Street, Edinburgh, EH2 4JN, United Kingdom","project_name":"Pentland Floating Offshore Wind Farm Phase 2","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-04-01T01:00:08.656529Z","start_date":null,"expected_start_date":"2031-09-29","termination_date":null,"target_commissioning_date":"2031-09-29","target_commissioning_window_start_date":"2030-09-30","long_stop_date":"2032-09-29","initial_installed_capacity":"55.50","current_installed_capacity":"55.50","initial_strike_price":"216.49","current_strike_price":"230.38","latitude":"58.65600000","longitude":"-3.88200000","coordinates":"N: 58.674, -3.872\nE: 58.638, -3.871\nS: 58.638, -3.892\nW: 58.674, -3.893","technology_type":"Floating Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":509,"contract_id":"AR7-WEL-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GREENTECH INVEST UK (4) LIMITED","counterparty_registration_no":"12972505","counterparty_address":"Challenge House, Sherwood Drive, Bletchley, Milton Keynes, MK3 6DP, United Kingdom","project_name":"Wellbank","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-23T01:00:05.845353Z","start_date":null,"expected_start_date":"2028-05-31","termination_date":null,"target_commissioning_date":"2027-12-01","target_commissioning_window_start_date":"2027-06-01","long_stop_date":"2029-05-31","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"56.53025000","longitude":"-2.87075000","coordinates":"N: 56.533, -2.873\nE: 56.531, -2.861\nS: 56.525, -2.87\nW: 56.532, -2.879","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":85,"contract_id":"AAA-ENE-171","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Energy Works (Hull) Limited","counterparty_registration_no":"07829330","counterparty_address":"67 Grosvenor Street, Mayfair, London, W1K 3JN, United Kingdom","project_name":"Energy Works (Hull)","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-10-28T01:00:06.508284Z","start_date":"2019-12-09","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-01-01","target_commissioning_window_start_date":"2018-01-01","long_stop_date":"2020-10-31","initial_installed_capacity":"25.00","current_installed_capacity":"25.00","initial_strike_price":"119.89","current_strike_price":"176.98","latitude":"53.75500000","longitude":"-0.32775000","coordinates":"N: 53.756, -0.329\nE: 53.755, -0.327\nS: 53.754, -0.327\nW: 53.755, -0.328","technology_type":"Advanced Conversion Technology","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":512,"contract_id":"AR7-MTT-510","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"TIDAL TECHNOLOGIES W1 LTD","counterparty_registration_no":"16634316","counterparty_address":"Bridge Innovation Centre, Pembrokeshire Science And Technology Park, Pembroke Dock, SA72 6UN, United Kingdom","project_name":"MORLAIS Tidal Tech GR1 W1.1","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-04-01T01:00:08.980369Z","start_date":null,"expected_start_date":"2028-04-04","termination_date":null,"target_commissioning_date":"2028-04-01","target_commissioning_window_start_date":"2028-04-01","long_stop_date":"2030-03-31","initial_installed_capacity":"3.00","current_installed_capacity":"3.00","initial_strike_price":"265.00","current_strike_price":"282.00","latitude":"53.29750000","longitude":"-4.73700000","coordinates":"N: 53.298, -4.738\nE: 53.298, -4.736\nS: 53.297, -4.736\nW: 53.297, -4.738","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":165,"contract_id":"AAA-K3C-180","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"enfinium K3 CHP Limited","counterparty_registration_no":"09240062","counterparty_address":"123 Victoria Street (2nd Floor), London, SW1E 6DE, United Kingdom","project_name":"K3 CHP Facility","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:08.991649Z","start_date":"2020-07-17","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-12-15","target_commissioning_window_start_date":"2018-12-15","long_stop_date":"2020-12-14","initial_installed_capacity":"45.00","current_installed_capacity":"45.00","initial_strike_price":"80.00","current_strike_price":"118.10","latitude":"51.36550000","longitude":"0.76075000","coordinates":"N: 51.367, 0.762\nE: 51.367, 0.764\nS: 51.363, 0.759\nW: 51.365, 0.758","technology_type":"Energy from Waste","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":true,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":166,"contract_id":"AAA-BAN-189","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Banks Renewables (Kype Muir Wind Farm) Limited","counterparty_registration_no":"06917667","counterparty_address":"Inkerman House, St Johns Road, Meadowfield, Durham, DH7 8XL, United Kingdom","project_name":"Kype Muir Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.003763Z","start_date":"2019-03-28","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2019-03-25","target_commissioning_window_start_date":"2019-03-01","long_stop_date":"2021-03-01","initial_installed_capacity":"104.00","current_installed_capacity":"87.23","initial_strike_price":"82.50","current_strike_price":"120.28","latitude":"55.63075000","longitude":"-4.05600000","coordinates":"N: 55.642, -4.091\nE: 55.626, -4.011\nS: 55.615, -4.028\nW: 55.64, -4.094","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"15.60","capacity_whole_station":null,"polymorphic_ctype":6},{"id":210,"contract_id":"AAA-BRE-177","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Brenig Wind Limited","counterparty_registration_no":"06001931","counterparty_address":"Glebe Barn, Great Barrington, Burford, OX18 4US, United Kingdom","project_name":"Brenig Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.032234Z","start_date":"2019-03-29","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2019-03-29","target_commissioning_window_start_date":"2017-03-30","long_stop_date":"2020-03-28","initial_installed_capacity":"45.00","current_installed_capacity":"37.60","initial_strike_price":"79.23","current_strike_price":"116.96","latitude":"53.10775000","longitude":"-3.50225000","coordinates":"N: 53.119, -3.5\nE: 53.113, -3.49\nS: 53.095, -3.504\nW: 53.104, -3.515","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"7.40","capacity_whole_station":null,"polymorphic_ctype":6},{"id":227,"contract_id":"CAA-EAS-168","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"East Anglia One Limited","counterparty_registration_no":"07366753","counterparty_address":"3rd Floor, 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"EA 1, Phase 3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.045021Z","start_date":"2020-05-30","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2020-03-31","target_commissioning_window_start_date":"2019-11-30","long_stop_date":"2022-11-29","initial_installed_capacity":"250.00","current_installed_capacity":"248.812","initial_strike_price":"119.89","current_strike_price":"176.12","latitude":"52.29600000","longitude":"2.46400000","coordinates":"N: 52.39, 2.528\nE: 52.304, 2.571\nS: 52.193, 2.407\nW: 52.297, 2.35","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":249,"contract_id":"AAA-NAN-184","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Nanclach Limited","counterparty_registration_no":"05628358","counterparty_address":"27-28 Eastcastle Street, London, W1W 8DH, United Kingdom","project_name":"Nanclach Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.059209Z","start_date":"2019-10-01","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-10-31","target_commissioning_window_start_date":"2018-10-01","long_stop_date":"2020-09-30","initial_installed_capacity":"39.10","current_installed_capacity":"39.10","initial_strike_price":"82.50","current_strike_price":"121.79","latitude":"57.39025000","longitude":"-3.89700000","coordinates":"N: 57.4, -3.895\nE: 57.386, -3.884\nS: 57.383, -3.893\nW: 57.392, -3.916","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":61,"contract_id":"AAA-BAD-185","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"RWE Renewables UK Swindon Limited","counterparty_registration_no":"02550622","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Bad A Cheo Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.072407Z","start_date":"2019-03-31","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2019-03-31","target_commissioning_window_start_date":"2019-03-31","long_stop_date":"2021-03-30","initial_installed_capacity":"29.90","current_installed_capacity":"26.34","initial_strike_price":"82.50","current_strike_price":"120.46","latitude":"58.42350000","longitude":"-3.42550000","coordinates":"N: 58.43, -3.431\nE: 58.426, -3.418\nS: 58.408, -3.422\nW: 58.43, -3.431","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"3.25","capacity_whole_station":null,"polymorphic_ctype":6},{"id":83,"contract_id":"CAA-EAS-166","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"East Anglia One Limited","counterparty_registration_no":"07366753","counterparty_address":"3rd Floor, 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"EA 1, Phase 1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.083461Z","start_date":"2019-10-30","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-03-31","target_commissioning_window_start_date":"2018-03-31","long_stop_date":"2021-03-30","initial_installed_capacity":"179.00","current_installed_capacity":"172.786","initial_strike_price":"119.89","current_strike_price":"176.12","latitude":"52.19950000","longitude":"2.53175000","coordinates":"N: 52.238, 2.563\nE: 52.238, 2.563\nS: 52.088, 2.524\nW: 52.234, 2.477","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":116,"contract_id":"AAA-MYN-178","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"RWE Renewables UK Swindon Limited","counterparty_registration_no":"02550622","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Mynydd Y Gwair Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.121001Z","start_date":"2019-03-20","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-03-31","target_commissioning_window_start_date":"2018-03-31","long_stop_date":"2020-03-30","initial_installed_capacity":"40.00","current_installed_capacity":"32.215","initial_strike_price":"79.99","current_strike_price":"118.08","latitude":"51.75225000","longitude":"-3.94250000","coordinates":"N: 51.763, -3.942\nE: 51.747, -3.932\nS: 51.747, -3.932\nW: 51.752, -3.964","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"6.40","capacity_whole_station":null,"polymorphic_ctype":6},{"id":130,"contract_id":"AAA-SOL-181","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Solwaybank Energy Limited","counterparty_registration_no":"09275294","counterparty_address":"Beaufort Court, Egg Farm Lane, Kings Langley, WD4 8LR, United Kingdom","project_name":"Solwaybank Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.132798Z","start_date":"2020-11-27","expected_start_date":"2020-11-27","termination_date":null,"target_commissioning_date":"2019-03-29","target_commissioning_window_start_date":"2019-03-29","long_stop_date":"2021-03-28","initial_installed_capacity":"37.50","current_installed_capacity":"29.93","initial_strike_price":"82.50","current_strike_price":"121.79","latitude":"55.10275000","longitude":"-3.09825000","coordinates":"N: 55.124, -3.114\nE: 55.095, -3.064\nS: 55.085, -3.084\nW: 55.107, -3.131","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"7.50","capacity_whole_station":null,"polymorphic_ctype":6},{"id":217,"contract_id":"AAA-CLO-186","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"RWE Renewables UK Swindon Limited","counterparty_registration_no":"02550622","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Clocaenog Forest Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.155604Z","start_date":"2019-10-31","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-11-01","target_commissioning_window_start_date":"2018-11-01","long_stop_date":"2020-10-31","initial_installed_capacity":"96.00","current_installed_capacity":"95.68","initial_strike_price":"82.50","current_strike_price":"121.79","latitude":"53.07775000","longitude":"-3.47525000","coordinates":"N: 53.113, -3.479\nE: 53.057, -3.453\nS: 53.043, -3.475\nW: 53.098, -3.494","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":1,"contract_id":"AAA-ACH-183","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Achlachan Wind Farm LLP","counterparty_registration_no":"OC393612","counterparty_address":"34 Bradford Road, Brighouse, HD6 1RW, United Kingdom","project_name":"Achlachan Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.171646Z","start_date":"2019-04-08","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-10-31","target_commissioning_window_start_date":"2018-10-31","long_stop_date":"2020-10-31","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"82.50","current_strike_price":"121.79","latitude":"58.44700000","longitude":"-3.45825000","coordinates":"N: 58.453, -3.458\nE: 58.448, -3.441\nS: 58.441, -3.465\nW: 58.446, -3.469","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":195,"contract_id":"AAA-CAM-197","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Cambridgeshire County Council","counterparty_registration_no":"","counterparty_address":"Resources Directorate, New Shire Hall, Emery Crescent, Alconbury Weald, Huntingdon, PE28 4YE, United Kingdom","project_name":"Triangle Farm Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.183015Z","start_date":"2017-07-18","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2016-07-01","target_commissioning_window_start_date":"2016-07-01","long_stop_date":"2017-09-30","initial_installed_capacity":"12.00","current_installed_capacity":"10.90","initial_strike_price":"79.23","current_strike_price":"116.96","latitude":"52.57675000","longitude":"0.31575000","coordinates":"N: 52.33, 0.316\nE: 52.328, 0.321\nS: 53.323, 0.315\nW: 52.326, 0.311","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"1.10","capacity_whole_station":null,"polymorphic_ctype":6},{"id":168,"contract_id":"AR5-LIW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"LIMEKILN EXTENSION LIMITED","counterparty_registration_no":"10988722","counterparty_address":"16 West Borough, Wimborne, BH21 1NG, United Kingdom","project_name":"Limekiln Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.194451Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"106.00","current_installed_capacity":"106.00","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"58.53067250","longitude":"-3.74147250","coordinates":"N: 58.56097, -3.76125\nE: 58.52543, -3.69498\nS: 58.49409, -3.7271\nW: 58.5422, -3.78256","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":43,"contract_id":"AR5-RWS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"RAMPISHAM WOODS SOLAR PARK LIMITED","counterparty_registration_no":"09815614","counterparty_address":"35 And 35a The Maltings Lower Charlton Trading Estate, Shepton Mallet, BA4 5QE, United Kingdom","project_name":"Rampisham Woods Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.214160Z","start_date":"2025-12-14","expected_start_date":"2025-12-14","termination_date":null,"target_commissioning_date":"2025-04-01","target_commissioning_window_start_date":"2025-04-01","long_stop_date":"2026-12-14","initial_installed_capacity":"7.60","current_installed_capacity":"7.60","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"50.80925000","longitude":"-2.63600000","coordinates":"N: 50.812, -2.636\nE: 50.808, -2.633\nS: 50.807, -2.635\nW: 50.81, -2.64","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":128,"contract_id":"AAA-SNE-179","allocation_round":"Allocation Round 1","scheme":"CfD","counterparty_name":"Sneddon Law Community Wind Company Limited","counterparty_registration_no":"SC443267","counterparty_address":"Caledonian Exchange, 19 A Canning Street, Edinburgh, EH3 8HE, United Kingdom","project_name":"Sneddon Law Community Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 1, 29 August 2014","comment":"","updated_at":"2026-04-01T01:00:09.236439Z","start_date":"2024-04-04","expected_start_date":"2024-04-01","termination_date":null,"target_commissioning_date":"2017-06-30","target_commissioning_window_start_date":"2017-01-01","long_stop_date":"2025-04-08","initial_installed_capacity":"37.50","current_installed_capacity":"29.813","initial_strike_price":"79.99","current_strike_price":"118.08","latitude":"55.65650000","longitude":"-4.34050000","coordinates":"N: 55.665, -4.33\nE: 55.665, -4.33\nS: 55.645, -4.351\nW: 55.651, -4.351","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"7.50","capacity_whole_station":null,"polymorphic_ctype":6},{"id":33,"contract_id":"AR5-MGP-800","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"GEOTHERMAL ENGINEERING LIMITED","counterparty_registration_no":"06663174","counterparty_address":"United Downs Industrial Estate, St Day, Redruth, TR16 5HY, United Kingdom","project_name":"Manhay Geothermal Power Plant","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.277284Z","start_date":null,"expected_start_date":"2027-01-01","termination_date":null,"target_commissioning_date":"2027-01-01","target_commissioning_window_start_date":"2026-10-01","long_stop_date":"2028-10-01","initial_installed_capacity":"5.00","current_installed_capacity":"5.00","initial_strike_price":"119.00","current_strike_price":"175.67","latitude":"50.12525000","longitude":"-5.23625000","coordinates":"N: 50.126, -5.237\nE: 50.125, -5.234\nS: 50.124, -5.236\nW: 50.126, -5.238","technology_type":"Geothermal","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":34,"contract_id":"AR5-MIN-710","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 14 LTD","counterparty_registration_no":"12140396","counterparty_address":"First Floor Winston House, 349 Regents Park Road, London, N3 1DH, United Kingdom","project_name":"Minety","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.290940Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"47.50","current_installed_capacity":"47.50","initial_strike_price":"47.00","current_strike_price":"69.86","latitude":"51.60550000","longitude":"-1.99700000","coordinates":"N: 51.612, -2.003\nE: 51.604, -1.978\nS: 51.599, -1.993\nW: 51.607, -2.014","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":21,"contract_id":"AR5-EUM-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"ENERGYFARM UK MARGREE LLP","counterparty_registration_no":"OC436123","counterparty_address":"4330 Park Approach, Leeds, LS15 8GB, United Kingdom","project_name":"ENERGYFARM UK MARGREE LLP","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.316553Z","start_date":null,"expected_start_date":"2030-10-31","termination_date":null,"target_commissioning_date":"2029-10-31","target_commissioning_window_start_date":"2029-10-31","long_stop_date":"2031-10-31","initial_installed_capacity":"50.00","current_installed_capacity":"50.00","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"55.15200000","longitude":"-4.06850000","coordinates":"N: 55.177, -4.064\nE: 55.154, -4.038\nS: 55.127, -4.069\nW: 55.15, -4.103","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":52,"contract_id":"AR5-SWW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"RWE RENEWABLES UK ONSHORE WIND LIMITED","counterparty_registration_no":"03758407","counterparty_address":"Greenwood House Westwood Way, Westwood Business Park, Coventry, CV4 8PB, United Kingdom","project_name":"Strathy Wood Windfarm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.330030Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-04-01","initial_installed_capacity":"62.70","current_installed_capacity":"62.70","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"58.46575000","longitude":"-4.02475000","coordinates":"N: 58.484, -4.016\nE: 58.482, -4.001\nS: 58.447, -4.032\nW: 58.45, -4.05","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":38,"contract_id":"AR5-MME-500","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"MOR ENERGY LIMITED","counterparty_registration_no":"13832903","counterparty_address":"C/O Tocardo (Formally Aac Waterproofing), Gaerwen Industrial Estate, Stad Maes Rhydd, Gaerwen, LL60 6AZ, United Kingdom","project_name":"Morlais Mor Energy Zone GO3","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.348979Z","start_date":null,"expected_start_date":"2027-03-17","termination_date":null,"target_commissioning_date":"2026-08-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2028-04-01","initial_installed_capacity":"4.50","current_installed_capacity":"4.50","initial_strike_price":"198.00","current_strike_price":"292.29","latitude":"53.30950000","longitude":"-4.72000000","coordinates":"N: 53.313, -4.715\nE: 53.313, -4.713\nS: 53.306, -4.718\nW: 53.306, -4.734","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":35,"contract_id":"AR5-MOS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"OPDENERGY UK 6 LIMITED","counterparty_registration_no":"13029626","counterparty_address":"Grenville Court, Britwell Road, Burnham, SL1 8DF, United Kingdom","project_name":"Moorside Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.384911Z","start_date":null,"expected_start_date":"2029-10-30","termination_date":null,"target_commissioning_date":"2026-12-31","target_commissioning_window_start_date":"2026-10-31","long_stop_date":"2031-01-31","initial_installed_capacity":"24.15","current_installed_capacity":"20.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"54.06075000","longitude":"-2.76750000","coordinates":"N: 54.066, -2.771\nE: 54.057, -2.763\nS: 54.056, -2.765\nW: 54.064, -2.771","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_G","total_permitted_reduction_mw":"4.15","capacity_whole_station":null,"polymorphic_ctype":6},{"id":22,"contract_id":"AR5-EGH-710","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"ENSO GREEN HOLDINGS H LIMITED","counterparty_registration_no":"12767586","counterparty_address":"17th Floor Hylo, 103-105 Bunhill Row, London, EC1Y 8LZ, United Kingdom","project_name":"Enso Green Holdings H Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.399862Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"47.00","current_strike_price":"69.86","latitude":"51.08475000","longitude":"-2.99275000","coordinates":"N: 51.096, -2.994\nE: 51.081, -2.982\nS: 51.078, -2.99\nW: 51.084, -3.005","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":25,"contract_id":"AR5-GAS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SONNEDIX GAMMATON LIMITED","counterparty_registration_no":"08935081","counterparty_address":"90 Union Street, London, SE1 0NW, United Kingdom","project_name":"Gammaton Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.414740Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"28.57","current_installed_capacity":"28.57","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.00500000","longitude":"-4.13750000","coordinates":"N: 51.009, -4.132\nE: 51.008, -4.123\nS: 51, -4.145\nW: 51.003, -4.15","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":26,"contract_id":"AR5-HIN-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"LOW CARBON SOLAR PARK 8 LIMITED","counterparty_registration_no":"13094652","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Hinckley","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.436320Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2034-12-31","initial_installed_capacity":"35.00","current_installed_capacity":"35.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.52275000","longitude":"-1.39625000","coordinates":"N: 52.526, -1.393\nE: 52.523, -1.385\nS: 52.519, -1.403\nW: 52.523, -1.404","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":89,"contract_id":"AR5-GRW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"REG GREENBURN LIMITED","counterparty_registration_no":"SC508240","counterparty_address":"C/O Gillespie Macandrew Llp, 5 Atholl Crescent, Edinburgh, EH3 8EJ, United Kingdom","project_name":"Greenburn Wind Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.458699Z","start_date":null,"expected_start_date":"2029-03-14","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-15","long_stop_date":"2030-03-15","initial_installed_capacity":"63.00","current_installed_capacity":"63.00","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"55.40225000","longitude":"-4.27825000","coordinates":"N: 55.416, -4.277\nE: 55.408, -4.243\nS: 55.391, -4.29\nW: 55.394, -4.303","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":46,"contract_id":"AR5-SHA-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Fern Brook Solar Farm Limited","counterparty_registration_no":"13094454","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Shaftesbury","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.475651Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.03350000","longitude":"-2.24475000","coordinates":"N: 51.037, -2.247\nE: 51.035, -2.24\nS: 51.03, -2.244\nW: 51.032, -2.248","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":87,"contract_id":"AR5-ENG-710","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"ENSO GREEN HOLDINGS I LIMITED","counterparty_registration_no":"12758956","counterparty_address":"17th Floor HYLO, 103-105 Bunhill Row, London, EC1Y 8LZ, United Kingdom","project_name":"Enso Green Holdings I Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-06-12T01:00:07.077115Z","start_date":null,"expected_start_date":"2028-10-27","termination_date":null,"target_commissioning_date":"2028-10-30","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2029-10-30","initial_installed_capacity":"57.00","current_installed_capacity":"57.00","initial_strike_price":"47.00","current_strike_price":"69.86","latitude":"53.55525000","longitude":"-1.01700000","coordinates":"N: 53.56, -1.028\nE: 53.555, -0.995\nS: 53.547, -1.012\nW: 53.559, -1.033","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":263,"contract_id":"AR5-SOF-710","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SOAY LIMITED","counterparty_registration_no":"12896100","counterparty_address":"19th Floor 22 Bishopsgate, London, EC2N 4BQ, United Kingdom","project_name":"Soay Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-10-15T01:00:08.230763Z","start_date":null,"expected_start_date":"2027-07-30","termination_date":null,"target_commissioning_date":"2026-06-01","target_commissioning_window_start_date":"2026-06-01","long_stop_date":"2027-09-01","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"47.00","current_strike_price":"69.86","latitude":"53.90675000","longitude":"-0.83225000","coordinates":"N: 53.918, -0.839\nE: 53.899, -0.819\nS: 53.897, -0.821\nW: 53.913, -0.85","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":90,"contract_id":"AR5-HAR-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Feldon Vale Solar Farm Limited","counterparty_registration_no":"12644642","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Harbury","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.499900Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.19950000","longitude":"-1.43000000","coordinates":"N: 52.206, -1.436\nE: 52.196, -1.422\nS: 52.192, -1.425\nW: 52.204, -1.437","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":65,"contract_id":"AR5-BFS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"OPDENERGY UK 4 LIMITED","counterparty_registration_no":"13029631","counterparty_address":"Grenville Court, Britwell Road, Burnham, SL1 8DF, United Kingdom","project_name":"Black Flatts Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.519302Z","start_date":null,"expected_start_date":"2027-12-30","termination_date":null,"target_commissioning_date":"2027-09-30","target_commissioning_window_start_date":"2027-09-30","long_stop_date":"2028-12-30","initial_installed_capacity":"48.29","current_installed_capacity":"42.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.77125000","longitude":"-1.89725000","coordinates":"N: 52.776, -1.894\nE: 52.771, -1.889\nS: 52.767, -1.9\nW: 52.771, -1.906","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"6.29","capacity_whole_station":null,"polymorphic_ctype":6},{"id":67,"contract_id":"AR5-BRH-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BF16D BHF SOLAR LIMITED","counterparty_registration_no":"13352424","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"Brick House Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.534676Z","start_date":null,"expected_start_date":"2027-12-31","termination_date":null,"target_commissioning_date":"2027-12-31","target_commissioning_window_start_date":"2027-12-31","long_stop_date":"2029-03-31","initial_installed_capacity":"42.00","current_installed_capacity":"42.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.32950000","longitude":"-2.63325000","coordinates":"N: 52.334, -2.633\nE: 52.33, -2.623\nS: 52.324, -2.635\nW: 52.33, -2.642","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":513,"contract_id":"AR7-BBP-011","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BERWICK BANK B LIMITED","counterparty_registration_no":"13884182","counterparty_address":"No. 1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Berwick Bank Phase B (Phase 1)","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-25T01:00:06.429587Z","start_date":null,"expected_start_date":"2031-03-31","termination_date":null,"target_commissioning_date":"2031-03-31","target_commissioning_window_start_date":"2031-03-31","long_stop_date":"2034-03-30","initial_installed_capacity":"460.00","current_installed_capacity":"460.00","initial_strike_price":"89.49","current_strike_price":"95.23","latitude":"56.24850000","longitude":"-1.74700000","coordinates":"N: 56.287, -1.75\nE: 56.217, -1.644\nS: 56.203, -1.692\nW: 56.287, -1.902","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":149,"contract_id":"AR5-CGW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"CLASH GOUR WINDFARM HOLDINGS LIMITED","counterparty_registration_no":"SC603809","counterparty_address":"C/O Edf Energy Renewables Limited Atria One, 144 Morrison Street, Edinburgh, EH3 8EX, United Kingdom","project_name":"Clash Gour Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.595700Z","start_date":null,"expected_start_date":"2029-10-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2031-10-30","initial_installed_capacity":"168.75","current_installed_capacity":"168.75","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"57.49850000","longitude":"-3.54725000","coordinates":"N: 57.531, -3.602\nE: 57.513, -3.413\nS: 57.448, -3.566\nW: 57.502, -3.608","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":131,"contract_id":"AR5-STO-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 26 LIMITED","counterparty_registration_no":"12433920","counterparty_address":"First Floor Winston House, 349 Regents Park Road, London, N3 1DH, United Kingdom","project_name":"Stoneshollow","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.608645Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.65425000","longitude":"-1.36475000","coordinates":"N: 52.662, -1.367\nE: 52.652, -1.339\nS: 52.649, -1.366\nW: 52.654, -1.387","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":170,"contract_id":"AR5-LOH-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BF33C LHF SOLAR LIMITED","counterparty_registration_no":"13272677","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"Low Horton","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-10-16T01:00:09.644935Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2028-07-01","initial_installed_capacity":"42.10","current_installed_capacity":"40.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"55.10975000","longitude":"-1.55425000","coordinates":"N: 55.12, -1.55\nE: 55.115, -1.547\nS: 55.097, -1.556\nW: 55.107, -1.564","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"2.10","capacity_whole_station":null,"polymorphic_ctype":6},{"id":172,"contract_id":"AR5-MEA-510","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"MeyGen PLC","counterparty_registration_no":"SC347501","counterparty_address":"26 Dublin Street, Edinburgh, EH3 6NN, United Kingdom","project_name":"MeyGen AR52","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.642735Z","start_date":null,"expected_start_date":"2031-06-30","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2032-12-12","initial_installed_capacity":"5.60","current_installed_capacity":"5.60","initial_strike_price":"198.00","current_strike_price":"294.31","latitude":"58.65950000","longitude":"-3.13150000","coordinates":"N: 58.663, -3.141\nE: 58.661, -3.11\nS: 58.655, -3.132\nW: 58.659, -3.143","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":103,"contract_id":"AR5-LAI-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"LAIRG II LLP","counterparty_registration_no":"OC428012","counterparty_address":"4330 Park Approach, Leeds, LS15 8GB, United Kingdom","project_name":"LAIRG II LLP","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-11-04T01:00:05.477323Z","start_date":null,"expected_start_date":"2026-12-01","termination_date":null,"target_commissioning_date":"2026-10-31","target_commissioning_window_start_date":"2026-10-31","long_stop_date":"2028-10-31","initial_installed_capacity":"50.00","current_installed_capacity":"50.00","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"57.99200000","longitude":"-4.37575000","coordinates":"N: 58.001, -4.398\nE: 57.994, -4.319\nS: 57.98, -4.382\nW: 57.993, -4.404","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":109,"contract_id":"AR5-MEY-510","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"MeyGen PLC","counterparty_registration_no":"SC347501","counterparty_address":"26 Dublin Street, Edinburgh, EH3 6NN, United Kingdom","project_name":"MeyGen AR51","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.676656Z","start_date":null,"expected_start_date":"2031-06-30","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2032-12-12","initial_installed_capacity":"11.80","current_installed_capacity":"11.80","initial_strike_price":"198.00","current_strike_price":"294.31","latitude":"58.65950000","longitude":"-3.13150000","coordinates":"N: 58.663, -3.141\nE: 58.661, -3.11\nS: 58.655, -3.132\nW: 58.659, -3.143","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":125,"contract_id":"AR5-SAB-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Sandon Brook Solar Farm Limited","counterparty_registration_no":"13092062","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Sandon Brook","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.692069Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"41.70","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.66675000","longitude":"0.52900000","coordinates":"N: 51.672, 0.526\nE: 51.667, 0.538\nS: 51.658, 0.529\nW: 51.67, 0.523","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"8.20","capacity_whole_station":null,"polymorphic_ctype":6},{"id":187,"contract_id":"AR5-PRI-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Primrose Solar Farm Limited","counterparty_registration_no":"13828123","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Primrose","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.703650Z","start_date":null,"expected_start_date":"2028-04-03","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"17.60","current_installed_capacity":"17.60","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.91800000","longitude":"1.15900000","coordinates":"N: 51.92, 1.157\nE: 51.918, 1.167\nS: 51.914, 1.159\nW: 51.92, 1.153","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":140,"contract_id":"AR5-ABW-610","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Aberarder Wind Farm LLP","counterparty_registration_no":"OC398487","counterparty_address":"1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Aberarder Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.729629Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"57.25675000","longitude":"-4.24075000","coordinates":"N: 57.264, -4.251\nE: 57.256, -4.219\nS: 57.248, -4.23\nW: 57.259, -4.263","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":143,"contract_id":"AR5-ANG-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"PARC SOLAR TRAFFWLL LIMITED","counterparty_registration_no":"11603272","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Anglesey","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.741495Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"35.00","current_installed_capacity":"28.50","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"53.26375000","longitude":"-4.50625000","coordinates":"N: 53.272, -4.526\nE: 53.261, -4.479\nS: 53.253, -4.492\nW: 53.269, -4.528","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"6.50","capacity_whole_station":null,"polymorphic_ctype":6},{"id":100,"contract_id":"AR5-HUS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"NEXTPOWER HULAM LIMITED","counterparty_registration_no":"08936354","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"Hulam Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.769421Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"54.72850000","longitude":"-1.31825000","coordinates":"N: 54.733, -1.316\nE: 54.728, -1.307\nS: 54.724, -1.322\nW: 54.729, -1.328","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":135,"contract_id":"AR5-WIS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SONNEDIX WINKBURN LIMITED","counterparty_registration_no":"08939434","counterparty_address":"90 Union Street, London, SE1 0NW, United Kingdom","project_name":"Winkburn Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.782811Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"32.65","current_installed_capacity":"32.65","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"53.12175000","longitude":"-0.96475000","coordinates":"N: 53.13, -0.975\nE: 53.115, -0.952\nS: 53.114, -0.956\nW: 53.128, -0.976","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":102,"contract_id":"AR5-KIL-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Jafa Solar Farm Limited","counterparty_registration_no":"13353524","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Kings Lynn","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.794689Z","start_date":null,"expected_start_date":"2028-04-03","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.69050000","longitude":"0.74025000","coordinates":"N: 52.696, 0.739\nE: 52.693, 0.753\nS: 52.684, 0.735\nW: 52.689, 0.734","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":110,"contract_id":"AR5-MAR-510","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"MeyGen PLC","counterparty_registration_no":"SC347501","counterparty_address":"26 Dublin Street, Edinburgh, EH3 6NN, United Kingdom","project_name":"MeyGen AR54","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.805531Z","start_date":null,"expected_start_date":"2031-06-30","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2032-12-12","initial_installed_capacity":"1.60","current_installed_capacity":"1.60","initial_strike_price":"198.00","current_strike_price":"294.31","latitude":"58.65950000","longitude":"-3.13150000","coordinates":"N: 58.663, -3.141\nE: 58.661, -3.11\nS: 58.655, -3.132\nW: 58.659, -3.143","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":145,"contract_id":"AR5-BES-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BERRYHILL SOLAR FARM LIMITED","counterparty_registration_no":"SC677678","counterparty_address":"c/o Womble Bond Dickinson (UK) LLP 2 Semple Street Edinburgh, Edinburgh, EH3 8BL, United Kingdom","project_name":"Berryhill Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.828281Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-02-15","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"45.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"56.49000000","longitude":"-3.13500000","coordinates":"N: 56.497, -3.147\nE: 56.487, -3.117\nS: 56.487, -3.126\nW: 56.489, -3.15","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"4.90","capacity_whole_station":null,"polymorphic_ctype":6},{"id":122,"contract_id":"AR5-PGP-800","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"GEOTHERMAL ENGINEERING LIMITED","counterparty_registration_no":"06663174","counterparty_address":"United Downs Industrial Estate, St Day, Redruth, TR16 5HY, United Kingdom","project_name":"Penhallow Geothermal Power Plant","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.844195Z","start_date":null,"expected_start_date":"2027-10-01","termination_date":null,"target_commissioning_date":"2027-10-01","target_commissioning_window_start_date":"2027-07-01","long_stop_date":"2029-07-01","initial_installed_capacity":"5.00","current_installed_capacity":"5.00","initial_strike_price":"119.00","current_strike_price":"175.67","latitude":"50.31550000","longitude":"-5.14000000","coordinates":"N: 50.317, -5.141\nE: 50.315, -5.138\nS: 50.315, -5.14\nW: 50.315, -5.141","technology_type":"Geothermal","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":248,"contract_id":"AR5-MMG-500","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"MAGALLANES TIDAL ENERGY LTD","counterparty_registration_no":"SC661403","counterparty_address":"Unit 2, Warness Park Hatston Pier Road, Crowness Business Park, Kirkwall, KW15 1ZL, United Kingdom","project_name":"Morlais Magallanes GR3 Extension","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.867955Z","start_date":null,"expected_start_date":"2028-04-30","termination_date":null,"target_commissioning_date":"2028-03-30","target_commissioning_window_start_date":"2027-06-01","long_stop_date":"2029-06-01","initial_installed_capacity":"3.00","current_installed_capacity":"3.00","initial_strike_price":"198.00","current_strike_price":"292.29","latitude":"53.29150000","longitude":"-4.72050000","coordinates":"N: 53.296, -4.71\nE: 53.287, -4.704\nS: 53.287, -4.734\nW: 53.296, -4.734","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":254,"contract_id":"AR5-PLI-600","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"PEARIE LAW II WIND FARM LTD","counterparty_registration_no":"13888324","counterparty_address":"35 Westgate, Huddersfield, HD1 1PA, United Kingdom","project_name":"Pearie Law II Wind Farm Ltd","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.906428Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2032-09-30","initial_installed_capacity":"20.70","current_installed_capacity":"20.70","initial_strike_price":"52.29","current_strike_price":"77.19","latitude":"55.81150000","longitude":"-3.58175000","coordinates":"N: 55.815, -3.578\nE: 55.812, -3.571\nS: 55.808, -3.587\nW: 55.811, -3.591","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":160,"contract_id":"AR5-GMS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SPRING DEV 05 LIMITED","counterparty_registration_no":"11977261","counterparty_address":"Leytonstone House, 3 Hanbury Drive, London, E11 1GA, United Kingdom","project_name":"Galton Manor Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.919353Z","start_date":null,"expected_start_date":"2029-06-29","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"50.67550000","longitude":"-2.30325000","coordinates":"N: 50.682, -2.3\nE: 50.679, -2.3\nS: 50.669, -2.304\nW: 50.672, -2.309","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":161,"contract_id":"AR5-GOS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SONNEDIX GONERBY LIMITED","counterparty_registration_no":"08938744","counterparty_address":"90 Union Street, London, SE1 0NW, United Kingdom","project_name":"Gonerby Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.935099Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.95600000","longitude":"-0.67175000","coordinates":"N: 52.961, -0.67\nE: 52.957, -0.659\nS: 52.95, -0.675\nW: 52.956, -0.683","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":208,"contract_id":"AR5-BRS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BRACON ASH SOLAR LIMITED","counterparty_registration_no":"10327437","counterparty_address":"Luminous Energy (Fr), Hartham Park, Corsham, SN13 0RP, United Kingdom","project_name":"Bracon Ash Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.969238Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2028-07-01","initial_installed_capacity":"6.69","current_installed_capacity":"5.376","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.56225000","longitude":"1.21225000","coordinates":"N: 52.566, 1.21\nE: 52.562, 1.218\nS: 52.559, 1.213\nW: 52.562, 1.208","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"1.314","capacity_whole_station":null,"polymorphic_ctype":6},{"id":197,"contract_id":"AR5-VWA-910","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Viking Energy Wind Farm LLP","counterparty_registration_no":"SO305400","counterparty_address":"Stewart Building Esplanade, Lerwick, Shetland, ZE1 0LL, United Kingdom","project_name":"Viking Wind Farm AR5","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:09.981963Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"223.60","current_installed_capacity":"223.60","initial_strike_price":"52.29","current_strike_price":"77.73","latitude":"60.29225000","longitude":"-1.25875000","coordinates":"N: 60.351, -1.206\nE: 60.299, -1.15\nS: 60.236, -1.319\nW: 60.283, -1.36","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":198,"contract_id":"AR5-WHW-600","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"WATSON HEAD WIND FARM LIMITED","counterparty_registration_no":"13052079","counterparty_address":"35 Westgate, Huddersfield, HD1 1PA, United Kingdom","project_name":"Watson Head Wind Farm Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:10.009975Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2029-04-01","initial_installed_capacity":"8.40","current_installed_capacity":"8.40","initial_strike_price":"52.29","current_strike_price":"77.19","latitude":"55.76900000","longitude":"-3.83050000","coordinates":"N: 55.772, -3.831\nE: 55.768, -3.825\nS: 55.767, -3.827\nW: 55.769, -3.839","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":242,"contract_id":"AR5-LAS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"SONNEDIX LAWNS LIMITED","counterparty_registration_no":"08769590","counterparty_address":"90 Union Street, London, SE1 0NW, United Kingdom","project_name":"Lawns Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:10.026249Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"53.77325000","longitude":"-2.97000000","coordinates":"N: 53.778, -2.967\nE: 53.772, -2.966\nS: 53.77, -2.973\nW: 53.773, -2.974","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_G","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":148,"contract_id":"AR5-BUH-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BF33E BHF SOLAR LIMITED","counterparty_registration_no":"13476472","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"Burnt House Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-10-16T01:00:09.724297Z","start_date":null,"expected_start_date":"2028-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2028-07-01","initial_installed_capacity":"42.10","current_installed_capacity":"40.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"55.14075000","longitude":"-1.62550000","coordinates":"N: 55.148, -1.627\nE: 55.142, -1.618\nS: 55.133, -1.625\nW: 55.14, -1.632","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"2.10","capacity_whole_station":null,"polymorphic_ctype":6},{"id":255,"contract_id":"AR5-PES-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"PERADON SOLAR FARM LIMITED","counterparty_registration_no":"12411145","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"Peradon Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:10.058740Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2028-07-01","initial_installed_capacity":"49.00","current_installed_capacity":"49.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"50.80550000","longitude":"-3.34325000","coordinates":"N: 50.814, -3.34\nE: 50.8, -3.334\nS: 50.8, -3.337\nW: 50.808, -3.362","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":200,"contract_id":"AR5-WOS-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"WOODINGTON SOLAR LIMITED","counterparty_registration_no":"08625531","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"WOODINGTON SOLAR LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:10.094295Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"48.00","current_installed_capacity":"44.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"50.99125000","longitude":"-1.56325000","coordinates":"N: 50.995, -1.553\nE: 50.993, -1.552\nS: 50.986, -1.572\nW: 50.991, -1.576","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"4.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":261,"contract_id":"AR5-SAW-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"Long Meadow Solar Farm Limited","counterparty_registration_no":"13091904","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Saffron Walden","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:10.112911Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"12.00","current_installed_capacity":"12.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"52.00800000","longitude":"0.30000000","coordinates":"N: 52.014, 0.299\nE: 52.003, 0.304\nS: 52.003, 0.303\nW: 52.012, 0.294","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":514,"contract_id":"AR7-GWL-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"GWENLAIS SOLAR LIMITED","counterparty_registration_no":"14407914","counterparty_address":"22 Grosvenor Gardens, London, SW1W 0DH, United Kingdom","project_name":"GWL25","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:07.314584Z","start_date":null,"expected_start_date":"2027-09-30","termination_date":null,"target_commissioning_date":"2027-09-30","target_commissioning_window_start_date":"2027-09-01","long_stop_date":"2029-08-31","initial_installed_capacity":"16.26","current_installed_capacity":"16.26","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"51.69625000","longitude":"-4.01800000","coordinates":"N: 51.7, -4.014\nE: 51.697, -4.011\nS: 51.691, -4.02\nW: 51.697, -4.027","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":4,"contract_id":"AR5-BBW-600","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"BB2 WIND FARM LIMITED","counterparty_registration_no":"12280775","counterparty_address":"19th Floor 22 Bishopsgate, London, EC2N 4BQ, United Kingdom","project_name":"BB2 Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-09-11T01:00:06.647239Z","start_date":null,"expected_start_date":"2029-09-01","termination_date":null,"target_commissioning_date":"2026-07-01","target_commissioning_window_start_date":"2026-07-01","long_stop_date":"2028-07-01","initial_installed_capacity":"43.20","current_installed_capacity":"43.20","initial_strike_price":"52.29","current_strike_price":"77.19","latitude":"57.48250000","longitude":"-3.50700000","coordinates":"N: 57.498, -3.51\nE: 57.476, -3.492\nS: 57.476, -3.492\nW: 57.48, -3.534","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":216,"contract_id":"AR5-CLA-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"THORPE PARK SOLAR FARM LIMITED","counterparty_registration_no":"13097982","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Clacton","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-09-12T01:00:09.485442Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.83975000","longitude":"1.17650000","coordinates":"N: 51.845, 1.166\nE: 51.837, 1.19\nS: 51.832, 1.184\nW: 51.845, 1.166","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":167,"contract_id":"AR5-LAG-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"GREENTECH INVEST UK (2) LIMITED","counterparty_registration_no":"12972553","counterparty_address":"Challenge House, Sherwood Drive, Bletchley, Milton Keynes, MK3 6DP, United Kingdom","project_name":"Land at Guston Court Farm (Chalkpit)","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-10-23T01:00:05.261627Z","start_date":null,"expected_start_date":"2027-01-02","termination_date":null,"target_commissioning_date":"2026-09-30","target_commissioning_window_start_date":"2025-01-02","long_stop_date":"2027-02-20","initial_installed_capacity":"17.00","current_installed_capacity":"17.00","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"51.15525000","longitude":"1.33450000","coordinates":"N: 51.159, 1.339\nE: 51.158, 1.343\nS: 51.151, 1.334\nW: 51.153, 1.322","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":157,"contract_id":"AR5-EUG-600","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"ENERGYFARM UK GARBET LLP","counterparty_registration_no":"OC429448","counterparty_address":"4330 Park Approach, Leeds, LS15 8GB, United Kingdom","project_name":"ENERGYFARM UK GARBET LLP","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-11-04T01:00:05.590426Z","start_date":null,"expected_start_date":"2027-04-30","termination_date":null,"target_commissioning_date":"2026-10-31","target_commissioning_window_start_date":"2026-10-31","long_stop_date":"2028-10-31","initial_installed_capacity":"46.20","current_installed_capacity":"39.90","initial_strike_price":"52.29","current_strike_price":"77.19","latitude":"57.42125000","longitude":"-3.03450000","coordinates":"N: 57.444, -3.044\nE: 57.44, -2.992\nS: 57.398, -3.039\nW: 57.403, -3.063","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"6.30","capacity_whole_station":null,"polymorphic_ctype":6},{"id":29,"contract_id":"AR4-ICP-013","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"INCH CAPE OFFSHORE LIMITED","counterparty_registration_no":"SC373173","counterparty_address":"Ground Floor, New Clarendon, 114-116 George Street, Edinburgh, EH2 4LH, United Kingdom","project_name":"Inch Cape Phase 3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-05-08T01:00:07.542527Z","start_date":null,"expected_start_date":"2031-03-30","termination_date":null,"target_commissioning_date":"2029-03-30","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2031-03-31","initial_installed_capacity":"405.00","current_installed_capacity":"300.00","initial_strike_price":"37.35","current_strike_price":"50.14","latitude":"56.54870000","longitude":"-2.21120000","coordinates":"N: 56.5942, -2.169\nE: 56.5838, -2.1593\nS: 56.4776, -2.2423\nW: 56.5392, -2.2742","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_N","total_permitted_reduction_mw":"105.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":219,"contract_id":"AR5-COT-700","allocation_round":"Allocation Round 5","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 6 LTD","counterparty_registration_no":"11761762","counterparty_address":"First Floor Winston House, 349 Regents Park Road, London, N3 1DH, United Kingdom","project_name":"Cotmoor","base_year":2012,"agreement_type":"Generic","contract_version":"Version 5, 16 March 2023","comment":"","updated_at":"2026-04-01T01:00:10.172533Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"47.00","current_strike_price":"69.38","latitude":"53.06475000","longitude":"-0.98650000","coordinates":"N: 53.072, -0.994\nE: 53.059, -0.969\nS: 53.058, -0.981\nW: 53.07, -1.002","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":72,"contract_id":"AR4-CLH-710","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"CLEVE HILL SOLAR PARK LIMITED","counterparty_registration_no":"08904850","counterparty_address":"1030 Centre Park, Slutchers Lane, Warrington, WA1 1QL, United Kingdom","project_name":"Cleve Hill Solar Project","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.183383Z","start_date":"2025-11-05","expected_start_date":"2025-11-03","termination_date":null,"target_commissioning_date":"2024-03-31","target_commissioning_window_start_date":"2024-03-31","long_stop_date":"2025-12-19","initial_installed_capacity":"112.00","current_installed_capacity":"109.79","initial_strike_price":"45.99","current_strike_price":"62.99","latitude":"51.33750000","longitude":"0.92625000","coordinates":"N: 51.346, 0.939\nE: 51.337, 0.952\nS: 51.33, 0.917\nW: 51.337, 0.897","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_J","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":58,"contract_id":"AR4-WFR-710","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 13 LIMITED","counterparty_registration_no":"12140364","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Wick Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.246374Z","start_date":null,"expected_start_date":"2027-01-31","termination_date":null,"target_commissioning_date":"2026-01-01","target_commissioning_window_start_date":"2026-01-01","long_stop_date":"2028-04-30","initial_installed_capacity":"49.99","current_installed_capacity":"49.99","initial_strike_price":"45.99","current_strike_price":"62.99","latitude":"51.40350000","longitude":"-2.14225000","coordinates":"N: 51.416, -2.138\nE: 51.41, -2.129\nS: 51.392, -2.148\nW: 51.396, -2.154","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":201,"contract_id":"AR4-AWF-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SCOTTISHPOWER RENEWABLES (UK) LIMITED","counterparty_registration_no":"NI028425","counterparty_address":"The Soloist, 1 Lanyon Place, Belfast, BT1 3LP, United Kingdom","project_name":"Arecleoch Wind Farm Extension","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.284760Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2026-03-31","target_commissioning_window_start_date":"2026-03-31","long_stop_date":"2028-11-15","initial_installed_capacity":"74.10","current_installed_capacity":"74.10","initial_strike_price":"42.47","current_strike_price":"57.75","latitude":"55.08550000","longitude":"-4.83700000","coordinates":"N: 55.103, -4.859\nE: 55.084, -4.801\nS: 55.063, -4.819\nW: 55.092, -4.869","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":141,"contract_id":"AR4-ASF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"ALFRETON SOLAR LIMITED","counterparty_registration_no":"13730231","counterparty_address":"5 NEW STREET SQUARE, London, EC4A 3TW, United Kingdom","project_name":"Alfreton Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.330681Z","start_date":"2025-01-22","expected_start_date":"2025-01-22","termination_date":null,"target_commissioning_date":"2023-10-26","target_commissioning_window_start_date":"2023-10-25","long_stop_date":"2025-01-25","initial_installed_capacity":"19.65","current_installed_capacity":"14.576","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.10750000","longitude":"-1.37725000","coordinates":"N: 53.11, -1.378\nE: 53.108, -1.373\nS: 53.104, -1.375\nW: 53.108, -1.383","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"4.40","capacity_whole_station":null,"polymorphic_ctype":6},{"id":99,"contract_id":"AR4-HRN-010","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"ORSTED HORNSEA PROJECT THREE (UK) LIMITED","counterparty_registration_no":"08584210","counterparty_address":"5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Project Three Offshore Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.374257Z","start_date":null,"expected_start_date":"2028-03-01","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"2852.00","current_installed_capacity":"2146.10","initial_strike_price":"37.35","current_strike_price":"50.14","latitude":"53.83239750","longitude":"2.51089750","coordinates":"N: 53.97611, 2.23572\nE: 53.689, 2.793\nS: 53.689, 2.793\nW: 53.97548, 2.22187","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_A","total_permitted_reduction_mw":"705.90","capacity_whole_station":null,"polymorphic_ctype":6},{"id":106,"contract_id":"AR4-MFP-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"BL SOLAR 9 (MANOR FARM) LIMITED","counterparty_registration_no":"13708253","counterparty_address":"Ham Farm Main Road, Bosham, Chichester, PO18 8EH, United Kingdom","project_name":"Manor Farm PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-09-02T01:00:09.466306Z","start_date":null,"expected_start_date":"2027-07-20","termination_date":null,"target_commissioning_date":"2025-09-30","target_commissioning_window_start_date":"2025-09-30","long_stop_date":"2028-07-31","initial_installed_capacity":"18.50","current_installed_capacity":"15.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"50.81525000","longitude":"-0.68450000","coordinates":"N: 50.82, -0.684\nE: 50.813, -0.68\nS: 50.813, -0.686\nW: 50.815, -0.688","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"3.50","capacity_whole_station":null,"polymorphic_ctype":6},{"id":55,"contract_id":"AR4-TSF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SPRING DEV 02 LIMITED","counterparty_registration_no":"11977074","counterparty_address":"Leytonstone House, 3 Hanbury Drive, London, E11 1GA, United Kingdom","project_name":"Tycroes solar farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-08-11T01:00:05.217374Z","start_date":"2026-06-30","expected_start_date":"2026-06-30","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"42.10","current_installed_capacity":"30.95","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.76475000","longitude":"-4.04700000","coordinates":"N: 51.772, -4.029\nE: 51.764, -4.023\nS: 51.76, -4.067\nW: 51.763, -4.069","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_K","total_permitted_reduction_mw":"10.525","capacity_whole_station":null,"polymorphic_ctype":6},{"id":78,"contract_id":"AR4-DVR-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 3 LTD","counterparty_registration_no":"11761606","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Doverdale","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-05-02T01:00:06.184376Z","start_date":"2026-04-01","expected_start_date":"2026-03-31","termination_date":null,"target_commissioning_date":"2025-03-01","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2026-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.30250000","longitude":"-2.21250000","coordinates":"N: 52.307, -2.209\nE: 52.304, -2.207\nS: 52.298, -2.211\nW: 52.301, -2.223","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":118,"contract_id":"AR4-NXT-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"NEXTPOWER HATHERDEN LIMITED","counterparty_registration_no":"12147109","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"Hatherden Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-10-31T01:00:06.991200Z","start_date":null,"expected_start_date":"2026-11-15","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-12-30","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.23675000","longitude":"-1.51850000","coordinates":"N: 51.246, -1.522\nE: 51.234, -1.512\nS: 51.231, -1.514\nW: 51.236, -1.526","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":92,"contract_id":"AR4-HSF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"KS SPV 47 LIMITED","counterparty_registration_no":"08622176","counterparty_address":"14 High Cross, Truro, TR1 2AJ, United Kingdom","project_name":"Hasland Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-09-18T01:00:05.435714Z","start_date":null,"expected_start_date":"2027-05-01","termination_date":null,"target_commissioning_date":"2026-02-01","target_commissioning_window_start_date":"2026-02-01","long_stop_date":"2027-05-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.21625000","longitude":"-1.38650000","coordinates":"N: 53.226, -1.392\nE: 53.209, -1.378\nS: 53.209, -1.378\nW: 53.221, -1.398","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":39,"contract_id":"AR4-NEX-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"NEXTPOWER PENTLOW LIMITED","counterparty_registration_no":"12149394","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"NEXTPOWER PENTLOW LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-06-27T01:00:06.642599Z","start_date":"2026-06-24","expected_start_date":"2026-06-24","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.07850000","longitude":"0.66525000","coordinates":"N: 52.081, 0.669\nE: 52.08, 0.669\nS: 52.075, 0.663\nW: 52.078, 0.66","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":154,"contract_id":"AR4-CHS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"Sonnedix  Cowley Limited","counterparty_registration_no":"08751534","counterparty_address":"90 Union Street, London, SE1 0NW, United Kingdom","project_name":"Cowley House Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-09-10T01:00:09.192117Z","start_date":null,"expected_start_date":"2027-03-01","termination_date":null,"target_commissioning_date":"2025-01-01","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2027-03-13","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"54.63425000","longitude":"-1.39975000","coordinates":"N: 54.639, -1.397\nE: 54.635, -1.39\nS: 54.629, -1.402\nW: 54.634, -1.41","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":42,"contract_id":"AR4-OSF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"OULTON SOLAR LIMITED","counterparty_registration_no":"09940609","counterparty_address":"2nd Floor, 2 City Place Beehive Ring Road, Gatwick, RH6 0PA, United Kingdom","project_name":"Oulton Solar Farm Phase 2","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"LCCC Contract Management has estimated the expected start date for this project","updated_at":"2026-09-02T01:00:09.523675Z","start_date":"2026-09-01","expected_start_date":"2026-09-01","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-09-01","initial_installed_capacity":"6.00","current_installed_capacity":"6.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.79900000","longitude":"1.18100000","coordinates":"N: 52.801, 1.182\nE: 52.798, 1.183\nS: 52.798, 1.182\nW: 52.799, 1.177","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":220,"contract_id":"AR4-CSP-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"EEB16 LIMITED","counterparty_registration_no":"10789260","counterparty_address":"Peninsula House, Rydon Lane, Exeter, EX2 7HR, United Kingdom","project_name":"Cullerlie Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"The Expected Start Date is under review by LCCC.","updated_at":"2026-09-12T01:00:09.769197Z","start_date":null,"expected_start_date":"2026-06-30","termination_date":"2026-08-28","target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"8.75","current_installed_capacity":"8.75","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"57.11450000","longitude":"-2.36775000","coordinates":"N: 57.117, -2.362\nE: 57.114, -2.361\nS: 57.113, -2.374\nW: 57.114, -2.374","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":75,"contract_id":"AR4-CWS-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"CUMBERHEAD WEST WIND FARM LTD.","counterparty_registration_no":"SC535501","counterparty_address":"320 St. Vincent Street, Glasgow, G2 5AD, United Kingdom","project_name":"Cumberhead West","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-11-04T01:00:05.690225Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2028-12-31","initial_installed_capacity":"119.70","current_installed_capacity":"113.20","initial_strike_price":"42.47","current_strike_price":"57.75","latitude":"55.58500000","longitude":"-3.98275000","coordinates":"N: 55.609, -3.967\nE: 55.59, -3.952\nS: 55.564, -3.998\nW: 55.577, -4.014","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"6.50","capacity_whole_station":null,"polymorphic_ctype":6},{"id":156,"contract_id":"AR4-EAS-013","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"EAST ANGLIA THREE LIMITED","counterparty_registration_no":"08141208","counterparty_address":"3rd Floor, 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"EA3, Phase 3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.395737Z","start_date":null,"expected_start_date":"2029-03-30","termination_date":null,"target_commissioning_date":"2029-03-30","target_commissioning_window_start_date":"2029-03-30","long_stop_date":"2032-03-30","initial_installed_capacity":"505.60","current_installed_capacity":"390.03","initial_strike_price":"37.35","current_strike_price":"50.14","latitude":"52.69667500","longitude":"2.81221000","coordinates":"N: 52.76031, 2.8677\nE: 52.6707, 2.86273\nS: 52.60275, 2.75903\nW: 52.75294, 2.75938","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_A","total_permitted_reduction_mw":"115.57","capacity_whole_station":null,"polymorphic_ctype":6},{"id":175,"contract_id":"AR4-MRY-010","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"MORAY OFFSHORE WINDFARM (WEST) LIMITED","counterparty_registration_no":"10515140","counterparty_address":"Octagon Point, 5 Cheapside, London, EC2V 6AA, United Kingdom","project_name":"Moray West Offshore Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.427931Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"294.00","current_installed_capacity":"220.50","initial_strike_price":"37.35","current_strike_price":"50.14","latitude":"58.10300000","longitude":"-2.98321250","coordinates":"N: 58.1321, -2.98231\nE: 58.1286, -2.93476\nS: 58.0702, -2.98241\nW: 58.0811, -3.03337","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_P","total_permitted_reduction_mw":"73.50","capacity_whole_station":null,"polymorphic_ctype":6},{"id":105,"contract_id":"AR4-LYR-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"LAYER SOLAR FARM LIMITED","counterparty_registration_no":"12431237","counterparty_address":"Oxygen House Grenadier Road, Exeter Business Park, Exeter, EX1 3LH, United Kingdom","project_name":"Layer","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.491342Z","start_date":"2025-07-15","expected_start_date":"2025-06-30","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"45.00","current_installed_capacity":"45.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.84450000","longitude":"0.84225000","coordinates":"N: 51.85, 0.845\nE: 51.846, 0.85\nS: 51.834, 0.838\nW: 51.848, 0.836","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":239,"contract_id":"AR4-ICP-011","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"INCH CAPE OFFSHORE LIMITED","counterparty_registration_no":"SC373173","counterparty_address":"Ground Floor, New Clarendon, 114-116 George Street, Edinburgh, EH2 4LH, United Kingdom","project_name":"Inch Cape Phase 1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-05-08T01:00:07.792982Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2029-04-01","initial_installed_capacity":"270.00","current_installed_capacity":"210.00","initial_strike_price":"37.35","current_strike_price":"50.14","latitude":"56.45170000","longitude":"-2.18155000","coordinates":"N: 56.4776, -2.2423\nE: 56.438, -2.0814\nS: 56.4226, -2.126\nW: 56.4686, -2.2765","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_N","total_permitted_reduction_mw":"60.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":240,"contract_id":"AR4-IGS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"NEXTPOWER INKERSALL LIMITED","counterparty_registration_no":"08925401","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"Inkersall Grange Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.516669Z","start_date":"2026-01-05","expected_start_date":"2026-01-01","termination_date":null,"target_commissioning_date":"2025-10-01","target_commissioning_window_start_date":"2025-10-01","long_stop_date":"2027-01-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.13075000","longitude":"-1.06225000","coordinates":"N: 53.134, -1.058\nE: 53.134, -1.058\nS: 53.124, -1.06\nW: 53.131, -1.073","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":243,"contract_id":"AR4-LSF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"ND SOLAR ENTERPRISES LTD","counterparty_registration_no":"12062957","counterparty_address":"First Floor, 500 Pavilion Drive, Northampton Business Park, Northampton, NN4 7YJ, United Kingdom","project_name":"Litchardon Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.528494Z","start_date":"2025-01-06","expected_start_date":"2025-01-01","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2026-04-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.04800000","longitude":"-4.12125000","coordinates":"N: 51.051, -4.124\nE: 51.049, -4.109\nS: 51.042, -4.12\nW: 51.05, -4.132","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":199,"contract_id":"AR4-WCK-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"B17 SOLAR FARM LIMITED","counterparty_registration_no":"12951895","counterparty_address":"19th Floor 10 Upper Bank Street, London, EX1 3LH, United Kingdom","project_name":"Wickham","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.542057Z","start_date":null,"expected_start_date":"2028-04-03","termination_date":null,"target_commissioning_date":"2028-06-30","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"35.00","current_installed_capacity":"35.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.19850000","longitude":"1.40100000","coordinates":"N: 52.207, 1.397\nE: 52.19, 1.409\nS: 52.19, 1.405\nW: 52.207, 1.393","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":269,"contract_id":"AR4-TFO-900","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"WAVE HUB LIMITED","counterparty_registration_no":"07875270","counterparty_address":"Chi Gallos Hayle Marine Renewables Business Park, North Quay, Hayle, TR27 4DD, United Kingdom","project_name":"TwinHub Floating Offshore Wind Project","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.568552Z","start_date":null,"expected_start_date":"2027-03-30","termination_date":"2026-03-27","target_commissioning_date":"2027-03-30","target_commissioning_window_start_date":"2027-03-29","long_stop_date":"2029-03-29","initial_installed_capacity":"32.00","current_installed_capacity":"32.00","initial_strike_price":"87.30","current_strike_price":"128.87","latitude":"50.36400000","longitude":"-5.61100000","coordinates":"N: 50.383, -5.602\nE: 50.348, -5.593\nS: 50.345, -5.62\nW: 50.38, -5.629","technology_type":"Floating Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_L","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":225,"contract_id":"AR4-DRF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"DRIFFIELD SOLAR AND STORAGE LIMITED","counterparty_registration_no":"12540486","counterparty_address":"Uk House 5th Floor, 164-182 Oxford Street, London, W1D 1NN, United Kingdom","project_name":"Driffield","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.585492Z","start_date":"2026-01-08","expected_start_date":"2026-01-15","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-09-07","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.99150000","longitude":"-0.41075000","coordinates":"N: 53.997, -0.414\nE: 53.989, -0.403\nS: 53.985, -0.407\nW: 53.995, -0.419","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":233,"contract_id":"AR4-HHR-610","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"HAGSHAW HILL REPOWERING LTD","counterparty_registration_no":"SC603085","counterparty_address":"320 St. Vincent Street, Glasgow, G2 5AD, United Kingdom","project_name":"Hagshaw Hill Repowering","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.601359Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-03-31","initial_installed_capacity":"79.80","current_installed_capacity":"79.80","initial_strike_price":"42.47","current_strike_price":"57.75","latitude":"55.54950000","longitude":"-3.91425000","coordinates":"N: 55.561, -3.911\nE: 55.549, -3.898\nS: 55.543, -3.921\nW: 55.545, -3.927","technology_type":"Onshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_N","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":211,"contract_id":"AR4-BSF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"OAKLEY BUSH SOLAR LIMITED","counterparty_registration_no":"15419597","counterparty_address":"Buccleuch Property Estate Office, Weekley, Northamptonshire, Kettering, NN16 9UP, United Kingdom","project_name":"Brigstock Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.615359Z","start_date":null,"expected_start_date":"2027-11-01","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2027-02-28","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.44075000","longitude":"-0.64675000","coordinates":"N: 52.445, -0.643\nE: 52.44, -0.634\nS: 52.437, -0.65\nW: 52.441, -0.66","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":189,"contract_id":"AR4-SID-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SIDDINGTON SOLAR FARM LIMITED","counterparty_registration_no":"12589024","counterparty_address":"5 New Street Square, London, EC4A 3TW, United Kingdom","project_name":"Siddington Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.667182Z","start_date":"2025-08-14","expected_start_date":"2025-04-30","termination_date":null,"target_commissioning_date":"2024-11-15","target_commissioning_window_start_date":"2023-12-31","long_stop_date":"2026-02-13","initial_installed_capacity":"19.94","current_installed_capacity":"16.70","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.68875000","longitude":"-1.94925000","coordinates":"N: 51.692, -1.953\nE: 51.689, -1.945\nS: 51.685, -1.945\nW: 51.689, -1.954","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"2.94","capacity_whole_station":null,"polymorphic_ctype":6},{"id":228,"contract_id":"AR4-EAS-011","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"EAST ANGLIA THREE LIMITED","counterparty_registration_no":"08141208","counterparty_address":"3rd Floor, 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"EA3, Phase 1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.679002Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2027-03-31","long_stop_date":"2030-03-31","initial_installed_capacity":"375.59","current_installed_capacity":"288.91","initial_strike_price":"37.35","current_strike_price":"50.14","latitude":"52.58356750","longitude":"2.83715250","coordinates":"N: 52.6707, 2.86273\nE: 52.63244, 2.91779\nS: 52.50556, 2.80924\nW: 52.52557, 2.75885","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"_A","total_permitted_reduction_mw":"86.68","capacity_whole_station":null,"polymorphic_ctype":6},{"id":271,"contract_id":"AR4-WGL-710","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"WALPOLE GREEN LIMITED","counterparty_registration_no":"12517507","counterparty_address":"18 Riversway Business Village, Navigation Way, Ashton-on-Ribble, Preston, PR2 2YP, United Kingdom","project_name":"Walpole Green Limited","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.711804Z","start_date":null,"expected_start_date":"2026-12-17","termination_date":null,"target_commissioning_date":"2024-07-31","target_commissioning_window_start_date":"2025-09-16","long_stop_date":"2026-12-17","initial_installed_capacity":"40.00","current_installed_capacity":"34.20","initial_strike_price":"45.99","current_strike_price":"62.99","latitude":"52.72500000","longitude":"0.19175000","coordinates":"N: 52.726, 0.193\nE: 52.722, 0.2\nS: 52.724, 0.191\nW: 52.728, 0.183","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"5.80","capacity_whole_station":null,"polymorphic_ctype":6},{"id":209,"contract_id":"AR4-BRN-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"Links Solar Farm Limited","counterparty_registration_no":"13096914","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Braintree","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.724343Z","start_date":"2025-12-17","expected_start_date":"2025-12-17","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"26.00","current_installed_capacity":"26.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.86225000","longitude":"0.62300000","coordinates":"N: 51.867, 0.63\nE: 51.864, 0.634\nS: 51.858, 0.615\nW: 51.86, 0.613","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":184,"contract_id":"AR4-NFS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"SPRING DEV 03 LIMITED","counterparty_registration_no":"11977176","counterparty_address":"Leytonstone House, 3 Hanbury Drive, London, E11 1GA, United Kingdom","project_name":"North Fossil Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-06-12T01:00:07.675021Z","start_date":null,"expected_start_date":"2030-05-01","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"39.19","current_installed_capacity":"29.40","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"50.67250000","longitude":"-2.28950000","coordinates":"N: 50.677, -2.293\nE: 50.671, -2.282\nS: 50.668, -2.289\nW: 50.674, -2.294","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"9.79","capacity_whole_station":null,"polymorphic_ctype":6},{"id":150,"contract_id":"AR4-CLY-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"JBM SOLAR PROJECTS 17 LTD","counterparty_registration_no":"12140381","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Claydon","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"The Expected Start Date is under review by LCCC.","updated_at":"2026-10-21T01:00:04.860684Z","start_date":null,"expected_start_date":"2027-05-21","termination_date":null,"target_commissioning_date":"2025-01-01","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2027-05-21","initial_installed_capacity":"45.00","current_installed_capacity":"45.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.97100000","longitude":"-2.11350000","coordinates":"N: 51.979, -2.096\nE: 51.978, -2.09\nS: 51.963, -2.133\nW: 51.964, -2.135","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":267,"contract_id":"AR4-TBS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"Sonnedix Middlefield Limited","counterparty_registration_no":"08943711","counterparty_address":"90 Union Street, London, SE1 0NW, United Kingdom","project_name":"Thorpe Bank Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-09-10T01:00:09.375174Z","start_date":null,"expected_start_date":"2027-03-01","termination_date":null,"target_commissioning_date":"2025-01-01","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2027-03-13","initial_installed_capacity":"40.00","current_installed_capacity":"40.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"54.60525000","longitude":"-1.37950000","coordinates":"N: 54.617, -1.392\nE: 54.596, -1.362\nS: 54.594, -1.367\nW: 54.614, -1.397","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":265,"contract_id":"AR4-SCL-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"ST CLERES SOLAR FARM LIMITED","counterparty_registration_no":"12374724","counterparty_address":"Oxygen House Grenadier Road, Exeter Business Park, Exeter, EX1 3LH, United Kingdom","project_name":"St Cleres","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.746742Z","start_date":"2025-07-01","expected_start_date":"2025-06-30","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"15.00","current_installed_capacity":"15.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.72075000","longitude":"0.54800000","coordinates":"N: 51.725, 0.544\nE: 51.719, 0.561\nS: 51.719, 0.546\nW: 51.72, 0.541","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":193,"contract_id":"AR4-STV-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"INKERSALL SOLAR FARM LIMITED","counterparty_registration_no":"12057197","counterparty_address":"Oxygen House Grenadier Road, Exeter Business Park, Exeter, EX1 3LH, United Kingdom","project_name":"Staveley","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.758743Z","start_date":"2025-07-09","expected_start_date":"2025-06-30","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-06-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"53.24800000","longitude":"-1.35800000","coordinates":"N: 53.253, -1.356\nE: 53.249, -1.35\nS: 53.244, -1.362\nW: 53.246, -1.364","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":15,"contract_id":"AR3-DP3-303","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Doggerbank Offshore Wind Farm Project 3 Projco Limited","counterparty_registration_no":"07791977","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Dogger Bank C P3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-04-01T01:00:10.803884Z","start_date":null,"expected_start_date":"2027-07-01","termination_date":null,"target_commissioning_date":"2026-05-01","target_commissioning_window_start_date":"2025-12-01","long_stop_date":"2029-05-30","initial_installed_capacity":"456.60","current_installed_capacity":"456.60","initial_strike_price":"41.611","current_strike_price":"57.92","latitude":"55.09400000","longitude":"2.85125000","coordinates":"N: 55.119, 3.012\nE: 55.119, 3.012\nS: 55.02, 2.806\nW: 55.118, 2.575","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":94,"contract_id":"AR3-HHW-001","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Hesta Head Wind Farm Limited","counterparty_registration_no":"SC385374","counterparty_address":"C/O Hoolan Energy Lts, 2 West Regent Street, Glasgow, G2 1RS, United Kingdom","project_name":"Hesta Head Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-04-01T01:00:10.834190Z","start_date":null,"expected_start_date":"2028-06-30","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2023-04-30","long_stop_date":"2030-10-31","initial_installed_capacity":"20.40","current_installed_capacity":"20.40","initial_strike_price":"39.65","current_strike_price":"55.01","latitude":"58.77600000","longitude":"-2.94600000","coordinates":"N: 58.783, -2.944\nE: 58.777, -2.925\nS: 58.772, -2.953\nW: 58.772, -2.962","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":218,"contract_id":"AR3-CHW-002","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Costa Head Wind Farm Limited","counterparty_registration_no":"SC385352","counterparty_address":"C/O Hoolan Energy Ltd, 2 West Regent Street, Glasgow, G2 1RS, United Kingdom","project_name":"Costa Head Wind Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-04-01T01:00:10.856840Z","start_date":null,"expected_start_date":"2028-06-30","termination_date":null,"target_commissioning_date":"2027-03-31","target_commissioning_window_start_date":"2023-04-30","long_stop_date":"2030-10-31","initial_installed_capacity":"16.32","current_installed_capacity":"16.32","initial_strike_price":"39.65","current_strike_price":"55.01","latitude":"59.14800000","longitude":"-3.22825000","coordinates":"N: 59.154, -3.222\nE: 59.151, -3.208\nS: 59.139, -3.237\nW: 59.148, -3.246","technology_type":"Remote Island Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":96,"contract_id":"AR4-HPF-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"EEB17 LIMITED","counterparty_registration_no":"10790759","counterparty_address":"Peninsula House, Rydon Lane, Exeter, EX2 7HR, United Kingdom","project_name":"High Park Foot Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.868417Z","start_date":null,"expected_start_date":"2027-03-01","termination_date":null,"target_commissioning_date":"2025-12-31","target_commissioning_window_start_date":"2025-12-31","long_stop_date":"2027-03-31","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"55.05500000","longitude":"-2.77800000","coordinates":"N: 55.059, -2.771\nE: 55.055, -2.769\nS: 55.05, -2.785\nW: 55.056, -2.787","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_G","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":257,"contract_id":"AR4-RLS-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"RAG LANE SOLAR LIMITED","counterparty_registration_no":"12368134","counterparty_address":"120 King's Road, London, SW3 4TR, United Kingdom","project_name":"Rag Lane Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"The expected Start Date has been updated by the Generator.","updated_at":"2026-10-21T01:00:04.956399Z","start_date":"2026-10-05","expected_start_date":"2026-10-02","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2026-10-06","initial_installed_capacity":"42.00","current_installed_capacity":"38.84","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"51.59225000","longitude":"-2.43700000","coordinates":"N: 51.596, -2.443\nE: 51.592, -2.425\nS: 51.587, -2.434\nW: 51.594, -2.446","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"3.16","capacity_whole_station":null,"polymorphic_ctype":6},{"id":45,"contract_id":"AR3-SEW-103","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Seagreen Wind Energy Limited","counterparty_registration_no":"06873902","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Seagreen Phase 3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-04-01T01:00:10.923431Z","start_date":null,"expected_start_date":"2028-03-29","termination_date":null,"target_commissioning_date":"2027-03-30","target_commissioning_window_start_date":"2027-03-30","long_stop_date":"2030-09-29","initial_installed_capacity":"158.00","current_installed_capacity":"158.00","initial_strike_price":"41.611","current_strike_price":"57.92","latitude":"56.56575000","longitude":"-1.60975000","coordinates":"N: 56.617, -1.626\nE: 56.532, -1.489\nS: 56.529, -1.565\nW: 56.585, -1.759","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Scottish Territorial Waters","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":64,"contract_id":"AR4-BSP-700","allocation_round":"Allocation Round 4","scheme":"CfD","counterparty_name":"AURA POWER SOLAR UK 6 LTD","counterparty_registration_no":"11943139","counterparty_address":"First Floor, 500 Pavilion Drive, Northampton Business Park, Northampton, NN4 7YJ, United Kingdom","project_name":"Bishampton Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 4, 25 November 2021","comment":"","updated_at":"2026-04-01T01:00:10.934147Z","start_date":"2025-01-20","expected_start_date":"2025-01-01","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-01-01","long_stop_date":"2026-04-01","initial_installed_capacity":"30.00","current_installed_capacity":"30.00","initial_strike_price":"45.99","current_strike_price":"67.89","latitude":"52.16225000","longitude":"-2.00250000","coordinates":"N: 52.165, -2.002\nE: 52.163, -2\nS: 52.158, -2\nW: 52.163, -2.008","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_E","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":77,"contract_id":"AR3-DP3-301","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Doggerbank Offshore Wind Farm Project 3 Projco Limited","counterparty_registration_no":"07791977","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Dogger Bank C P1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-04-01T01:00:10.943970Z","start_date":null,"expected_start_date":"2027-07-01","termination_date":null,"target_commissioning_date":"2025-03-30","target_commissioning_window_start_date":"2025-03-30","long_stop_date":"2028-09-29","initial_installed_capacity":"302.40","current_installed_capacity":"302.40","initial_strike_price":"41.611","current_strike_price":"57.92","latitude":"55.00400000","longitude":"2.70950000","coordinates":"N: 55.051, 2.576\nE: 54.957, 2.843\nS: 54.957, 2.843\nW: 55.051, 2.576","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":266,"contract_id":"INV-TEE-001","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"MGT Teesside Limited","counterparty_registration_no":"06574235","counterparty_address":"8 White Oak Square, London Road, Swanley, BR8 7AG, United Kingdom","project_name":"Teesside Renewable Energy Project","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:10.993178Z","start_date":"2023-09-30","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2018-03-31","target_commissioning_window_start_date":"2018-07-31","long_stop_date":"2023-09-30","initial_installed_capacity":"299.00","current_installed_capacity":"287.516","initial_strike_price":"125.00","current_strike_price":"183.45","latitude":"54.60050000","longitude":"-1.16050000","coordinates":"N: 54.6, -1.165\nE: 54.603, -1.16\nS: 54.601, -1.156\nW: 54.598, -1.161","technology_type":"Dedicated Biomass","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":true,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":"299.0000","polymorphic_ctype":6},{"id":516,"contract_id":"AR7-STB-700","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"LOW CARBON SOLAR PARK 27 LIMITED","counterparty_registration_no":"13813338","counterparty_address":"Stirling Square, 5-7 Carlton Gardens, London, SW1Y 5AD, United Kingdom","project_name":"Stowmarket","base_year":2024,"agreement_type":"Generic","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-05-07T01:00:07.789794Z","start_date":null,"expected_start_date":"2030-03-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-30","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"65.23","current_strike_price":"68.94","latitude":"52.20375000","longitude":"1.05900000","coordinates":"N: 52.21, 1.062\nE: 52.205, 1.065\nS: 52.2, 1.055\nW: 52.2, 1.054","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":null,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":515,"contract_id":"AR7-BBP-012","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BERWICK BANK B LIMITED","counterparty_registration_no":"13884182","counterparty_address":"No. 1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Berwick Bank Phase B (Phase 2)","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-25T01:00:06.835333Z","start_date":null,"expected_start_date":"2031-04-01","termination_date":null,"target_commissioning_date":"2031-04-01","target_commissioning_window_start_date":"2031-04-01","long_stop_date":"2034-03-31","initial_installed_capacity":"460.00","current_installed_capacity":"460.00","initial_strike_price":"89.49","current_strike_price":"95.23","latitude":"56.19200000","longitude":"-1.62700000","coordinates":"N: 56.217, -1.644\nE: 56.198, -1.48\nS: 56.15, -1.692\nW: 56.203, -1.692","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":13,"contract_id":"AR3-DP1-103","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Doggerbank Offshore Wind Farm Project 1 Projco Limited","counterparty_registration_no":"07791991","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Dogger Bank A P3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-07-01T01:00:06.912044Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2024-05-01","target_commissioning_window_start_date":"2023-12-01","long_stop_date":"2027-05-30","initial_installed_capacity":"456.60","current_installed_capacity":"456.60","initial_strike_price":"39.65","current_strike_price":"55.01","latitude":"54.72575000","longitude":"1.93150000","coordinates":"N: 54.783, 1.86\nE: 54.75, 2.128\nS: 54.659, 1.977\nW: 54.711, 1.761","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":221,"contract_id":"AR3-DP1-102","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Doggerbank Offshore Wind Farm Project 1 Projco Limited","counterparty_registration_no":"07791991","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Dogger Bank A P2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-07-01T01:00:06.940443Z","start_date":null,"expected_start_date":"2027-01-31","termination_date":null,"target_commissioning_date":"2024-01-01","target_commissioning_window_start_date":"2023-08-01","long_stop_date":"2027-01-31","initial_installed_capacity":"441.00","current_installed_capacity":"441.00","initial_strike_price":"39.65","current_strike_price":"55.01","latitude":"54.80800000","longitude":"2.04925000","coordinates":"N: 54.838, 2.174\nE: 54.809, 2.227\nS: 54.75, 2.128\nW: 54.835, 1.668","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":47,"contract_id":"AR3-SOW-103","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Sofia Offshore Wind Farm","counterparty_registration_no":"07791964","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Sofia Offshore Wind Farm Phase 3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-09-24T01:00:11.243727Z","start_date":null,"expected_start_date":"2027-04-01","termination_date":null,"target_commissioning_date":"2026-03-29","target_commissioning_window_start_date":"2025-10-30","long_stop_date":"2029-11-03","initial_installed_capacity":"616.00","current_installed_capacity":"616.00","initial_strike_price":"39.65","current_strike_price":"55.01","latitude":"54.98000000","longitude":"2.36525000","coordinates":"N: 55.058, 2.346\nE: 54.971, 2.502\nS: 54.901, 2.384\nW: 54.99, 2.229","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3","gsp_group":"_F","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":98,"contract_id":"AR2-HRN-306","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Sonningmay Wind Ltd","counterparty_registration_no":"10722635","counterparty_address":"Orsted, 5 Howick Place, 5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Project 2 Phase 3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2026-04-01T01:00:11.005008Z","start_date":"2024-03-28","expected_start_date":"2024-03-28","termination_date":null,"target_commissioning_date":"2024-04-02","target_commissioning_window_start_date":"2023-04-03","long_stop_date":"2026-04-02","initial_installed_capacity":"462.00","current_installed_capacity":"453.92","initial_strike_price":"57.50","current_strike_price":"82.49","latitude":"53.90500000","longitude":"1.59975000","coordinates":"N: 53.939, 1.631\nE: 53.926, 1.673\nS: 53.835, 1.65\nW: 53.92, 1.445","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":133,"contract_id":"AR2-TKN-103","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Triton Knoll Offshore Wind Farm Limited","counterparty_registration_no":"03696654","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Triton Knoll Offshore Wind Farm Phase 1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2026-04-01T01:00:11.016822Z","start_date":"2021-05-17","expected_start_date":"2021-05-17","termination_date":null,"target_commissioning_date":"2022-03-31","target_commissioning_window_start_date":"2021-04-01","long_stop_date":"2024-03-31","initial_installed_capacity":"219.00","current_installed_capacity":"216.60","initial_strike_price":"74.75","current_strike_price":"108.20","latitude":"53.47225000","longitude":"0.80300000","coordinates":"N: 53.514, 0.783\nE: 53.451, 0.89\nS: 53.437, 0.848\nW: 53.487, 0.691","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":134,"contract_id":"AR2-TKN-303","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Triton Knoll Offshore Wind Farm Limited","counterparty_registration_no":"03696654","counterparty_address":"Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB, United Kingdom","project_name":"Triton Knoll Offshore Wind Farm Phase 3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2026-04-01T01:00:11.027628Z","start_date":"2023-03-31","expected_start_date":"2023-04-01","termination_date":null,"target_commissioning_date":"2022-08-28","target_commissioning_window_start_date":"2021-08-29","long_stop_date":"2024-08-28","initial_installed_capacity":"429.00","current_installed_capacity":"423.70","initial_strike_price":"74.75","current_strike_price":"108.20","latitude":"53.45800000","longitude":"0.90175000","coordinates":"N: 53.538, 0.861\nE: 53.409, 0.994\nS: 53.409, 0.934\nW: 53.476, 0.818","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":56,"contract_id":"INV-WAL-001","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Walney Extension Limited","counterparty_registration_no":"07306956","counterparty_address":"Orsted, 5 Howick Place, 5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Walney Extension Offshore Wind Farm Phase 1","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:11.057301Z","start_date":"2017-12-19","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2017-03-31","target_commissioning_window_start_date":"2017-03-31","long_stop_date":"2020-03-30","initial_installed_capacity":"330.00","current_installed_capacity":"330.00","initial_strike_price":"150.00","current_strike_price":"220.95","latitude":"54.11400000","longitude":"-3.80225000","coordinates":"N: 54.159, -3.777\nE: 54.096, -3.749\nS: 54.065, -3.764\nW: 54.136, -3.919","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Extension","gsp_group":"_G","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":80,"contract_id":"INV-DUD-001","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Dudgeon Offshore Wind Limited","counterparty_registration_no":"04418909","counterparty_address":"1 Kingdom Street, London, W2 6BD, United Kingdom","project_name":"Dudgeon Phase 1","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:11.068569Z","start_date":"2017-04-27","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2017-03-01","target_commissioning_window_start_date":"2017-03-01","long_stop_date":"2020-02-28","initial_installed_capacity":"90.00","current_installed_capacity":"88.54","initial_strike_price":"150.00","current_strike_price":"220.95","latitude":"53.23150000","longitude":"1.40000000","coordinates":"N: 53.267, 1.377\nE: 53.21, 1.429\nS: 53.209, 1.429\nW: 53.24, 1.365","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Round 2","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":203,"contract_id":"INV-BEA-002","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Beatrice Offshore Windfarm Limited","counterparty_registration_no":"SC350248","counterparty_address":"Inveralmond House, 200 Dunkeld Road, 200 Dunkeld Road, Perth, PH1 3AQ, United Kingdom","project_name":"Beatrice Offshore Wind Farm Limited (Phase 2)","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:11.078721Z","start_date":"2019-04-28","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2019-03-31","target_commissioning_window_start_date":"2019-03-31","long_stop_date":"2022-03-30","initial_installed_capacity":"384.00","current_installed_capacity":"336.00","initial_strike_price":"140.00","current_strike_price":"205.70","latitude":"58.28525000","longitude":"-2.84100000","coordinates":"N: 58.329, -2.849\nE: 58.3, -2.752\nS: 58.225, -2.844\nW: 58.287, -2.919","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Scottish Territorial Waters","gsp_group":"_P","total_permitted_reduction_mw":"48.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":214,"contract_id":"INV-BUR-001","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Burbo Extension Limited","counterparty_registration_no":"07307131","counterparty_address":"Orsted, 5 Howick Place, 5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Burbo Bank Extension Offshore Wind Farm","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:11.089970Z","start_date":"2017-04-11","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2017-03-31","target_commissioning_window_start_date":"2017-03-31","long_stop_date":"2020-03-30","initial_installed_capacity":"258.00","current_installed_capacity":"258.00","initial_strike_price":"150.00","current_strike_price":"220.95","latitude":"53.48500000","longitude":"-3.20375000","coordinates":"N: 53.503, -3.22\nE: 53.47, -3.179\nS: 53.464, -3.196\nW: 53.503, -3.22","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Extension","gsp_group":"_D","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":237,"contract_id":"INV-HOR-002","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Hornsea 1 Limited","counterparty_registration_no":"07640868","counterparty_address":"Orsted, 5 Howick Place, 5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Offshore Wind Farm Phase 2","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:11.100296Z","start_date":"2020-03-31","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2020-03-31","target_commissioning_window_start_date":"2020-03-31","long_stop_date":"2023-03-30","initial_installed_capacity":"400.00","current_installed_capacity":"400.00","initial_strike_price":"140.00","current_strike_price":"206.06","latitude":"53.87250000","longitude":"2.13425000","coordinates":"N: 53.957, 2.102\nE: 53.836, 2.233\nS: 53.821, 2.194\nW: 53.876, 2.008","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Round 3","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":36,"contract_id":"AR2-MRY-207","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Moray Offshore Windfarm (East) Limited","counterparty_registration_no":"07101438","counterparty_address":"Shepherd And Wedderburn Llp Octagon Point, 5 Cheapside, 5 Cheapside, London, EC2V 6AA, United Kingdom","project_name":"Moray Offshore Windfarm (East) Phase 2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2026-04-01T01:00:11.118270Z","start_date":"2024-03-04","expected_start_date":"2024-03-04","termination_date":null,"target_commissioning_date":"2022-04-02","target_commissioning_window_start_date":"2022-04-02","long_stop_date":"2025-04-01","initial_installed_capacity":"313.50","current_installed_capacity":"309.363","initial_strike_price":"57.50","current_strike_price":"82.34","latitude":"58.14750000","longitude":"-2.78350000","coordinates":"N: 58.323, -2.738\nE: 58.135, -2.57\nS: 58.066, -2.913\nW: 58.066, -2.913","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":113,"contract_id":"AR2-MRY-307","allocation_round":"Allocation Round 2","scheme":"CfD","counterparty_name":"Moray Offshore Windfarm (East) Limited","counterparty_registration_no":"07101438","counterparty_address":"Shepherd And Wedderburn Llp Octagon Point, 5 Cheapside, 5 Cheapside, London, EC2V 6AA, United Kingdom","project_name":"Moray Offshore Windfarm (East) Phase 3","base_year":2012,"agreement_type":"Phased","contract_version":"Version 2, 01 March 2017","comment":"","updated_at":"2026-04-01T01:00:11.128326Z","start_date":"2024-03-04","expected_start_date":"2024-03-04","termination_date":null,"target_commissioning_date":"2022-04-03","target_commissioning_window_start_date":"2022-04-03","long_stop_date":"2025-04-02","initial_installed_capacity":"323.00","current_installed_capacity":"318.77","initial_strike_price":"57.50","current_strike_price":"82.34","latitude":"58.12475000","longitude":"-2.78350000","coordinates":"N: 58.232, -2.738\nE: 58.135, -2.57\nS: 58.066, -2.913\nW: 58.066, -2.913","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":27,"contract_id":"INV-HOR-003","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Hornsea 1 Limited","counterparty_registration_no":"07640868","counterparty_address":"Orsted, 5 Howick Place, 5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Offshore Wind Farm Phase 3","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:11.144775Z","start_date":"2021-03-31","expected_start_date":"2021-03-31","termination_date":null,"target_commissioning_date":"2019-03-31","target_commissioning_window_start_date":"2021-03-31","long_stop_date":"2024-03-30","initial_installed_capacity":"400.00","current_installed_capacity":"400.00","initial_strike_price":"140.00","current_strike_price":"206.06","latitude":"53.87625000","longitude":"1.75150000","coordinates":"N: 53.978, 1.742\nE: 53.858, 1.819\nS: 53.834, 1.795\nW: 53.835, 1.65","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"Round 3","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":79,"contract_id":"INV-DRX-001","allocation_round":"Investment Contract","scheme":"CfD","counterparty_name":"Drax Power Limited","counterparty_registration_no":"04883589","counterparty_address":"Drax Power Station, Selby, YO8 8PH, United Kingdom","project_name":"Drax 3rd conversion unit (unit 1)","base_year":2012,"agreement_type":"Investment","contract_version":"Investment Contract","comment":"","updated_at":"2026-04-01T01:00:11.166804Z","start_date":"2016-12-21","expected_start_date":null,"termination_date":null,"target_commissioning_date":"2016-02-01","target_commissioning_window_start_date":"2015-07-01","long_stop_date":"2019-11-19","initial_installed_capacity":"645.00","current_installed_capacity":"645.00","initial_strike_price":"100.00","current_strike_price":"146.51","latitude":"53.73450000","longitude":"-0.99700000","coordinates":"N: 53.735, -0.997\nE: 53.735, -0.995\nS: 53.734, -0.998\nW: 53.734, -0.998","technology_type":"Biomass Conversion","cfd_dual_scheme":true,"connection":"Direct","network_type":"Transmission","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_M","total_permitted_reduction_mw":"0.00","capacity_whole_station":"645.0000","polymorphic_ctype":6},{"id":517,"contract_id":"AR7-BBP-013","allocation_round":"Allocation Round 7","scheme":"CfD","counterparty_name":"BERWICK BANK B LIMITED","counterparty_registration_no":"13884182","counterparty_address":"No. 1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Berwick Bank Phase B (Phase 3)","base_year":2024,"agreement_type":"Phased","contract_version":"Version 7 (24 July 2025)","comment":"","updated_at":"2026-06-25T01:00:06.966274Z","start_date":null,"expected_start_date":"2031-05-01","termination_date":null,"target_commissioning_date":"2031-05-01","target_commissioning_window_start_date":"2031-05-01","long_stop_date":"2034-04-30","initial_installed_capacity":"460.00","current_installed_capacity":"460.00","initial_strike_price":"89.49","current_strike_price":"95.23","latitude":"56.16750000","longitude":"-1.42375000","coordinates":"N: 56.216, -1.396\nE: 56.152, -1.301\nS: 56.151, -1.499\nW: 56.151, -1.499","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"","cfd_unit_comb_heatpower":null,"metering_arrangement":"Single","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":126,"contract_id":"AR3-SEW-101","allocation_round":"Allocation Round 3","scheme":"CfD","counterparty_name":"Seagreen Wind Energy Limited","counterparty_registration_no":"06873902","counterparty_address":"No.1 Forbury Place, 43 Forbury Road, Reading, RG1 3JH, United Kingdom","project_name":"Seagreen Phase 1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 3, 01 May 2019","comment":"","updated_at":"2026-09-04T01:00:08.713925Z","start_date":null,"expected_start_date":"2027-03-31","termination_date":null,"target_commissioning_date":"2025-03-31","target_commissioning_window_start_date":"2025-03-31","long_stop_date":"2028-09-30","initial_installed_capacity":"138.00","current_installed_capacity":"138.00","initial_strike_price":"41.611","current_strike_price":"57.92","latitude":"56.57975000","longitude":"-1.83425000","coordinates":"N: 56.677, -1.87\nE: 56.528, -1.589\nS: 56.513, -1.94\nW: 56.601, -1.938","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Single","offshore_leasing":"Scottish Territorial Waters","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":295,"contract_id":"AR6-CHA-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"SONNEDIX WESTON LTD","counterparty_registration_no":"13987895","counterparty_address":"90 Union Street, London, SE1 0NW, United Kingdom","project_name":"Charleston","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.000492Z","start_date":null,"expected_start_date":"2027-02-01","termination_date":null,"target_commissioning_date":"2027-03-01","target_commissioning_window_start_date":"2027-02-01","long_stop_date":"2028-05-01","initial_installed_capacity":"20.00","current_installed_capacity":"20.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"56.48850000","longitude":"-3.05900000","coordinates":"N: 56.492, -3.061\nE: 56.491, -3.051\nS: 56.484, -3.062\nW: 56.487, -3.062","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":380,"contract_id":"AR6-SEO-504","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"SEASTAR TIDAL LTD","counterparty_registration_no":"SC790196","counterparty_address":"45 Timber Bush, Edinburgh, EH6 6QH, United Kingdom","project_name":"SEASTAR 1","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-13T01:00:09.223630Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":"2026-05-12","target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-31","initial_installed_capacity":"4.00","current_installed_capacity":"4.00","initial_strike_price":"172.00","current_strike_price":"253.90","latitude":"59.15375000","longitude":"-2.83150000","coordinates":"N: 59.157, -2.828\nE: 59.153, -2.825\nS: 59.151, -2.835\nW: 59.154, -2.838","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":369,"contract_id":"AR6-OCF-504","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"OCEANSTAR TIDAL LTD","counterparty_registration_no":"SC790200","counterparty_address":"45 Timber Bush, Edinburgh, EH6 6QH, United Kingdom","project_name":"OCEANSTAR 5","base_year":2012,"agreement_type":"Private Network","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-13T01:00:09.238360Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":"2026-05-12","target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-31","initial_installed_capacity":"0.50","current_installed_capacity":"0.50","initial_strike_price":"172.00","current_strike_price":"253.90","latitude":"59.14550000","longitude":"-2.82950000","coordinates":"N: 59.148, -2.824\nE: 59.146, -2.823\nS: 59.143, -2.835\nW: 59.145, -2.836","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Partial","network_type":"Distribution","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":390,"contract_id":"AR6-TES-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EEB47 LIMITED","counterparty_registration_no":"12169058","counterparty_address":"The Old Rectory, Church Street, Weybridge, KT13 8DE, United Kingdom","project_name":"Thorpe Estate Solar PV","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-23T01:00:05.657764Z","start_date":null,"expected_start_date":"2027-06-30","termination_date":null,"target_commissioning_date":"2026-04-01","target_commissioning_window_start_date":"2026-03-31","long_stop_date":"2028-12-31","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.67675000","longitude":"-1.64325000","coordinates":"N: 52.683, -1.643\nE: 52.676, -1.636\nS: 52.67, -1.644\nW: 52.678, -1.65","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":324,"contract_id":"AR6-GVO-910","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"GREEN VOLT OFFSHORE WINDFARM LTD","counterparty_registration_no":"SC698787","counterparty_address":"C/O CMS CAMERON MCKENNA NABARRO OLSWANG LLP 4TH FLOOR, SALTIRE COURT, 20 CASTLE TERRACE, Edinburgh, MIDLOTHIAN, EH1 2EN, United Kingdom","project_name":"Green Volt Offshore Windfarm (GV01)","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-06-16T01:00:06.674951Z","start_date":null,"expected_start_date":"2029-03-31","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2031-03-31","initial_installed_capacity":"400.00","current_installed_capacity":"400.00","initial_strike_price":"139.93","current_strike_price":"208.00","latitude":"57.88100000","longitude":"-0.62650000","coordinates":"N: 57.931, -0.623\nE: 57.879, -0.518\nS: 57.831, -0.63\nW: 57.883, -0.735","technology_type":"Floating Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":341,"contract_id":"AR6-ICB-010","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"INCH CAPE OFFSHORE LIMITED","counterparty_registration_no":"SC373173","counterparty_address":"Ground Floor, New Clarendon, 114-116 George Street, Edinburgh, EH2 4LH, United Kingdom","project_name":"Inch Cape B","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-10-31T01:00:07.434801Z","start_date":null,"expected_start_date":"2027-07-31","termination_date":null,"target_commissioning_date":"2027-12-31","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2030-04-01","initial_installed_capacity":"88.70","current_installed_capacity":"88.70","initial_strike_price":"54.23","current_strike_price":"80.61","latitude":"56.49325000","longitude":"-2.27325000","coordinates":"N: 56.534, -2.279\nE: 56.478, -2.242\nS: 56.475, -2.285\nW: 56.486, -2.287","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":333,"contract_id":"AR6-HPT-010","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"ORSTED HORNSEA PROJECT THREE (UK) LIMITED","counterparty_registration_no":"08584210","counterparty_address":"5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Project Three Offshore Wind Farm AR6 A","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-04-01T01:00:11.595474Z","start_date":null,"expected_start_date":"2027-06-01","termination_date":null,"target_commissioning_date":"2027-04-01","target_commissioning_window_start_date":"2026-12-01","long_stop_date":"2029-12-01","initial_installed_capacity":"360.00","current_installed_capacity":"360.00","initial_strike_price":"54.23","current_strike_price":"80.61","latitude":"53.75175000","longitude":"2.65875000","coordinates":"N: 53.802, 2.667\nE: 53.719, 2.728\nS: 53.711, 2.725\nW: 53.775, 2.515","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":313,"contract_id":"AR6-EAA-011","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EAST ANGLIA TWO LIMITED","counterparty_registration_no":"11121842","counterparty_address":"3rd Floor 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"East Anglia Two, Phase 1","base_year":2012,"agreement_type":"Phased","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-04-01T01:00:11.626520Z","start_date":null,"expected_start_date":"2028-05-01","termination_date":null,"target_commissioning_date":"2028-05-01","target_commissioning_window_start_date":"2028-05-01","long_stop_date":"2031-05-01","initial_installed_capacity":"255.82","current_installed_capacity":"255.82","initial_strike_price":"58.87","current_strike_price":"87.51","latitude":"52.19825000","longitude":"2.19375000","coordinates":"N: 52.251, 2.22\nE: 52.213, 2.241\nS: 52.146, 2.182\nW: 52.183, 2.132","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":314,"contract_id":"AR6-EAA-012","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"EAST ANGLIA TWO LIMITED","counterparty_registration_no":"11121842","counterparty_address":"3rd Floor 1 Tudor Street, London, EC4Y 0AH, United Kingdom","project_name":"East Anglia Two, Phase 2","base_year":2012,"agreement_type":"Phased","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-04-01T01:00:11.639036Z","start_date":null,"expected_start_date":"2028-06-17","termination_date":null,"target_commissioning_date":"2028-06-17","target_commissioning_window_start_date":"2028-06-17","long_stop_date":"2031-06-17","initial_installed_capacity":"346.10","current_installed_capacity":"346.10","initial_strike_price":"58.87","current_strike_price":"87.51","latitude":"52.11425000","longitude":"2.27075000","coordinates":"N: 52.213, 2.241\nE: 52.049, 2.33\nS: 52.049, 2.33\nW: 52.146, 2.182","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"Apportioned","offshore_leasing":"Round 3/Scottish Territorial Waters","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":305,"contract_id":"AR6-CSO-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"BOULTBEE BROOKS (RENEWABLES COSTOCK) LIMITED","counterparty_registration_no":"12955976","counterparty_address":"Formal House, 60 St. Georges Place, Cheltenham, GL50 3PN, United Kingdom","project_name":"Costock Solar Farm","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.270791Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2026-04-01","long_stop_date":"2029-01-01","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.84100000","longitude":"-1.13100000","coordinates":"N: 52.849, -1.141\nE: 52.849, -1.121\nS: 52.833, -1.121\nW: 52.833, -1.141","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Connected","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":334,"contract_id":"AR6-HPR-010","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"ORSTED HORNSEA PROJECT THREE (UK) LIMITED","counterparty_registration_no":"08584210","counterparty_address":"5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Project Three Offshore Wind Farm AR6 B","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-04-01T01:00:11.688565Z","start_date":null,"expected_start_date":"2027-10-01","termination_date":null,"target_commissioning_date":"2027-08-01","target_commissioning_window_start_date":"2027-08-01","long_stop_date":"2030-08-01","initial_installed_capacity":"360.00","current_installed_capacity":"360.00","initial_strike_price":"54.23","current_strike_price":"80.61","latitude":"53.83125000","longitude":"2.42950000","coordinates":"N: 53.897, 2.406\nE: 53.783, 2.488\nS: 53.783, 2.488\nW: 53.862, 2.336","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":335,"contract_id":"AR6-HOP-010","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"ORSTED HORNSEA PROJECT THREE (UK) LIMITED","counterparty_registration_no":"08584210","counterparty_address":"5 Howick Place, London, SW1P 1WG, United Kingdom","project_name":"Hornsea Project Three Offshore Wind Farm AR6 C","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-04-01T01:00:11.698967Z","start_date":null,"expected_start_date":"2027-12-01","termination_date":null,"target_commissioning_date":"2027-10-01","target_commissioning_window_start_date":"2027-10-01","long_stop_date":"2030-10-01","initial_installed_capacity":"360.00","current_installed_capacity":"360.00","initial_strike_price":"54.23","current_strike_price":"80.61","latitude":"53.92500000","longitude":"2.29425000","coordinates":"N: 53.975, 2.222\nE: 53.888, 2.406\nS: 53.862, 2.336\nW: 53.975, 2.213","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":361,"contract_id":"AR6-MOW-010","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"MORAY OFFSHORE WINDFARM (WEST) LIMITED","counterparty_registration_no":"10515140","counterparty_address":"Octagon Point, 5 Cheapside, London, EC2V 6AA, United Kingdom","project_name":"Moray Offshore Windfarm (West) String 9","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-04-01T01:00:11.751953Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2027-04-01","long_stop_date":"2030-04-01","initial_installed_capacity":"73.50","current_installed_capacity":"73.50","initial_strike_price":"54.23","current_strike_price":"80.61","latitude":"58.10925000","longitude":"-2.91275000","coordinates":"N: 58.125, -2.911\nE: 58.121, -2.884\nS: 58.077, -2.921\nW: 58.114, -2.935","technology_type":"Offshore Wind","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":339,"contract_id":"AR6-HWS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"HW SOLAR FARM LIMITED","counterparty_registration_no":"13214620","counterparty_address":"1st Floor 25 King Street, Bristol, BS1 4PB, United Kingdom","project_name":"HW SOLAR FARM LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.462258Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.82325000","longitude":"1.11875000","coordinates":"N: 51.831, 1.116\nE: 51.823, 1.125\nS: 51.819, 1.118\nW: 51.82, 1.116","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":358,"contract_id":"AR6-MED-510","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"MeyGen PLC","counterparty_registration_no":"SC347501","counterparty_address":"26 Dublin Street, Edinburgh, EH3 6NN, United Kingdom","project_name":"MeyGen AR62","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.600830Z","start_date":null,"expected_start_date":"2031-06-30","termination_date":null,"target_commissioning_date":"2029-03-31","target_commissioning_window_start_date":"2029-03-31","long_stop_date":"2032-12-14","initial_installed_capacity":"9.00","current_installed_capacity":"9.00","initial_strike_price":"172.00","current_strike_price":"255.67","latitude":"58.65950000","longitude":"-3.13150000","coordinates":"N: 58.663, -3.141\nE: 58.661, -3.11\nS: 58.655, -3.132\nW: 58.659, -3.143","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":401,"contract_id":"AR6-YLT-510","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"HYDROWING TIDAL PROJECTS LIMITED","counterparty_registration_no":"13839335","counterparty_address":"M S Parc, Parc Gwyddoniaeth Menai, Gaerwen, Ynys Mon, LL60 6AG, United Kingdom","project_name":"Ynnir Lleuad 2","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-04-01T01:00:12.006293Z","start_date":null,"expected_start_date":"2028-06-01","termination_date":null,"target_commissioning_date":"2028-06-01","target_commissioning_window_start_date":"2027-11-01","long_stop_date":"2029-11-01","initial_installed_capacity":"10.00","current_installed_capacity":"10.00","initial_strike_price":"172.00","current_strike_price":"255.67","latitude":"53.31475000","longitude":"-4.70550000","coordinates":"N: 53.324, -4.703\nE: 53.324, -4.695\nS: 53.305, -4.708\nW: 53.306, -4.716","technology_type":"Tidal Stream","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":362,"contract_id":"AR6-NEC-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"NEXTPOWER SPV 7 LIMITED","counterparty_registration_no":"12039488","counterparty_address":"5th Floor North Side, 7/10 Chandos Street, Cavendish Square, London, W1G 9DQ, United Kingdom","project_name":"NEXTPOWER CHAPEL LIMITED","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.632347Z","start_date":null,"expected_start_date":"2028-01-01","termination_date":null,"target_commissioning_date":"2028-01-01","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"18.00","current_installed_capacity":"17.30","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"52.58425000","longitude":"-1.34400000","coordinates":"N: 52.587, -1.339\nE: 52.586, -1.336\nS: 52.58, -1.344\nW: 52.584, -1.357","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_B","total_permitted_reduction_mw":"0.70","capacity_whole_station":null,"polymorphic_ctype":6},{"id":366,"contract_id":"AR6-NDS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"NORTH DAIRY FARM SOLAR PARK LIMITED","counterparty_registration_no":"12320297","counterparty_address":"35 And 35a The Maltings Lower Charlton Trading Estate, Shepton Mallet, BA4 5QE, United Kingdom","project_name":"North Dairy Solar Park","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.642618Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"47.00","current_installed_capacity":"47.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"50.87200000","longitude":"-2.38700000","coordinates":"N: 50.879, -2.382\nE: 50.872, -2.38\nS: 50.865, -2.391\nW: 50.872, -2.395","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_H","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":373,"contract_id":"AR6-PAS-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"PARKGATE FARM SOLAR LIMITED","counterparty_registration_no":"13094088","counterparty_address":"6th Floor, Capital Tower, 91 Waterloo Road, London, SE1 8RT, United Kingdom","project_name":"Parkgate Farm Solar","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-07-15T01:00:08.087610Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2030-04-01","initial_installed_capacity":"18.00","current_installed_capacity":"18.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"51.83525000","longitude":"0.63700000","coordinates":"N: 51.839, 0.631\nE: 51.836, 0.647\nS: 51.831, 0.639\nW: 51.835, 0.631","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":326,"contract_id":"AR6-GUR-710","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"ENSO GREEN HOLDINGS R LIMITED","counterparty_registration_no":"13328511","counterparty_address":"17th Floor Hylo, 103-105 Bunhill Row, London, EC1Y 8LZ, United Kingdom","project_name":"Gunthorpe Road","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.821920Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-03-31","long_stop_date":"2029-06-30","initial_installed_capacity":"49.90","current_installed_capacity":"49.90","initial_strike_price":"50.07","current_strike_price":"74.43","latitude":"52.73400000","longitude":"0.17850000","coordinates":"N: 52.739, 0.182\nE: 52.737, 0.191\nS: 52.729, 0.171\nW: 52.731, 0.17","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Transmission","licence_status":"Not Applicable","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_A","total_permitted_reduction_mw":"0.00","capacity_whole_station":null,"polymorphic_ctype":6},{"id":372,"contract_id":"AR6-HEE-700","allocation_round":"Allocation Round 6","scheme":"CfD","counterparty_name":"PARK HILL ENERGY EXTENSION LIMITED","counterparty_registration_no":"14141694","counterparty_address":"80 Strand, London, WC2R0DT, United Kingdom","project_name":"Park Hill Energy Extension","base_year":2012,"agreement_type":"Generic","contract_version":"Version 6, 13 March 2024","comment":"","updated_at":"2026-05-07T01:00:08.831539Z","start_date":null,"expected_start_date":"2028-03-31","termination_date":null,"target_commissioning_date":"2028-03-31","target_commissioning_window_start_date":"2028-01-01","long_stop_date":"2029-04-01","initial_installed_capacity":"9.90","current_installed_capacity":"8.00","initial_strike_price":"50.07","current_strike_price":"73.91","latitude":"56.59875000","longitude":"-2.59050000","coordinates":"N: 56.601, -2.591\nE: 56.598, -2.586\nS: 56.596, -2.591\nW: 56.6, -2.594","technology_type":"Solar PV","cfd_dual_scheme":false,"connection":"Direct","network_type":"Distribution","licence_status":"Licence Exempt Embedded","cfd_unit_comb_heatpower":false,"metering_arrangement":"","offshore_leasing":"","gsp_group":"_P","total_permitted_reduction_mw":"1.90","capacity_whole_station":null,"polymorphic_ctype":6}]